Rural Development And Panchayats Department has published Improvements Of Burial Ground ( Waiting Shed, Compound Wall 60M ) Sundekuppam H / O.Sundekuppam - Rs.7.80419 / - Lakhs. Submission Date for this Tender is 21-07-2022. Shed Construction Tenders in krishnagiri Tamil Nadu. Bidders can get complete Tender details and download the document.
Sr No | CorrigendumDate | Corrignedum | CorrigendumType | NewSubmissionDate |
1 | 14-Jul-2022 | Corrigendum for Date | Date | 21-07-2022 |
Sl. No. | Item Description |
1 | Improvements of burial ground (Waiting shed, compound wall 60m) Sundekuppam H/o.Sundekuppam - Rs.7.80419/- Lakhs |
2 | Earth work excavation for foundation in all soils and sub soils to full depth etc., ordinary soil complete |
3 | Cement concrete 1:4:8 (one cement, four sand, and Eight hard broken stone) Using 40mm ISS size Hand Broken granite stone Jelly for Foundation and Flooring including labour charges for mixing concrete watering and laying the concrete |
4 | Random Rubble Masonry in cement Mortar 1 : 5 for foundation and basement using New Stones including necessary provision for Bond stones with simultaneous flush pointing with the same mortar above ground level complying with standard specifications. |
5 | Refilling in foundation and basement with excavated earth in layer of not more than 15 cm thick |
6 | Brick work in CM 1:5 mix using country bricks ground moulded of size 22 x 11 x 7cm for the following including curing etc., complete complying with standard specifications. |
7 | Supplying and erecting steel centering for plane surfaces in foundation and basement for staircase steps column footings plinth beam grade beam etc., |
8 | Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc,Complete complying with stanard specification.(MS |
9 | Cement Concrete 1:1.5:3 (one cement one and half sand and three machine broken stone) using 20 mm ISS gauge machine broken HBG metal for RCC works excluding cost and (abrication otreinforcement and centerning shuttering charges but including curing and |
10 | Plastering with Cement Mortar 1:3 , 10mm thick in all floors including mixing mortar, working in all heights curing watering with all leads and lifts for good water etc., complete complying with standard specification. |
11 | Plastering with Cement Mortar 1:5 , 12mm thick in all floors including mixing mortar, working in all heights curing watering with all leads and lifts for good water etc., complete complying with standard specification. |
12 | Plastering with Cement Mortar 1:4 , 20mm thick in all floors including mixing mortar, working in all heights curing watering with all leads and lifts for good water etc., complete complying with standard specification. |
13 | Finishing the top of roof with one course of machine pressed tiles of size 20 x 20 x 2cm of approved quality laid in CM 1:3, 12mm thick. With water proofing compound confirming to IS by 2% by weight of cement used & the joint pointed neatly to full depth |
14 | White washing two coatsusing shell lime including cost and conveyance ofall materials to site and all labour charges etc complete |
15 | Supplying and painting the walls with two coats of oil bound distemper over one coat of water based cement primer including cost for distemper, primer, cleaning and scrapping the walls, rendering the wallssmooth with necessary putty, brushes, scaffolding arrangements, labour charges, etc., as per standard specification.(The colour and shade of the distemper shall be got approved by the Executive Engineer before use of work). |
16 | Painting two coats of newly plastered wall surface with ready mixed plastic emulsion paint of first class quality and of approved colour over a priming coat including thorough scrapping, clean removal of dirt, and including necessary plaster of paris putty, wherever required etc., complete complying with standard specification. |
17 | Provision for Compound Wall |
18 | Earth work excavation for foundation in all soils and sub soils to full depth etc., ordinary soil complete |
19 | Cement concrete 1:4:8 (one cement, four sand, and Eight hard broken stone) Using 40mm ISS size Hand Broken granite stone Jelly for Foundation and Flooring including labour charges for mixing concrete watering and laying the concrete |
20 | Supplying and erecting steel centering for plane surfaces in foundation and basement for staircase steps column footings plinth beam grade beam etc., |
21 | Column upto GL |
22 | Coulmn |
23 | Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc,Complete complying with stanard specification.(MS |
24 | Cement Concrete 1:1.5:3 (one cement one and half sand and three machine broken stone) using 20 mm ISS gauge machine broken HBG metal for RCC works excluding cost and (abrication otreinforcement and centerning shuttering charges but including curing and |
25 | Brick work in CM 1:5 mix using country bricks ground moulded of size 22 x 11 x 7cm for the following including curing etc., complete complying with standard specifications |
26 | Plastering with Cement Mortar 1:5 (one cement and five sand ) 12mm thick in all floors including mixing mortar, working in all heights curing watering with all leads and lifts for good water etc., complete complying with standard specification. |
27 | Painting two coats of newly plastered wall surface with ready mixed plastic emulsion paint of first class quality and of approved colour over a priming coat including thorough scrapping, clean removal of dirt, and including necessary plaster of paris putty, wherever required etc., complete complying with standard specification. |
28 | Provision for Name Board |
29 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package} |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy