Dakshinanchal Vidyut Vitran Nigam Limited-DVVNL has published For The Work Of The Task Of Issuing The Applied Combinations On Jhatpat And Nivesh Mitra Portal To Be Completed Immediately In Full Deposite Scheme In The Area Of Edsd Etmadpur And Edsd Khandauli Under The Jurisdiction Of Electricity Distribution Division. Submission Date for this Tender is 06-07-2022. Power Distribution Work Tenders in fatehabad Uttar Pradesh. Bidders can get complete Tender details and download the document.
Sl. No. | Item Description |
1 | Carriage of following from 132 KV Taj Agra to dump site through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance approx 10 - 50 Kms.) |
2 | ST pole 9 /11/13 Mtr. long |
3 | PCC pole 8.5 Mtr. long |
4 | 10/16 KVA T/F |
5 | 25/63/100 KVA T/F |
6 | 11 KV 3x50/3×70 / 3X120/3X185/3x300/ XLPE Cable |
7 | 11 KV OUTGOING VCB |
8 | 11 KVS/s CUBICAL |
9 | Line material viz. Aerial bunch conductor/Weasal conductor/Dog, G.I. earth wire, cross arm, angle, channel, insulators,clamps, stay, earth rod and other line material, if required |
10 | Cutting of kharanja/mettalic road/concrete portion while digging pit for erection of PCC/STP poles and giving the exact shape after exicution work as per direction of supervising engineer. It includes the cost of labour, T & P, carrier etc reauired for proper completion of work. |
11 | Erection of single pole on 8.5 Mtr. LongPcc ncluding fixing ofaccessories for HT/LT line as per RESPO manualand as per direction of Engineer Incharge. |
12 | Erection of single pole on 9/11/13 Mtr. long ST poles, including fixing ofaccessories for HT/LT line as per RESPO manualand as per direction of Engineer Incharge. |
13 | Erection of double pole structure on 9/11/13 Mtr. long ST poles, fixing ofaccessories for construction of double pole type LT S/s |
14 | Erection of double pole on 8.5 Mtr. long PCC poles including fixing ofaccessories for double pole S/s as per RESPO manualand as per direction of Engineer Incharge. |
15 | Installation and Mountingof 25/63/100 KVA TFof double Pole. |
16 | Making HT T-Off connection on existing mains, labour, T&P and carrier etc. required for proper completion of work. |
17 | Erection and grouting of stays in 1:4:8 ratio cement, sand and stone ballst, its tightning, binding, nozelling etc. of stay wire with stay and stap clamp of pole as per site requirement |
18 | Earthing ofpole as per RESPO manual and as per direction of supervising engineer including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work. |
19 | Laying sagging stringing and binding and jumpering etc of following conductors for construction of 11 KV line/LT |
20 | ACSR Weasal conductor/Dog conductor/ Racon |
21 | Areal Bunch Conductor 1x16/3x50/3x95/3x120 |
22 | laying of 11 kv 3x50/3x70/3x120/3x150/ 3x300 Sqmm XLPE cable. |
23 | Providing and fixing of 11 kv Fuel set on double pole |
24 | Recevied back of T/F 16KVA includuing loading unloading and carrigefrom pin poit to Work shop/Taj Store Center (10-50 km) |
25 | provinding and fixing 3x50/3x703x120/3x185/3x30011kv cable boxes |
26 | Fixing of 11 kb pilfer proof metering cubical |
27 | mounting of 3x50/3x70/3x120/3x185/3x300 sqmm 11kv XLPE cable on double pole including jumpering and making Loof both sides andEtc. As per direction for supervising engineer. |
28 | installation of 10/16 kv T/F |
29 | Grouting PCC Pole as per Respo norms |
30 | Grouting ST Poles as per Respo norms |
31 | Fixing of LT Distribution Boxes on already eretected pole for giving supply to consumer by conecting consumer cables by using appropriated alumunium lungs tape and N&B arranged by department |
32 | insatallaion of 11 kv VCB in proper aligment and direction and jointing of earting strips with help of gas welding and making cable connection at above 33 KV S/s |
33 | Mounting/Installation CT/Pt unit |
34 | Guarding of 11 KV line by laying striging sagging and binding of 2 nos parallel GI wire 6SWG after providing fabrication and fixing of guarding angle and fabrication and fixing of X Guards of GI wire at distance of 03 Mts as per site requirement |
35 | Cutting, chopping, triming of tree branches to clear the line route to give2 mtr. horizontal and vertical clearance to the line coming in the route ofdifferent feeders as per direction of supervising engineer |