Engaging An Agency For Revisioning Of High Pressure Valves In Plant 207 (Ohcu) - Emergency Job , Revisioning Of High Pressure Valves , Insitu Servicing And Overhauling Of High Pressure Stop Check Valve During Sd Of Plant 207. ,, ,,,,,,Servicing, Overhauling And Reconditioning Job Of High Pressure Stop Check Valve Of 2500# And 1500# Rating Of M/S Babcock Make And Operation By Gear.Scope Includes Opening And Dismantling Of Valves (Removal Of Valve Wheel, Gear Box, Bonnet, Gate / Globe / Stem) By Removing Studs & Bolts, Thorough Cleaning Of All Parts Of Valves Using Rustolene Or Kerosene, Further Inspection Of Internal Parts In The Presence Of Eic, Repair / Reconditioning Of Valves By Hand Facing, Grinding, Lapping And Blue Matching With All Tools And Tackles, Replacement Of Defective Missing Spares Including Studs, Pressure Seal Gaskets, Gland Packing And Any Other Parts As Per Requirement, Surface Preparation Wherever Required In-Situ / Manual Lapping, Reassembling The Valves, Gland Packing And Refixing Of Gear Box Instruction Of Eic.The Consumables Like Grease, Rustolene, Gland Packing, Cotton Waste Are Included In The Quoted Rate.Trial Run For Full Closing & Opening Without Any Defect, (I.E. Smooth Operation) By Actuator And Manual Both In Presence Of Cpcl Supervisor.Contractor Will Deploy Technically Qualified, Experienced, Skilled Manpower In Sufficient Quantity, To Carry Out The Necessary Jobs In Well Organised Way So That The Job Can Be Completed Within Scheduled Time Of Shutdown.,,,,,,,, , <H> Insitu - Servicing / Overhauling / Reconditioning Of Gate, Globe And Check Valves - Class 1500# & Above,,,,,,,,</> , Insitu - Servicing & Overhauling And Reconditioning Of M/S Babcock Borsig, Size - 10 Inch 2500#, Stop Check Valve - Drawing Attached , Insitu - Servicing & Overhauling And Reconditioning Of M/S Babcock Borsig, Size - 8 Inch 1500#, Stop Check Valve - Drawing Attached , Special Note :,,,,,,,,,, 1) All Necessary Advanced Tools,Shall Be Under The Scope Of The Contractor.,,,,,,,,,, 2) Contractor Has To Report At Site With In A Day Of Intimation Of Shutdown - Mobilisation And Demobilisation, Boarding & Lodging And Transportation Shall Be Under The Scope Of The Contractor.,,,,,,,,,, 3) Contractor Has To Engage Expereinced / Trainned Valve Technician To Carryout The On Round The Clock Basis And Manpower Planning And Job Schedule As Per Eic Shall Be In Contractors Scope. ,,,,,,,,,, 4) The Job Shall Be Done Round-The-Clock Basis.,,,,,,,,,, 5) Completion Period : The Contractual Completion Period For This Work Shall Be 4 Days (1 Day For Mobilization On Intimation + 3 Days For Valve Revisioning Job From The Date Of Handing Over Of Valves). ,,,,,,,,,,