Bharat Coking Coal Limited-BCCL has published Shifting Of 4000Gpm Pump Motor Set Of Main Coal Face Sump 02Timews And Shifting Of 2000Gpm Pump Motor Set Of Lower Side Sump 02Times And Diversion Of Its Pipe Line Towards Upper Side Sump And Shifting Of Pontoon Along With 4000Gpm Pump Motor Set Of J Shif. Submission Date for this Tender is 28-06-2022. Pump Supply Tenders in barora Jharkhand. Bidders can get complete Tender details and download the document.
Sl. No. | Item Description |
1 | Shifting of 4000gpm pump motor set: Dismantling & withdrawal pump motor set from its existing position |
2 | transporting of dismantled pumps along with motor starter & baseplate from their existing position to the upper side of the sump |
3 | installation of the pump motor & baseplate on the wooden sleeper with proper alignment including fitting of coupling belt & greasing packing of the pump |
4 | dismantling transporting & fitting of suction of the pump |
5 | dismantling transporting & fitting of 10"/8" dia MS nipple 8" dia MS bend 8" dia shortpiece in the delivery of the pump |
6 | dismantling transporting & fitting of 8" dia MS pipe in the delivery of the pump 05+04 = 09X20ft |
7 | dismantling transporting & fitting of 8" dia sluice valve & NR valve in the delivery 2setX2times |
8 | dismantling transporting & fitting of 10" dia hose for jointing the delivery of the pump |
9 | priming the pump & put it in operation |
10 | Shifting of 2000gpm pump motor set: Dismantling & withdrawal of 2000gpm pump motor set from its existing position |
11 | transporting of dismantled pumps along with motor starter & baseplate from their existing position to the upper side of the sump |
12 | installation of the pump motor & baseplate on the wooden sleeper with proper alignment including fitting of coupling belt & greasing packing of the pump |
13 | dismantling transporting & fitting of suction of the pump |
14 | dismantling transporting & fitting of 10"/8" dia MS nipple 8" dia MS bend 8" dia shortpiece in the delivery of the pump |
15 | dismantling of 8" dia MS pipes fromexisting delivery of 2000gpm pump towards lower side sump & transporting laying & jointing the pipes towards upper side sump 22+4 = 26nosX20ft |
16 | dismantling transporting & fitting of 8" dia sluice valve & NR valve in the delivery 2setX2times |
17 | dismantling transporting & fitting of 8" dia hose for jointing the delivery of the pump |
18 | priming the pump & put it in operation |
19 | Shifting of pontoon: Dismantling & shifting of 10" dia MS pipes from its existing position to the upper side of the sump 03nosX03times = 09nosX20ft |
20 | dismantling transporting & re-fitting of 8" dia sluice valve & NR valve in the upper side of the sump 02setX03times |
21 | transporting & re-fitting of 10" dia MS pipes after fitting of sluice valve & NR valve 02nosX03times = 06nosX20ft |
22 | shifting of pontoon along with 10" dia hose & cable towards upper side of the sump |
23 | jointing of 10" dia hose with the existing delivery |
24 | Total impact of GST for the purpose of CTC |