Rural Development And Panchayats Department has published Tiruvannamalai District Providing Infrastructure Development Works To Agamt 2021-22 Village Panchayts At Palanandal Panchayat Of Thurinjapuram Block In Package No. Tvm / 2021-22 / 93. Submission Date for this Tender is 10-08-2022. Civil Work Tenders in Tiruvannamalai Tamil Nadu. Bidders can get complete Tender details and download the document.
Sr No | CorrigendumDate | Corrignedum | CorrigendumType | NewSubmissionDate |
1 | 13-Jul-2022 | Date | Date | 25-07-2022 |
2 | 23-Jul-2022 | Date Change | Date | 02-08-2022 |
3 | 02-Aug-2022 | Tender Date Postponed | Date | 10-08-2022 |
Sl. No. | Item Description |
1 | Part I Rejuvenation of Namakulam with Construction of Inlet and outlet and bathinh ghat with retaining wall in Mayankulam at Palanandal Panchayat@Thurinjapuram Block |
2 | Provision for Desiliting work |
3 | Clearing light jungles including cost and conveyance of all materials and all labour charges etc., complete |
4 | Earth work deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearan |
5 | Earth work excavation in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 m deploying earth moving machinaries and tippers including benching , breaking clods, sectioning etc. |
6 | Provision for Bathing Ghat |
7 | Earth work excavation depositing on bank with initial lead and lift as per SS 20 B incl cost and conveyance of all charges etc complete |
8 | Sand filling with good river sand including cost and conveyance of all materials to site and all labour charges for filling etc.,complete. |
9 | C.C.1:4:8 using 40mm stone jelly including cost and conveyance of all materials to site and cost of labour and all other incidental charges etc.,complete. |
10 | C.C. 1:3:6mix using 40mm ISS HBG Metal including cost and conveyance of all materials to site and cost of labour charges etc,complete |
11 | Supply and erection of centring incl all necessary supports and strutting all cross bracings etc complete |
12 | Provision for Retaining wall |
13 | Earth work excavation & Depositing on bank with Initial lead of 10m and lift & 2m in hard stiff clay, stiff black cotton hard red earth shales, murram, gravel stoney earth and earth mixed with small size boulder and in hard gravelly soils per SS 20B Including all other incidental charges such as slurring strutting, baling out water forming, protective bunds etc., complete for foundation. |
14 | Supplying and filling Sand in foundation and basement with Excavated earth complete complying to standard specification |
15 | Cement concrete 1:4:8 mix using 40mm I SS size hard granite broken metal from approved quarry including cost and conveyance of all materials to site including cost of cement which will be supplied departmentally at the Departmental section stores and the cost will be recovered at the rates noted in the special conditions appended and conveyance of the same from Departmental section stores to the actual workspot and handling charges at each and including cost of form work mixing concrete laying compacting and watering curing concrete including all leads for good soft, potable water, hire and fuel charges for all tools and plants and all other incidental charges such as baling out water forming protective bunds providing coffer dams etc., complete as directed by the Engineer |
16 | Cement concrete 1:3:6 mix using 40mm I SS size hard granite broken metal from approved quarry including cost and conveyance of all materials to site including cost of cement which will be supplied departmentally at the Departmental section stores and the cost will be recovered at the rates noted in the special conditions appended and conveyance of the same from Departmental section stores to the actual workspot and handling charges at each and including cost of form work mixing concrete laying compacting and watering curing concrete including all leads for good soft, potable water, hire and fuel charges for all tools and plants and all other incidental charges such as baling out water forming protective bunds providing coffer dams etc., complete as directed by the Engineer |
17 | Supplying and erecting centering are strutting including neceassary supports for place surface for RCCcolumns fottings and pedestal beems crtitical pears erc.,using mild steel angles of sizes 90x60x10cmgauge stiffness welded mild steel angles of sizes 25x25x3mm for boarding laying over silver oak joists of single 10cm -6.5cm space of 75cm centre to centre complete complying with standard specificatinon |
18 | Provision for Baby Pond Lining wall |
19 | Earth work excavation and depositing onsides with initial lead of 10 meter and initial lift of 2 meters in sand,silt or other loose soil, wet sand or silt not under water, light black cotton soil sandy loam and ordinary soil including excavated |
20 | Filling withgood river sand including cost and conveyance of all materials and all labours chages etc., complete |
21 | Cement concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance to all materialto site and all labour charges etc., complete |
22 | CC 1:3:6 mix using 40mm ISS HBG metal including cost and conveyance of all materials and all labour chages etc., |
23 | Supplying and erecting centeringshuttering includingnecessary supportsforplane surface infoundationandbasementandinallfloorsforR C Ccolumn footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, criticalpier etc using mild steel sheets of size 90 x 60 cm and 10 guagestiffened, weldedwithmild steel angles ofsize25mmx25mmx3mmforboardinglaidoversilver oak(country wood) scantlings of size 10cm x 6.5cm spacedof about 90cm centretocentreand supported by casurina props of 10cm to 13cm dia spacedat 75cmcentretocentre complete complying with standardspecificationsandasdirectedbydepartmental officers including conveyance of all materials to site and proper centering etc complete. |
24 | Provision for In let |
25 | Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation. |
26 | Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification. |
27 | Cement concrete 1 :4 : 8mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. |
28 | Cement concrete 1 : 3 : 6 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. |
29 | Supplying and erection of centering for retaining wall and bathing ghatincluding cost and conveyance of all material and all labour charges etc, complete |
30 | Providing and laying reinforced cement concrete pipe NP2 for culverts on first class bedding of granularmaterial in single row includingfixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry |
31 | Refilling Earth filling between body wall including cost and conveyance of gravel, labour for filling, watering and compacting etc complete complying with standard specification and as directed by the departmental officer. |
32 | Provision for Name Board |
33 | Part I: Construction of Panchayat Office Building at Kothanthavadi Panchayat |
34 | Earth work excavation for foundation in all soils such as redearth ,hard stiff clay soil, stiff black cotton soil, hard redearth,shales, murrams, gravel,hard rock not requiring blasting ete complete.,For Foundation |
35 | Cement concrete 1:4:8 mix usin 40 mm HBGSmetal inculding cost and coveyance of all materials to site including labour for mixing ,laying,curing etc complete.,For Foundation |
36 | Supplying and filling with filling sand in layers not more than 15 cm thick ,well rammed, wattered and compacted etc,complete For Foundation |
37 | Supplying and Filling the U/S gravel from appd quarryincluding cost and conveyance and filling charges etc., as per std. Specification |
38 | Brick work with cement mortar 1:5 mix using II class bricksfor foundation and basement and superstructure inculding cost and conveyance of all materiales curing etc ,complete. |
39 | Reinforced cement concrete 1:11/2:3 mix using 20 mmHBGSmetal inculding cost and coveyance of allmaterials to site including labour for mixing ,laying,curing etc complete., |
40 | Supplying and fabrication,placing in position of mild steel or ribbed Tor steel grils for RCC works inculding cost of steel and binding wire etc. |
41 | Supplying and erection centering for sides and soffits inculding necessary supports and structingfor plain surfaces such as RCC Slab,Lintel,Beam coloum,sunshade etc complete., |
42 | Supplying and erection centering for sides and soffits inculding necessary supports and structingfor plain surfaces such as RCC Below Basement etc complete., |
43 | Supplying and erection centering for sides and soffits inculding necessary supports and structingfor plain surfaces such as RCC Slab,and ,Beam etc complete., |
44 | Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc completefor 10 cum. |
45 | Weathering course with broken brick jeely for 20 mm size mixed with pure slacked lime (no sand to be used) in proposation of 32:12.5 cft to proper gradient,well beation with wooden beaters etc |
46 | Terrace flooring with one coarce of old &new machine pressed tiles of size 20x20x2 mmusing Cm 1:3 with water proofing compound 2% weight of cement used and the joints pointed with same |
47 | Paving the Floor with Vetrified tiles in CM 1:3 20mm thick inculding cost of white cement and labour charges etc |
48 | Dadoing the walls with new Glazed tiles of size 150 x150 x6 mm laid in CM 1:2 ,10 mm thick and pointig with white cement using 0.40 Kg/m2 including finishing the joint and pointing flush with ties surface |
49 | Plastering with Cement Morter 1:5 mix 12 mm thick inculding cost and conveyanceof all materials to site and labour charges for curing etc |
50 | Plastering with Cement Morter 1:3 mix 10 mm thick inculding cost and conveyanceof all materials to site and labour charges for curing etc |
51 | Fabrication and supply of mild steel Door of anysize with single leaf outer frame made of 35x35x5 mm equal M.S angle and shutter frame made of 25x25x5 mm M.S angle for horizontal and vertical member with stiffener and fully covered with 18 G plate etc complete.Door1.10 x 2.10 m |
52 | upvc Door 1.10x2.10m |
53 | Pvc Toilet door 0.75 X 1.80 m |
54 | Toilet door 1.50 X 2.1 m |
55 | Fabrication and supply of mild steel Windowof anysize with single leaf outer frame made of 35x35x5 mm equal M.S angle and shutter frame made of 25x25x5 mm M.S angle for horizontal and vertical member with stiffener and fully covered with 18 G plate etc complete. |
56 | Towards cost and supply of Rolling shutter of size 1.20X2.10mRolling shutter of size 1.20X2.10m |
57 | Grill Gate of size 1.50X2.10m |
58 | Distembering two coats oil bound distemberover priming coatinculding cost and conveyance of all materials to site and all loboure charges etccomplete ( Innerwall ) |
59 | Painting two coats with approved Plastic Emulsion paint over one coat of Primaring coatover cement plastered wall surface, ceiling and other new surface including cleaning, preparing the surface, curing, scaffolding charges etc., complete complying with standard specifications and as directed by the departmental officers. (S.I No. 359 B) |
60 | Painting two coat of new iron works such as steel Doors,windows,ventilators, etc., with best approvedfirst quality of synthetic enamel paint of approved colour over the existing priming coats,ete. |
61 | Supply and fixing of Water closet with "P" trap, PVC Pipes, Jolly 0.60 x 0.45m, Precast slab for Manhole cover & Lock and keyetc. complete. |
62 | Supplying and fixing in position white / colour glazed European Water Closet of best quality and approved make with 100 mm "P" or "S" trap connecting with CI pipe of 100mm dia / PVC pipe of |
63 | Supplying and fixing in position best quality and approved make Indian made white / colour glazed earthernware wash hand basin of size 550 x 400mm (with pedestal / without pedestal) with a pair |
64 | Supply and fixing of Rain water PVC pipe of 110mm dia |
65 | Wiring with 2 X 1.5 Sq.mm (22 / 0.3) PVC insulated SC unsheathed Copper conducutor cable of 1100V grade in suitable PVC rigid pipe concealed in wall and ceiling with PVC accessories inflush with wallwith3 mm thick Hylum sheet cover withTW boxAnd 5 A FT switch with continuous earth connection of 14 SWG TC wire for making good ofthe concealed portion with suitable colour for PVC concealed Light point / fan point (For electronic Regulator) SD 20 |
66 | Wiring with 2 X 1.5 Sq.mm (22 / 0.3) PVC insulated SC unsheathed Copper conducutorof 1100V grade in suitable PVC rigid pipe concealed in wall and ceiling with PVC accessories inflush with wallwith150 mm X 100 mm X 113 mm TW switch boxwith3 mm thick Hylum sheet cover for 5 A 3 pin non interlocking CS plugwith continuous earth wire connection of 14 SWG TC wire for making good ofthe concealed portion with suitable colour forconcealed PVCplugpointSD 36 |
67 | Supply and run of 2 of 1.50 sq.mm (22/0.30) PVC insulated SC unsheathed copper Conductor of1100 V grade on 7/20GI bearer wire for service connection mains SD 64 |
68 | Supply and run of 2 X 4 sq.mm(56 / 0.30) PVC insulated SC unsheathed copper Conductor of1100 V grade in 25 mm dia GI pipe( Class " B " ) suitably bent at both ends with necessary angle iron upright and end supports for mains. SD 70 |
69 | Supply and fixing of 1200 mm ( 48") AC ceiling fan complete with stepped electronic 300 W regulator with 300 mmdown rod on the existing clamp. SD 110 |
70 | Provision for Name Board |
71 | Part II :-Construction of Thrashing floor at Mayankulam @ Palanandal Panchayat at |
72 | Earth work excavation depositing on bank with initial lead and lift as per SS 20 B incl cost and conveyance of all charges etc complete |
73 | C.C.1:4:8 using 40mm stone jelly including cost and conveyance of all materials to site and cost of labour and all other incidental charges etc.,complete. |
74 | Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc completefor 10 cum. |
75 | Collection & Supply of Well Gravel with 1 Km lead including cost and conveyanceto the site and all labour etc complete. |
76 | Supply and erection of centring incl all necessary supports and strutting all cross bracings etc complete |
77 | Cement Concrete Pavement with C.C.1:2:4 HBG metal from approved quarry to work site including cost and conveyance of all materials and labour charges for mixing, laying compacting, etc., complete include providing pre-moulded expansion joints at 4.5 meter |
78 | Providing bitumenious pad |
79 | Provison for Name Board charges |
80 | Part II :-Construction of Thrashing floor at Kottamedu @ Palanandal Panchayat |
81 | Earth work excavation depositing on bank with initial lead and lift as per SS 20 B incl cost and conveyance of all charges etc complete |
82 | C.C.1:4:8 using 40mm stone jelly including cost and conveyance of all materials to site and cost of labour and all other incidental charges etc.,complete. |
83 | Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc completefor 10 cum. |
84 | Collection & Supply of Well Gravel with 1 Km lead including cost and conveyanceto the site and all labour etc complete. |
85 | Supply and erection of centring incl all necessary supports and strutting all cross bracings etc complete |
86 | Cement Concrete Pavement with C.C.1:2:4 HBG metal from approved quarry to work site including cost and conveyance of all materials and labour charges for mixing, laying compacting, etc., complete include providing pre-moulded expansion joints at 4.5 meter |
87 | Providing bitumenious pad |
88 | Provison for Name Board charges |
89 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package} |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail