Tamil Nadu Generation And Distribution Corporation Limited-TANGEDCO has published Execution Of Contract Towards Extension Of Supply Works For Effecting Of New Services Of Agriculture And Natural Calamities Works Of Avudayanoor Section / Surandai Subdivision / Tenkasi Division. Submission Date for this Tender is 28-06-2022. Other Agricultural Machinery Tenders in tenkasi Tamil Nadu. Bidders can get complete Tender details and download the document.
Sl. No. | Item Description |
1 | Normal ground- Excavation of Pole pits (1.25m * 0.5m*1.5m) for 7.32m, 7.5m, 8m, 8.23m poles |
2 | Normal ground- Erection of 7.32m, 7.5m, 8m, 8.23m poles |
3 | Rocky ground- Excavation of Pole pits (1.25m * 0.5m*1.5m) for 7.32m, 7.5m, 8m, 8.23m poles |
4 | Rocky ground- Erection of 7.32m, 7.5m, 8m, 8.23m poles |
5 | Normal ground- Excavation of Pole pits (1.25m * 0.6m*1.83m) for 9M & 9.14M poles |
6 | Normal ground- Erection of 9M & 9.14M poles |
7 | Rocky ground- Excavation of Pole pits (1.25m * 0.6m*1.83m) for 9M & 9.14M poles |
8 | Rocky ground- Erection of 9M & 9.14M poles |
9 | Normal ground- Excavation of Pole pits (1.25m * 0.6m*2.19m) for above 9.14M poles & 36" length RS Joists |
10 | Normal ground- Erection ofabove 9.14M poles & 36" length RS Joists |
11 | Rocky ground- Excavation of Pole pits (1.25m * 0.6m*2.19m) for above 9.14M poles & 36" length RS Joists |
12 | Rocky ground- Erection ofabove 9.14M poles & 36" length RS Joists |
13 | Transporting of poles from road side to pole pit - 7.32m, 7.5m, 8m, 8.23m RCC pole |
14 | Transporting of poles from road side to pole pit - 9m, 9.14m RCC/PSC pole |
15 | Transporting of poles from road side to pole pit - RSJ 36" Pole |
16 | Transporting of poles from road side to pole pit - RSJ 42" and above |
17 | Loading and Unloading of poles - 7.32m, 7.5m, 8m, 8.23m RCC pole |
18 | Loading and Unloading of poles - 9m, 9.14m RCC/PSC pole |
19 | Loading and Unloading of poles - RS Joists, tubular & rail pole (above 9.14m) |
20 | Concreting of poles as per Board Standards (2"*2"*5"). The material such as cement, sand, jelly, etc., have to be supplied by the contractor (Cement concrete mix 1:4:8 using 40mm hard broken stone including cost of labour charges.for placing Transporting of sant,jally,from box and water curing for 14 days etc,.) |
21 | Coping of pole (0.6m*0.6m*0.35m) |
22 | Concreting of stay (o.3m * 0.3m * 1.5m) including materials except cement |
23 | Coil earthing per pole & pole earthing |
24 | Normal ground- Excavation of stay pit (1.00m * 0.5m*1.5m) with transporting of materials to site (For stay set) |
25 | Normal ground- Erection of stay set |
26 | Rocky ground- Excavation of stay pit (1.00m * 0.5m*1.5m) with transporting of materials to site (For stay set) |
27 | Rocky ground- Erection of stay set |
28 | Loading charges of cement |
29 | Unloading charges of cement |
30 | Stacking charges |
31 | Fixing of V & Channel cross arm 5.5" including transporting of materials from road side to site |
32 | Fixing of V & Channel cross arm 4.5" including transporting of materials from road side to site |
33 | Fixing of V & Channel cross arm 3.5" including transporting of materials from road side to site |
34 | Fixing of LT 3Phase cross arm including transporting of materials from road side to site |
35 | Fixing of LT 1Phase cross arm including transporting of materials from road side to site |
36 | Fixing of HT LT TI fitting including transporting of materials from road side to site |
37 | Erection of HT Side arm with stud including transporting of materials from road side to site |
38 | Erection of LT Side arm with stud including transporting of materials from road side to site |
39 | Fixing of insulator (per location) including transporting of materials from road side to site |
40 | HT lines - Stringing, Sagging, binding including transporting of materials from road side to site-For 7/2.59 ACSR (1Span/Wire) |
41 | HT lines - Stringing, Sagging, binding including transporting of materials from road side to site-For 7/3.35 ACSR (1Span/Wire) |
42 | HT lines - Stringing, Sagging, binding including transporting of materials from road side to site-For 7/4.09 ACSR (1Span/Wire) |
43 | HT lines - Stringing, Sagging, binding including transporting of materials from road side to site-For Dog Conductor (1Span/Wire) |
44 | For HT line clear works for For 7/2.59 ACSR (1Span/Wire) |
45 | For HT line clear works for For 7/3.35 ACSR (1Span/Wire) |
46 | For HT line clear works for For 7/4.09 ACSR (1Span/Wire) |
47 | For HT line clear works for ForDog conductor (1Span/Wire) |
48 | LT lines - Stringing, Sagging, binding including transporting of materials from road side to site- For 7/2.59 ACSR |
49 | LT lines - Stringing, Sagging, binding including transporting of materials from road side to site- For 7/3.35 ACSR |
50 | LT lines - Stringing, Sagging, binding including transporting of materials from road side to site- For 7/4.09 ACSR |
51 | For LT line clear works for For 7/2.59 ACSR (1Span/Wire) |
52 | For LT line clear works for For 7/3.35 ACSR (1Span/Wire) |
53 | For LT line clear works for For 7/4.09 ACSR (1Span/Wire) |
54 | Guarding per span length- Spilt Neutral Guarding |
55 | Guarding per span length- Flat Guarding (2 wires) |
56 | Guarding per span length- Flat Guarding (4 wires) |
57 | Guarding per span length- Flat Guarding (6 wires) |
58 | Guarding per span length- Cradle Guarding (Fixing of " X" arm Lacing ) |
59 | Guarding per span length- Fixing of one earthing device with stud |
60 | Erection of transformer/dismantling upto 200KVA |
61 | Erection of transformer/dismantling upto 250KVA |
62 | Erection of transformer/dismantling upto 500KVA |
63 | Erection of centre support (Including concrete) |
64 | Erection of feeder cable with open type fuse unit per feeder and for each addl feeder |
65 | Erection of feeder cable with open type fuse unit - for each addl feeder |
66 | Erection of feeder cable -Bus bar arrangement with open type |
67 | Loading & unloading of Distribution transformer below 250KVA |
68 | Loading & unloading of Distribution transformer 250KVA |
69 | Loading & unloading of Distribution transformer 500KVA |
70 | Plinth work for 500KVA DT with construction material |
71 | Tube light erection-1*40W tube light complete set (including transport) |
72 | Tube light erection-For SV lamp and mercury lamp complete set (including transport) |
73 | Tube light erection-For CFL lamp complete set (including transport) |
74 | Manufacturing of clamps 50*8 mm |
75 | Manufacturing of clamps 65*10 mm |
76 | Alteration of clamps |
77 | Corroded pole welding with 4 pieces of charges (incl.Concreting of cement) note:pieces will be supplied by board |
78 | Welding joint for new RSJ pole at workshop per foot run of welding |
79 | Street light switching pont arrangement |
80 | Drilling less than 23mm holes per hole/slatted hole |
81 | Cutting of channel |
82 | Cutting of Flat |
83 | Cutting of Angle |
84 | RSJ pole cutting |
85 | Tubular pole cutting |
86 | Rail pole cutting |
87 | Fabrication of lightning arrestor frame |
88 | LT-Changing of pin point to cut point |
89 | HT-Changing of pin point to cut point |
90 | Erection of service connection materials-1Ph service |
91 | Erection of service connection materials-3Ph service |
92 | Dismantling of deteriorated poles with concrete in damaged condition including grill separation etc., |
93 | Dismantling of poles without concrete in damaged condition including grill separation etc., |
94 | Providing jumpering at cut point |
95 | complete replacement of worn out earth wire per structure |
96 | Labour for manufacturing of open type fuse unit (Materials supplied by board) |
97 | Manufacturing of HG fuse stool incl. materials |
98 | Tree clearence in HT or LT location- For ordy. Tree clearence and Throng bushes & trees 400/head/day |
99 | Tree clearence in HT or LT location- For coconut trees and Palmrah trees 500/head/day |
100 | Painting-Double pole Transformer structure materials (Double coat) |
101 | Painting-Pole (Colour washing with distember) 2 Nos |
102 | Painting-For transformer only (Double coat with paint) |
103 | Numbering of poles without paint (Labour) |
104 | Numbering of poles with paint (Labour) |
105 | Numbering of Distribution Trnasformer (Painting and writing of name board size-1-1/4*1 incl cost of paint and MS sheet |
106 | Writing in seating channel (Paint to be supplied by contractor) |
107 | Painting of RCC Strcucture poles all metal parts, snowcem & aluminium paint to be supplied by contractor |
108 | Painting of RCC Strcucture poles all metal parts, snowcem & aluminium paint to be supplied by board |
109 | Painting of RSJ structure poles & metal parts-aluminium paint to be supplied by contrcator |
110 | Painting of RSJ structure poles & metal parts-aluminium paint to be supplied by board |
111 | Set right of leaning HT pole/LT pole including x arms, TI fittings |
112 | Transformer structure erection-Excavation of structure pole pits ( Nos) |
113 | Transformer structure erection-Erection of structure poles ( Nos) |
114 | Transformer structure erection-Excavation of stay pits(4Nos) |
115 | Transformer structure erection-Erection of stay set (4Nos) |
116 | Transformer structure erection-Concreting of structure poles incl.materials |
117 | Transformer structure erection-Concreting of stays (4Nos) incl.materials |
118 | Transformer structure erection-Base Concreting |
119 | Erection of Structure materials-Top Channel |
120 | Erection of Structure materials-Transformer seating channel and belting angle |
121 | Erection of Structure materials-AB switch (Complete) |
122 | Erection of Structure materials-HG fuse (Complete) |
123 | Erection of Structure materials-Jumpering |
124 | Erection of Structure materials-HT LAS |
125 | Erection of Structure materials-LT LAS |
126 | Earthing system-Excavation of 3 Nos. earth pits |
127 | Earthing system-Excavation of earth wire trenches and paving of earth wire, Erection of 3 Nos. earth pipe and giving earth connection, Earthing of all metal parts, Las etc., including central connection |
128 | Earthing system-Mason works for earth pits and structure pole coping (cementsupplied by Contractor) |
129 | Earthing system-Painting of transformer structure 2 coats (Labour only) |
130 | Earthing system-Painting with Distember paint on poles |
131 | Earthing system-Spreading yard jelly and cut stone and bricks including material |
132 | Earthing system-Writing of name board and target board |
133 | Erection of Tapping structure-Excavation of structure pole pit. |
134 | Erection of Tapping structure-Erection of structure pole. |
135 | Erection of Tapping structure-Excavation of stay pit. |
136 | Erection of Tapping structure-Erection of stay set. |
137 | Erection of Tapping structure-Concreting of pole. |
138 | Erection of Tapping structure-Concreting of stay. |
139 | Erection of Tapping structure-Base Concreting. |
140 | Erection of Structure materials-Top channel |
141 | Erection of Structure materials-AB switch (complete) |
142 | Erection of Structure materials-Assemble, operating pipe fixing etc., fixing of cross bracing |
143 | Earthing system-Excavation of 1 No. earth pits Excavation of earth wire trench and paving of earth wire, Erection of 1 No. earth pipe and giving earth connection, Earthing of all metal parts, for tapping structure. |
144 | Earthing system-Mason works for earth pit (including material) |
145 | Colour coating on poles with iron materials including paint and distember |
146 | Transporting of 42" twin RSJ pole from roadside pole pit |
147 | Fabrication of 42" Twin RSJ pole, Materials supplied by Board. |
148 | Excavation & Erection of Twin 42"2" fabricated RSJ pole |
149 | Concreting of 42" twin RSJ pole |
150 | Singple pole structure erection- 9.0 mtr RCC POLE (square) -Loading & Unloading of poles |
151 | Singple pole structure erection- 9.0 mtr RCC POLE (square) -Excavation of pole pit & pole erection |
152 | Singple pole structure erection- 9.0 mtr RCC POLE (square) -Transporting road side to pole pit |
153 | Singple pole structure erection-Excavation and erection of stay set complete with stay clamps ( with 16mm stay rod with base plate ) |
154 | Fixing of single pole structure materials & structure clamps ( Tapping channel - 1 No., Tr.bed, Erection AB switch - 1 set, Erection HG Fuse set - 1 set ) |
155 | Erection of 16/25 KVA,11KV / 433 Volts 3 phase |
156 | Earthing for 9 mtr RCC structure square pole(3 pits) |
157 | Concreting including materials for 9 mtr RCC square pole-Base concreting 1:4:8 500*650*150mm, Pole concreting1:2:4 500*500*1700& Coping 1:2:4 ( as per actuals ) |
158 | Concreting including materials for stay sets. (cement, jelly and sand) |
159 | Fixing of 11 Kv lighting arrester, metal oxide, 9 KV, 5 KA(HT & LT) |
160 | Erection of LT wiring kit ( Double open type circuit) |
161 | Fixing of caution / Danger Board as per drawing |
162 | Painting of single pole str including iron materials double coat with painting materials |
163 | Fixing of guarding X arm |
164 | Fixing of Tapping channel X arm |
165 | Fixing of LT shackle |
166 | Fixing of 11 KV Strain Disc |
167 | Maintenance of AB switch-Replacement of male and female one number contact and PTinsulator |
168 | Maintenance of AB switch-Cleaning of contacts, lubrication and checking of operating pipe movments |
169 | Maintenance of Distribution Transformer-Cleaning of HT/LT Bushings, Oil level checking , Silical gel replacement, Terminal tightness checking, Cleaning of DT yard, earth pit watering and maintenance of open types etc., |
170 | Maintenance of Distribution Transformer-Providing of "U" jumpering |
171 | Dismantling of other line materials - (Please mention In percentage for respective line material errection works) |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail