Power Transmission Corporation Of Uttaranchal Limited has published Construction Of Pile Founadtion Construction Of Pile Foundation At Tower Location No 48C Of 132 Kv Bazpur-Haldwani Transmission Line. Submission Date for this Tender is 21-07-2022. Transmission Line Tenders in bazpur Uttarakhand. Bidders can get complete Tender details and download the document.
Sl. No. | Item Description |
1 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil. |
2 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal sizederived from natural sources) |
3 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level. 1:4:8 (1 Cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size |
4 | Centering and shuttering including strutting, propping etc. and removal of form for : Columns, Pillars, Piers, Abutments, Posts and Struts |
5 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more. |
6 | Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana / Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge; for the following grades of concrete.Note: Extra cement up to 10% of the minimum specified cement content in design mix shall be payable separately. In case the cement content in design mix is more than 110% of the specified minimum cement content, the contractor shall have discretion to either re-design the mix or bear the cost of extra cement. All works upto plinth level Concrete of M25 grade with minimum cement content of 330 kg /cum |
7 | Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. |
8 | Pumping out water caused by springs, tidal or river seepage, broken water mains or drains and the like. |
9 | Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer - in- charge. |
10 | Boring, providing and installation bored cast-in-situ reinforced cement concrete piles of garde M-25 of specified diameter and length below pile cap, to carry a safe working load not less than specified, excluding the cost of steel reinforcement but including the cost of boring with bentonite solution and temporary casing of appropriate length for setting out and removal of same and the length of the pile to be embedded in the pile cap etc. by Crawler mounted, telescopic boom hydraulic pilling Rig all complete, including removal of excavated earth with all its lifts and leads (length of pile for payment shall be measured up to bottom of pile cap). 1200 mm dia piles |
11 | Fixing of template for stub of tower in proper position, level and alignment including placing of stub including cartage of template from departmental store and taking back to departmental store after completion of work including cost of labour,T&P etc.required for proper comletion of work. ( stub and templatewill besupplied by the department free of cost(NSI). |
12 | Hiring Charges of JCB/Crane for 1 hours. including all T&P, labour as required for proper completion of work. |
13 | Boulder apron laid in wire crates (providing and laying of boulder apron laid in wire crates made with 4 mm dia GI wire conforming to IS 280& IS 4826 in 100mm x 100mm mesh(weaved diagonally) including 10% extra for laps and joints laid with stone boulder weighing not less than 40kg each) PWD SOR 2021-2022 |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy