Deposit Work 2021 22 Pipe Line Extension Work Of Various Wards In Adoor Municipality Deposit Work 2021 22 Pipe Line Extension Work Of Various Wards In Adoor Municipality, adoor-Kerala

Kerala Water Authority-KWA has published Deposit Work 2021 22 Pipe Line Extension Work Of Various Wards In Adoor Municipality Deposit Work 2021 22 Pipe Line Extension Work Of Various Wards In Adoor Municipality. Submission Date for this Tender is 28-06-2022. Pipe Laying Tenders in adoor Kerala. Bidders can get complete Tender details and download the document.




Tender Notice

32703852
Deposit Work 2021 22 Pipe Line Extension Work Of Various Wards In Adoor Municipality Deposit Work 2021 22 Pipe Line Extension Work Of Various Wards In Adoor Municipality
Open Tender
Indian
Kerala
adoor
28-06-2022

Tender Details

Deposit Work 2021 22 Pipe Line Extension Work Of Various Wards In Adoor Municipality Deposit Work 2021 22 Pipe Line Extension Work Of Various Wards In Adoor Municipality

Key Value

Document Fees
INR 2500 /-
EMD
INR 40950.0 /-
Tender Value
INR 16.36 Lakhs /-

BOQ Items

Name of Work:Deposit work - 2021-22 - Pipe line extension work of various wards in Adoor Municipality.
Sl. No. Item Description
1Ward 1
2Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix)
3Excavating trenches of required width for pipes, cables, etc including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5 m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20 cm in depth, including consolidating each deposited layer by ramming, watering, etc. and disposing of surplus excavated soil as directed, within a lead of 50 m : All kinds of soil (Ref. Item No. 2.10.1 of DSR)
4Fencing one side of trenches, 1.50 m height with two rows of 10 cm plastic caution tape in vertical casuarina pole (girth 15cm to 24cm) fixed at 2 m intervals. (Data Prepared based on PWD SDB - Item No.1009)
5Laying UPVC pipesof class 2 to class 6 andspecials, lowering to the trenches already made, placing in position aligning the pipe line to the lines and levels and jointing the pipes and specials with solvent cement and testing the pipe line with water to the required test pressure(excluding cost of pipes and specials). 90 mm nominal outer dia pipes."
6Supplying,conveying and placing new street fountain as per KWA std pattern ,establishing fresh connections from the main line including charges for earthwork excavation for exposing pipe and placing fountain,cost of saddle piece,20mm blue pipe and specials,good quality 20mm PVC Tap ,labour charge etc complete as per the direction of Departmental Officerss and making good the damaged road surface if it is necessary.
7Interconnection of newly laid PVC pipe with existing AC/PVC pipe including cost of specialscomplete as per direction of Dept.officers.
8Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)
9Supply of uPVC Pipe, IS 4985:2000 , 10kg/cm2, 90mm Dia.
10Supplying and fitting 90mm pvc end cap
11Supplying and providing 90x22.5x45/90 PVC 10 kg bend/adopter/suitable specials
12Ward 4
13Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix)
14Excavating trenches of required width for pipes, cables, etc including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5 m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20 cm in depth, including consolidating each deposited layer by ramming, watering, etc. and disposing of surplus excavated soil as directed, within a lead of 50 m : All kinds of soil (Ref. Item No. 2.10.1 of DSR)
15Fencing one side of trenches, 1.50 m height with two rows of 10 cm plastic caution tape in vertical casuarina pole (girth 15cm to 24cm) fixed at 2 m intervals. (Data Prepared based on PWD SDB - Item No.1009)
16Laying UPVC pipesof class 2 to class 6 andspecials, lowering to the trenches already made, placing in position aligning the pipe line to the lines and levels and jointing the pipes and specials with solvent cement and testing the pipe line with water to the required test pressure(excluding cost of pipes and specials). 90 mm nominal outer dia pipes."
17Interconnection of newly laid PVC pipe with existing AC/PVC pipe including cost of specialscomplete as per direction of Dept.officers.
18Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)
19Supply of uPVC Pipe, IS 4985:2000 , 10kg/cm2, 90mm Dia.
20Supplying and fitting 90mm pvc end cap
21Supplying and providing 90x22.5x45/90 PVC 10 kg bend/adopter/suitable specials
22Ward 5
23Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix)
24Excavating trenches of required width for pipes, cables, etc including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5 m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20 cm in depth, including consolidating each deposited layer by ramming, watering, etc. and disposing of surplus excavated soil as directed, within a lead of 50 m : All kinds of soil (Ref. Item No. 2.10.1 of DSR)
25Fencing one side of trenches, 1.50 m height with two rows of 10 cm plastic caution tape in vertical casuarina pole (girth 15cm to 24cm) fixed at 2 m intervals. (Data Prepared based on PWD SDB - Item No.1009)
26Laying UPVC pipesof class 2 to class 6 andspecials, lowering to the trenches already made, placing in position aligning the pipe line to the lines and levels and jointing the pipes and specials with solvent cement and testing the pipe line with water to the required test pressure(excluding cost of pipes and specials). 90 mm nominal outer dia pipes."
27Interconnection of newly laid PVC pipe with existing AC/PVC pipe including cost of specialscomplete as per direction of Dept.officers.
28Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)
29Supply of uPVC Pipe, IS 4985:2000 , 10kg/cm2, 90mm Dia.
30Supplying and fitting 90mm pvc end cap
31Supplying and providing 90x22.5x45/90 PVC 10 kg bend/adopter/suitable specials
32Ward 6
33Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix)
34Excavating trenches of required width for pipes, cables, etc including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5 m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20 cm in depth, including consolidating each deposited layer by ramming, watering, etc. and disposing of surplus excavated soil as directed, within a lead of 50 m : All kinds of soil (Ref. Item No. 2.10.1 of DSR)
35Fencing one side of trenches, 1.50 m height with two rows of 10 cm plastic caution tape in vertical casuarina pole (girth 15cm to 24cm) fixed at 2 m intervals. (Data Prepared based on PWD SDB - Item No.1009)
36Laying UPVC pipesof class 2 to class 6 andspecials, lowering to the trenches already made, placing in position aligning the pipe line to the lines and levels and jointing the pipes and specials with solvent cement and testing the pipe line with water to the required test pressure(excluding cost of pipes and specials). 90 mm nominal outer dia pipes."
37Supplying,conveying and placing new street fountain as per KWA std pattern ,establishing fresh connections from the main line including charges for earthwork excavation for exposing pipe and placing fountain,cost of saddle piece,20mm blue pipe and specials,good quality 20mm PVC Tap ,labour charge etc complete as per the direction of Departmental Officerss and making good the damaged road surface if it is necessary.
38Interconnection of newly laid PVC pipe with existing AC/PVC pipe including cost of specialscomplete as per direction of Dept.officers.
39Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)
40Supply of uPVC Pipe, IS 4985:2000 , 10kg/cm2, 90mm Dia.
41Supplying and fitting 90mm pvc end cap
42Supplying and providing 90x22.5x45/90 PVC 10 kg bend/adopter/suitable specials
43Ward 7
44Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix)
45Excavating trenches of required width for pipes, cables, etc including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5 m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20 cm in depth, including consolidating each deposited layer by ramming, watering, etc. and disposing of surplus excavated soil as directed, within a lead of 50 m : All kinds of soil (Ref. Item No. 2.10.1 of DSR)
46Fencing one side of trenches, 1.50 m height with two rows of 10 cm plastic caution tape in vertical casuarina pole (girth 15cm to 24cm) fixed at 2 m intervals. (Data Prepared based on PWD SDB - Item No.1009)
47Laying UPVC pipesof class 2 to class 6 andspecials, lowering to the trenches already made, placing in position aligning the pipe line to the lines and levels and jointing the pipes and specials with solvent cement and testing the pipe line with water to the required test pressure(excluding cost of pipes and specials). 90 mm nominal outer dia pipes."
48Interconnection of newly laid PVC pipe with existing AC/PVC pipe including cost of specialscomplete as per direction of Dept.officers.
49Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)
50Supply of uPVC Pipe, IS 4985:2000 , 10kg/cm2, 90mm Dia.
51Supplying and fitting 90mm pvc end cap
52Supplying and providing 90x22.5x45/90 PVC 10 kg bend/adopter/suitable specials
53Ward 8
54Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix)
55Excavating trenches of required width for pipes, cables, etc including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5 m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20 cm in depth, including consolidating each deposited layer by ramming, watering, etc. and disposing of surplus excavated soil as directed, within a lead of 50 m : All kinds of soil (Ref. Item No. 2.10.1 of DSR)
56Laying UPVC pipesof class 2 to class 6 andspecials, lowering to the trenches already made, placing in position aligning the pipe line to the lines and levels and jointing the pipes and specials with solvent cement and testing the pipe line with water to the required test pressure(excluding cost of pipes and specials). 90 mm nominal outer dia pipes."
57Supplying,conveying and placing new street fountain as per KWA std pattern ,establishing fresh connections from the main line including charges for earthwork excavation for exposing pipe and placing fountain,cost of saddle piece,20mm blue pipe and specials,good quality 20mm PVC Tap ,labour charge etc complete as per the direction of Departmental Officerss and making good the damaged road surface if it is necessary.
58Interconnection of newly laid PVC pipe with existing AC/PVC pipe including cost of specialscomplete as per direction of Dept.officers.
59Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)
60Supply of uPVC Pipe, IS 4985:2000 , 10kg/cm2, 90mm Dia.
61Supplying and fitting 90mm pvc end cap
62Supplying and providing 90x22.5x45/90 PVC 10 kg bend/adopter/suitable specials
63Ward 9
64Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix)
65Excavating trenches of required width for pipes, cables, etc including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5 m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20 cm in depth, including consolidating each deposited layer by ramming, watering, etc. and disposing of surplus excavated soil as directed, within a lead of 50 m : All kinds of soil (Ref. Item No. 2.10.1 of DSR)
66Fencing one side of trenches, 1.50 m height with two rows of 10 cm plastic caution tape in vertical casuarina pole (girth 15cm to 24cm) fixed at 2 m intervals. (Data Prepared based on PWD SDB - Item No.1009)
67Laying UPVC pipesof class 2 to class 6 andspecials, lowering to the trenches already made, placing in position aligning the pipe line to the lines and levels and jointing the pipes and specials with solvent cement and testing the pipe line with water to the required test pressure(excluding cost of pipes and specials). 90 mm nominal outer dia pipes."
68Interconnection of newly laid PVC pipe with existing AC/PVC pipe including cost of specialscomplete as per direction of Dept.officers.
69Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)
70Supply of uPVC Pipe, IS 4985:2000 , 10kg/cm2, 90mm Dia.
71Supplying and fitting 90mm pvc end cap
72Supplying and providing 90x22.5x45/90 PVC 10 kg bend/adopter/suitable specials
73Ward 10
74Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix)
75Excavating trenches of required width for pipes, cables, etc including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5 m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20 cm in depth, including consolidating each deposited layer by ramming, watering, etc. and disposing of surplus excavated soil as directed, within a lead of 50 m : All kinds of soil (Ref. Item No. 2.10.1 of DSR)
76Fencing one side of trenches, 1.50 m height with two rows of 10 cm plastic caution tape in vertical casuarina pole (girth 15cm to 24cm) fixed at 2 m intervals. (Data Prepared based on PWD SDB - Item No.1009)
77Laying UPVC pipesof class 2 to class 6 andspecials, lowering to the trenches already made, placing in position aligning the pipe line to the lines and levels and jointing the pipes and specials with solvent cement and testing the pipe line with water to the required test pressure(excluding cost of pipes and specials). 90 mm nominal outer dia pipes."
78Interconnection of newly laid PVC pipe with existing AC/PVC pipe including cost of specialscomplete as per direction of Dept.officers.
79Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)
80Supply of uPVC Pipe, IS 4985:2000 , 10kg/cm2, 90mm Dia.
81Supplying and fitting 90mm pvc end cap
82Supplying and providing 90x22.5x45/90 PVC 10 kg bend/adopter/suitable specials
83Ward 11
84Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix)
85Excavating trenches of required width for pipes, cables, etc including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5 m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20 cm in depth, including consolidating each deposited layer by ramming, watering, etc. and disposing of surplus excavated soil as directed, within a lead of 50 m : All kinds of soil (Ref. Item No. 2.10.1 of DSR)
86Fencing one side of trenches, 1.50 m height with two rows of 10 cm plastic caution tape in vertical casuarina pole (girth 15cm to 24cm) fixed at 2 m intervals. (Data Prepared based on PWD SDB - Item No.1009)
87Laying UPVC pipesof class 2 to class 6 andspecials, lowering to the trenches already made, placing in position aligning the pipe line to the lines and levels and jointing the pipes and specials with solvent cement and testing the pipe line with water to the required test pressure(excluding cost of pipes and specials). 90 mm nominal outer dia pipes."
88Interconnection of newly laid PVC pipe with existing AC/PVC pipe including cost of specialscomplete as per direction of Dept.officers.
89Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)
90Supply of uPVC Pipe, IS 4985:2000 , 10kg/cm2, 90mm Dia.
91Supplying and fitting 90mm pvc end cap
92Supplying and providing 90x22.5x45/90 PVC 10 kg bend/adopter/suitable specials
93Ward 13
94Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix)
95Excavating trenches of required width for pipes, cables, etc including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5 m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20 cm in depth, including consolidating each deposited layer by ramming, watering, etc. and disposing of surplus excavated soil as directed, within a lead of 50 m : All kinds of soil (Ref. Item No. 2.10.1 of DSR)
96Fencing one side of trenches, 1.50 m height with two rows of 10 cm plastic caution tape in vertical casuarina pole (girth 15cm to 24cm) fixed at 2 m intervals. (Data Prepared based on PWD SDB - Item No.1009)
97Laying UPVC pipesof class 2 to class 6 andspecials, lowering to the trenches already made, placing in position aligning the pipe line to the lines and levels and jointing the pipes and specials with solvent cement and testing the pipe line with water to the required test pressure(excluding cost of pipes and specials). 90 mm nominal outer dia pipes."
98Interconnection of newly laid PVC pipe with existing AC/PVC pipe including cost of specialscomplete as per direction of Dept.officers.
99Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)
100Supply of uPVC Pipe, IS 4985:2000 , 10kg/cm2, 90mm Dia.
101Supplying and fitting 90mm pvc end cap
102Supplying and providing 90x22.5x45/90 PVC 10 kg bend/adopter/suitable specials
103Ward 15
104Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix)
105Excavating trenches of required width for pipes, cables, etc including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5 m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20 cm in depth, including consolidating each deposited layer by ramming, watering, etc. and disposing of surplus excavated soil as directed, within a lead of 50 m : All kinds of soil (Ref. Item No. 2.10.1 of DSR)
106Fencing one side of trenches, 1.50 m height with two rows of 10 cm plastic caution tape in vertical casuarina pole (girth 15cm to 24cm) fixed at 2 m intervals. (Data Prepared based on PWD SDB - Item No.1009)
107Laying UPVC pipesof class 2 to class 6 andspecials, lowering to the trenches already made, placing in position aligning the pipe line to the lines and levels and jointing the pipes and specials with solvent cement and testing the pipe line with water to the required test pressure(excluding cost of pipes and specials). 90 mm nominal outer dia pipes."
108Interconnection of newly laid PVC pipe with existing AC/PVC pipe including cost of specialscomplete as per direction of Dept.officers.
109Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)
110Supply of uPVC Pipe, IS 4985:2000 , 10kg/cm2, 90mm Dia.
111Supplying and fitting 90mm pvc end cap
112Supplying and providing 90x22.5x45/90 PVC 10 kg bend/adopter/suitable specials
113Ward 15 SC
114Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix)
115Excavating trenches of required width for pipes, cables, etc including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5 m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20 cm in depth, including consolidating each deposited layer by ramming, watering, etc. and disposing of surplus excavated soil as directed, within a lead of 50 m : All kinds of soil (Ref. Item No. 2.10.1 of DSR)
116Fencing one side of trenches, 1.50 m height with two rows of 10 cm plastic caution tape in vertical casuarina pole (girth 15cm to 24cm) fixed at 2 m intervals. (Data Prepared based on PWD SDB - Item No.1009)
117Laying UPVC pipesof class 2 to class 6 andspecials, lowering to the trenches already made, placing in position aligning the pipe line to the lines and levels and jointing the pipes and specials with solvent cement and testing the pipe line with water to the required test pressure(excluding cost of pipes and specials). 90 mm nominal outer dia pipes."
118Supplying,conveying and placing new street fountain as per KWA std pattern ,establishing fresh connections from the main line including charges for earthwork excavation for exposing pipe and placing fountain,cost of saddle piece,20mm blue pipe and specials,good quality 20mm PVC Tap ,labour charge etc complete as per the direction of Departmental Officerss and making good the damaged road surface if it is necessary.
119Interconnection of newly laid PVC pipe with existing AC/PVC pipe including cost of specialscomplete as per direction of Dept.officers.
120Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)
121Supply of uPVC Pipe, IS 4985:2000 , 10kg/cm2, 90mm Dia.
122Supplying and fitting 90mm pvc end cap
123Supplying and providing 90x22.5x45/90 PVC 10 kg bend/adopter/suitable specials
124Ward 16
125Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix)
126Excavating trenches of required width for pipes, cables, etc including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5 m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20 cm in depth, including consolidating each deposited layer by ramming, watering, etc. and disposing of surplus excavated soil as directed, within a lead of 50 m : All kinds of soil (Ref. Item No. 2.10.1 of DSR)
127Fencing one side of trenches, 1.50 m height with two rows of 10 cm plastic caution tape in vertical casuarina pole (girth 15cm to 24cm) fixed at 2 m intervals. (Data Prepared based on PWD SDB - Item No.1009)
128Laying UPVC pipesof class 2 to class 6 andspecials, lowering to the trenches already made, placing in position aligning the pipe line to the lines and levels and jointing the pipes and specials with solvent cement and testing the pipe line with water to the required test pressure(excluding cost of pipes and specials). 90 mm nominal outer dia pipes."
129Interconnection of newly laid PVC pipe with existing AC/PVC pipe including cost of specialscomplete as per direction of Dept.officers.
130Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)
131Supply of uPVC Pipe, IS 4985:2000 , 10kg/cm2, 90mm Dia.
132Supplying and fitting 90mm pvc end cap
133Supplying and providing 90x22.5x45/90 PVC 10 kg bend/adopter/suitable specials
134Ward 18
135Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix)
136Excavating trenches of required width for pipes, cables, etc including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5 m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20 cm in depth, including consolidating each deposited layer by ramming, watering, etc. and disposing of surplus excavated soil as directed, within a lead of 50 m : All kinds of soil (Ref. Item No. 2.10.1 of DSR)
137Fencing one side of trenches, 1.50 m height with two rows of 10 cm plastic caution tape in vertical casuarina pole (girth 15cm to 24cm) fixed at 2 m intervals. (Data Prepared based on PWD SDB - Item No.1009)
138Laying UPVC pipesof class 2 to class 6 andspecials, lowering to the trenches already made, placing in position aligning the pipe line to the lines and levels and jointing the pipes and specials with solvent cement and testing the pipe line with water to the required test pressure(excluding cost of pipes and specials). 90 mm nominal outer dia pipes."
139Interconnection of newly laid PVC pipe with existing AC/PVC pipe including cost of specialscomplete as per direction of Dept.officers.
140Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)
141Supply of uPVC Pipe, IS 4985:2000 , 10kg/cm2, 90mm Dia.
142Supplying and fitting 90mm pvc end cap
143Supplying and providing 90x22.5x45/90 PVC 10 kg bend/adopter/suitable specials
144Ward 21
145Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix)
146Excavating trenches of required width for pipes, cables, etc including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5 m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20 cm in depth, including consolidating each deposited layer by ramming, watering, etc. and disposing of surplus excavated soil as directed, within a lead of 50 m : All kinds of soil (Ref. Item No. 2.10.1 of DSR)
147Fencing one side of trenches, 1.50 m height with two rows of 10 cm plastic caution tape in vertical casuarina pole (girth 15cm to 24cm) fixed at 2 m intervals. (Data Prepared based on PWD SDB - Item No.1009)
148Laying UPVC pipesof class 2 to class 6 andspecials, lowering to the trenches already made, placing in position aligning the pipe line to the lines and levels and jointing the pipes and specials with solvent cement and testing the pipe line with water to the required test pressure(excluding cost of pipes and specials). 90 mm nominal outer dia pipes."
149Interconnection of newly laid PVC pipe with existing AC/PVC pipe including cost of specialscomplete as per direction of Dept.officers.
150Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)
151Supply of uPVC Pipe, IS 4985:2000 , 10kg/cm2, 90mm Dia.
152Supplying and fitting 90mm pvc end cap
153Supplying and providing 90x22.5x45/90 PVC 10 kg bend/adopter/suitable specials
154Ward 22
155Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix)
156Excavating trenches of required width for pipes, cables, etc including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5 m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20 cm in depth, including consolidating each deposited layer by ramming, watering, etc. and disposing of surplus excavated soil as directed, within a lead of 50 m : All kinds of soil (Ref. Item No. 2.10.1 of DSR)
157Fencing one side of trenches, 1.50 m height with two rows of 10 cm plastic caution tape in vertical casuarina pole (girth 15cm to 24cm) fixed at 2 m intervals. (Data Prepared based on PWD SDB - Item No.1009)
158Laying UPVC pipesof class 2 to class 6 andspecials, lowering to the trenches already made, placing in position aligning the pipe line to the lines and levels and jointing the pipes and specials with solvent cement and testing the pipe line with water to the required test pressure(excluding cost of pipes and specials). 90 mm nominal outer dia pipes."
159Interconnection of newly laid PVC pipe with existing AC/PVC pipe including cost of specialscomplete as per direction of Dept.officers.
160Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)
161Supply of uPVC Pipe, IS 4985:2000 , 10kg/cm2, 90mm Dia.
162Supplying and fitting 90mm pvc end cap
163Supplying and providing 90x22.5x45/90 PVC 10 kg bend/adopter/suitable specials
164Ward 24
165Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix)
166Excavating trenches of required width for pipes, cables, etc including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5 m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20 cm in depth, including consolidating each deposited layer by ramming, watering, etc. and disposing of surplus excavated soil as directed, within a lead of 50 m : All kinds of soil (Ref. Item No. 2.10.1 of DSR)
167Fencing one side of trenches, 1.50 m height with two rows of 10 cm plastic caution tape in vertical casuarina pole (girth 15cm to 24cm) fixed at 2 m intervals. (Data Prepared based on PWD SDB - Item No.1009)
168Laying UPVC pipesof class 2 to class 6 andspecials, lowering to the trenches already made, placing in position aligning the pipe line to the lines and levels and jointing the pipes and specials with solvent cement and testing the pipe line with water to the required test pressure(excluding cost of pipes and specials). 90 mm nominal outer dia pipes."
169Interconnection of newly laid PVC pipe with existing AC/PVC pipe including cost of specialscomplete as per direction of Dept.officers.
170Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)
171Supply of uPVC Pipe, IS 4985:2000 , 10kg/cm2, 90mm Dia.
172Supplying and fitting 90mm pvc end cap
173Supplying and providing 90x22.5x45/90 PVC 10 kg bend/adopter/suitable specials
174Ward 25
175Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix)
176Excavating trenches of required width for pipes, cables, etc including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5 m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20 cm in depth, including consolidating each deposited layer by ramming, watering, etc. and disposing of surplus excavated soil as directed, within a lead of 50 m : All kinds of soil (Ref. Item No. 2.10.1 of DSR)
177Fencing one side of trenches, 1.50 m height with two rows of 10 cm plastic caution tape in vertical casuarina pole (girth 15cm to 24cm) fixed at 2 m intervals. (Data Prepared based on PWD SDB - Item No.1009)
178Laying UPVC pipesof class 2 to class 6 andspecials, lowering to the trenches already made, placing in position aligning the pipe line to the lines and levels and jointing the pipes and specials with solvent cement and testing the pipe line with water to the required test pressure(excluding cost of pipes and specials). 90 mm nominal outer dia pipes."
179Interconnection of newly laid PVC pipe with existing AC/PVC pipe including cost of specialscomplete as per direction of Dept.officers.
180Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)
181Supply of uPVC Pipe, IS 4985:2000 , 10kg/cm2, 90mm Dia.
182Supplying and fitting 90mm pvc end cap
183Supplying and providing 90x22.5x45/90 PVC 10 kg bend/adopter/suitable specials
184Ward 27
185Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix)
186Excavating trenches of required width for pipes, cables, etc including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5 m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20 cm in depth, including consolidating each deposited layer by ramming, watering, etc. and disposing of surplus excavated soil as directed, within a lead of 50 m : All kinds of soil (Ref. Item No. 2.10.1 of DSR)
187Fencing one side of trenches, 1.50 m height with two rows of 10 cm plastic caution tape in vertical casuarina pole (girth 15cm to 24cm) fixed at 2 m intervals. (Data Prepared based on PWD SDB - Item No.1009)
188Laying UPVC pipesof class 2 to class 6 andspecials, lowering to the trenches already made, placing in position aligning the pipe line to the lines and levels and jointing the pipes and specials with solvent cement and testing the pipe line with water to the required test pressure(excluding cost of pipes and specials). 90 mm nominal outer dia pipes."
189Interconnection of newly laid PVC pipe with existing AC/PVC pipe including cost of specialscomplete as per direction of Dept.officers.
190Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)
191Supply of uPVC Pipe, IS 4985:2000 , 10kg/cm2, 90mm Dia.
192Supplying and fitting 90mm pvc end cap
193Supplying and providing 90x22.5x45/90 PVC 10 kg bend/adopter/suitable specials
194Ward 28
195Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix)
196Excavating trenches of required width for pipes, cables, etc including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5 m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20 cm in depth, including consolidating each deposited layer by ramming, watering, etc. and disposing of surplus excavated soil as directed, within a lead of 50 m : All kinds of soil (Ref. Item No. 2.10.1 of DSR)
197Fencing one side of trenches, 1.50 m height with two rows of 10 cm plastic caution tape in vertical casuarina pole (girth 15cm to 24cm) fixed at 2 m intervals. (Data Prepared based on PWD SDB - Item No.1009)
198Laying UPVC pipesof class 2 to class 6 andspecials, lowering to the trenches already made, placing in position aligning the pipe line to the lines and levels and jointing the pipes and specials with solvent cement and testing the pipe line with water to the required test pressure(excluding cost of pipes and specials). 90 mm nominal outer dia pipes."
199Interconnection of newly laid PVC pipe with existing AC/PVC pipe including cost of specialscomplete as per direction of Dept.officers.
200Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)
201Supply of uPVC Pipe, IS 4985:2000 , 10kg/cm2, 90mm Dia.
202Supplying and fitting 90mm pvc end cap
203Supplying and providing 90x22.5x45/90 PVC 10 kg bend/adopter/suitable specials
204Note:- GST @ 18 % of bill amount will be paid additionally
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail