Rural Development And Panchayats Department has published Coimbatore District Providing 3Nos Of Works In School And Infrastructure Development Category Under Agamt Ii 2021-22- At 24 Veerapandi And Naickenpalayam Panchayat In Periyanaickenpalayam Block Package No 24 / Agamt Ii / 2021-22. Submission Date for this Tender is 30-08-2022. Building Work Tenders in periyanaickenpalayam Tamil Nadu. Bidders can get complete Tender details and download the document.
Sr No | CorrigendumDate | Corrignedum | CorrigendumType | NewSubmissionDate |
1 | 12-Jul-2022 | Coimbatore District AGAMT II 2021 2022 PKG No 24 AGAMT II 2021 22 at pnpalayam block Tender date has been extended 22/7/22 | Date | 22-07-2022 |
2 | 22-Jul-2022 | Corrigendum-Coimbatore district providing 3Nos of works in School and Infrastructure development category under AGAMT II 2021-22- at 24 Veerapandi and Naickenpalayam Panchayat in Periyanaickenpalayam block Package No 24/AGAMT II/2021-22 | Date | 28-07-2022 |
3 | 28-Jul-2022 | Corrigendum3-Coimbatore district providing 3Nos of works in School and Infrastructure development category under AGAMT II 2021-22- at 24 Veerapandi and Naickenpalayam Panchayat in Periyanaickenpalayam block Package No 24/AGAMT II/2021-22 | Date | 03-08-2022 |
4 | 02-Aug-2022 | Coimbatore district providing 3Nos of works in School and Infrastructure development category under AGAMT II 2021-22- at 24 Veerapandi and Naickenpalayam Panchayat in Periyanaickenpalayam block Package No 24/AGAMT II/2021-22 | Date | 10-08-2022 |
5 | 10-Aug-2022 | Coimbatore district providing 3Nos of works in School and Infrastructure development category under AGAMT II 2021-22- at 24 Veerapandi and Naickenpalayam Panchayat in Periyanaickenpalayam block Pkg No 24/AGAMT II/2021-22 | Date | 12-08-2022 |
6 | 12-Aug-2022 | Coimbatore dist providing 3Nos of works in School and Infrastructure development category under AGAMT II 2021-22- at 24 Veerapandi and Naickenpalayam Panchayat in Periyanaickenpalayam block Package No 24/AGAMT II/2021-22 | Date | 17-08-2022 |
7 | 17-Aug-2022 | Coimbatore district providing 3Nos of works in School and Infrastructure development category under AGAMT II 2021-22- at 24 Veerapandi and Naickenpalayam Panchayat in Periyanaickenpalayam blck Package No 24/AGAMT II/2021-22 | Date | 22-08-2022 |
8 | 22-Aug-2022 | Coimbatore district providing 3Nos of works in School and Infrastructure development category under AGAMT II 2021-22- at 24 Veerapandi and Naickenpalayam Panchayat in Periyanaickenpalayam block Package No 24/AGAMT II/ 2021-22 | Date | 23-08-2022 |
9 | 23-Aug-2022 | Coimbatore district providing 3Nos of works in School and Infrastructure development category under AGAMT II 2021-22- at 24 Veerapandi and Naickenpalayam Panchayat in Periyanaickenpalayam block Package No 24/AGAMT II/ 2021-22 | Date | 30-08-2022 |
Sl. No. | Item Description |
1 | Name of Work :1. Construction of Staff Toilet for PU Middle School at 24 Veerapandi H/o 24 Veerapandi Panchayat |
2 | EARTHWORK EXCAVATION for foundation in all soils and sub soils and to full depth as may be directed except in rock requiring blasting but inclusive of shoring, strutting and baling out water wherever necessary and refilling the sides of foundation with excavated earth in layers of not more than 15cm thick, well rammed and consolidated and depositing the surplus earth within the compound in places shown by the departmental officers with initial lead and lift etc.,including levelling the sites complete complying with standard specifications and as directed. |
3 | CEMENT CONCRETE 1:4:8 mix using 40mm gauge hand broken hard granite stone jelly for FOUNDATION including dewatering if found necessary and laid in layers of not more than 15cm thick, well rammed etc., complete complying with standard specification. |
4 | Random rubble masonry in cement mortar 1:5 mix with simultaneous pointing including cost and conveyance pf all materials to site and all labour charges etc completefor10 cum |
5 | Brick Workin CM 1:5 mix using 2nd Class Bricks(9"x41/2"x3") 23x11.5x7.5cm including cost and conveyance of materials and labour chargesetc complete. - 100.00 Cft |
6 | Dadooing of walls with glazed tiles of size 15 cm x15cmx6mm laid in CM 1:2, 10mm thick & pointing with white cement using 0.4kg/cm2 |
7 | scratch proof ceramic tiles of size 305x305x6mmcost and conveyance of all materials to site and all labour charges etc complete |
8 | Supplying and erecting centeringshuttering for sides including all labour charges etc |
9 | Supplying and fabrication of steel including cost and conveyance of steel to site and all labour charges for straightening, cutting to length,bending to shape and tying in position and forming grills for all R.C.C works |
10 | Reinforced cement concrete 1:1.5:3 mix using 20mmISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete |
11 | Plastering with cement mortar 1:5 mix with 12 mm thickincluding all charges |
12 | Plastering with cement mortar 1:3 mix with 10 mm thickincluding all charges |
13 | Distembering two coats with best approved distemberincluding cost and conveyance of all materials to site and all labour charges etc complete |
14 | Painting two coats with Emulsion Paint over the one coat of Priming coatincluding cost and conveyance of all materials to site and all labour charges etc complete |
15 | Supplying and fixing in postion best quality Indian Water Closet (IWC) incl cost & conveyance etc., complete., |
16 | Supply and fixing of wash basin with glass including cost and conveyance etc., complete as per std specification |
17 | Name of Work: 2. Construction of Girls Toilet for PU Middle School at Naickenpalayam H/o Naickenpalayam Panchayat |
18 | Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth, earth mixed with small sized boulders and hard gravelly soil as per SS 20B |
19 | Cement concrete 1:4:8 (One of cement, Four of sand and Eight of hard broken stone) using 40mm size hard broken stone for foundation inclusive of shoring, strutting, bailing out water, ramming, curing etc., complete in all respects as directed by the departmental officers.. |
20 | Random rubble masonry in cement mortar 1:5 mix with simultaneous pointing including cost and conveyance pf all materials to site and all labour charges etc complete |
21 | Refilling in foundation and basement with excavated earth in layers of not more than 15 cm thick well rammed watered and compacted including & conveyance and all labour charges etc., |
22 | Brick work in Cement 1:5 mix using country Bricks of size 23x11.5x7.5cms for the following including mixing mortar and all other labour charges etc. complete. |
23 | Supplying and erecting shttering including necessary support for plane surface in foundation Basement and Roof labs strutting upto 3.29M height for plane surfaces for floors for RCC column footings columns plinth beam and connected with foundations |
24 | Supplying, fabricating and placing in position mild steel or ribbed to steel and all reinforced cement concrete works as per the design given including cost of steel and binding wire in all floors etc. complete. |
25 | RCC 1:1.5:3 using 20mm HBG metal including cost and conveyance of materials and labour charges etc. complete |
26 | Cement concrete 1:2:4 mix ( one cement two sand and four aggregate)using 20mm gauge handbroken granite tone jelly for foundation including dewatering if found necessary and laid in layers of not more than 15 cm thick and compacted, etc., complete comply |
27 | Towards the cost of Steel Doors ,windows,ventilators Steel DoorSize 0.9 X 1.8 |
28 | Steel DoorSize0.75 X 1.80 |
29 | Steel Ventilator Size 0.60X 0.60 |
30 | Towards the Labour charges for fixing of Steel Doors |
31 | Supply and Fixing of Indian water closet including all charges etc.,complete |
32 | Supply and Fixing of European water closet including all charges etc.,complete |
33 | Cuddapah slab and fixing in position of including cost and conveyance to work site and labour charges etc complete complying with standard specification. |
34 | Towards Cost and Supply of 110mm Rainwater Downfall pipe fixing with clampswith allstandard specifications |
35 | Weathering course with broken brick jeely for 20 mm size mixed with pure slacked lime (no sand to be used) in proposation of 32:12.5 cft to proper gradient,well beation with wooden beaters etc |
36 | Terrace flooring with one coarce ofmachine pressed tiles of size 20x20x2 mmusing Cm 1:3 with water proofing compound 2% weight of cement used and the joints pointed with same |
37 | Plastering with CM 1:5 mix 12mm thick including cost and conveyance of all materials to site and labour charges etc. complete. |
38 | Providing granolethic floor finish in cement concrete 1:2:4 mix using 10-12mm |
39 | Paving the floor with scratch proof ceramic tiles of any colour and any size laid in CM 1:2, 20mm thick. And pointing with white cement 0.4 Kg per sqm mixed with colouring pigment to siut the colour of the tiles including finishing the joints neatly compl |
40 | Dadooing of walls with glazed tiles of size 15 cm x15cmx6mm laid inCM 1:2, 10mm thick & pointing with white cement using 0.4kg/cm2-10Sqm |
41 | Distembering two coats over one priming coat with best approved distember |
42 | Painting two coats with Interior Emulsion & Exterior Emulsion using best quality of Emulsion, Brushs, scaffolding charges etc. complete |
43 | Painting two coats over new iron work using synthetic enamel paint including cost and conveyace of all materials to site etc. complete. |
44 | Name of Work: 3. Construction of Cycle shed for Government Higher Secondary School at Naickenpalayam H/o Naickenpalayam Panchayat |
45 | Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth, earth mixed with small sized boulders and hard gravelly soil as per SS 20B |
46 | Cement concrete 1:4:8 (One of cement, Four of sand and Eight of hard broken stone) using 40mm size hard broken stone for foundation inclusive of shoring, strutting, bailing out water, ramming, curing etc., complete in all respects as directed by the departmental officers.. |
47 | Cement concrete 1:2:4 (One of cement, Two of sand and Four of hard broken stone) using 40mm size hard broken stone for foundation inclusive of shoring, strutting, bailing out water, ramming, curing etc., complete in all respects as directed by the departmental officers.. |
48 | Brick work in cement mortar 1:5 mix using country bricks 83/4"x41/4"x23/4" and conveyance of all materials to site and all labour charges etc complete |
49 | Supplying & Fixing in positionof MS Pipe work including cost and conveyace of all materials to site etc. complete. |
50 | Supplying & Fixing in positionof Galvalume sheet including cost and conveyace of all materials to site etc. complete. |
51 | Plastering with cement mortar 1:5 (One of cement and Five of sand) 12mm thick including finishing smooth, scaffolding, setting, curing etc., complete as directed by the departmental officers. |
52 | Exterior Emulsion Two coats over priming coat including cost and conveyance of all materials and labor charges etc complete |
53 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package} |