Development And Up-Gradation Of The Existing Graveyard Of The Muslim Population At South Ramnagar Under Ward No-35, Amc, agartala-Tripura

Agartala Municipality Corporation has published Development And Up-Gradation Of The Existing Graveyard Of The Muslim Population At South Ramnagar Under Ward No-35, Amc. Submission Date for this Tender is 06-06-2022. Cremetorium Tenders in agartala Tripura. Bidders can get complete Tender details and download the document.




Tender Notice

32343712
Development And Up-Gradation Of The Existing Graveyard Of The Muslim Population At South Ramnagar Under Ward No-35, Amc
Open Tender
Indian
Tripura
agartala
06-06-2022

Tender Details

Development And Up-Gradation Of The Existing Graveyard Of The Muslim Population At South Ramnagar Under Ward No-35, Amc

Key Value

Document Fees
INR 1000 /-
EMD
INR 24163.0 /-
Tender Value
INR 24.16 Lakhs /-

BOQ Items

Name of Work: Development and up-gradation of the existing Graveyard of the Muslim population at South Ramnagar under Ward No-35, AMC.
Sl. No. Item Description
1Supplying bamboo (1st class) 85 mm to 100 mm dia and making shoe with end tappered upto 300 mm from the bottom of the bambooas per drawing and specification.
2Handling and driving bamboo (1st class) 85 mm to 100 mm dia upto the length required by heavy hammeras per drawing andspecification.
3Providing and fitting, fixing bamboo (1st class) 85 mm to 100 mm dia for horizontal, diagonal bracing, strut etc. with nails / spikes and binding wire (GI 2.0 mm) as per drawing and specification.
4Providing and fixing bitumen or tar drum guard posts including two coats of white synthetic enamel paint over a primer coat in the exposed outside surface above Ground level and applying teo coats of coal tar on the outside surface below ground level including bottom before placing the same for a depth of 450 mm below ground level filled with earth as per speciation
5Earth work in rough excavation, banking excavated earth in layers not exceeding 20 cm in depth, breaking clods watering, rolling each layer with ½ tonne roller or woodenor steel rammers, and rolling every 3rd and top-most layer with power roller of minimum 8 tonnes and dressing up inembankments for roads, flood banks, marginal banks and guide banks or filling up ground depressions, lead upto 50m and lift upto 1.5 m : -All kinds of soil
6Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. -All kinds of soil
7Supplying and filling in plinth, under floor, foundations etc. with sand (fine) from local quarry with all lifts including spreading in horizontal layers, watering, grading to required slope, ramming, consolidating and compacting each layer by using plate compactor or by any suitable method complete.
8Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering -All work upto plinth level: -1:3:6 ( 1 Cement: 3 fine sand : 6 graded well burnt brick aggregate 20 mm nominal size)
9Providing and laying cement concrete of specified grade excluding the cost of centering & shuttering all works upto plinth levelt with 1:2:4 (1 cement : 2 fine sand : 4 graded stone aggregate 20 mm nominal size)
10Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centring, shuttering, finishing and reinforcement-all work upto plinth work 1:1½:3 ( 1 Cement: 1½ fine sand : 3 graded stone aggregate 20 mm nominal size)
11Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto floor five level. Thermo-Mechanically Treated bars/ Cold twisted deformed steel bars
12First class brick work in foundation and plinth including cost of all materials as required complete:-In cement mortar 1:4 ( 1 cement : 4 fine sand ).
13Half brick masonry work with first class bricks in foundation and plinth including cost of all materials as required complete:-In cement mortar 1:4 ( 1 cement : 4 fine sand ).
1412 mm cement plaster of mix : In cement mortar 1 : 4 ( 1 cement : 4 fine sand ) including Neat cement punning
1560mm thick factory made c.c interlocking paver block of M-30 Grade Providing and laying 60mm thick factory made cement concretepaver block of M-30 grade made by block making machine with strong vibratory compaction, of approved size, design & shape, laid in required colour and pattern over and including 50mm thick compacted bed of sand, filling the joints with fine sand etc. all complete as per specition and approval/ direction of the Engineer-in-charge.
16Centering shuttering including struttings, propping etc. and removal of form work for: Foundations, footings, bases for columns etc. for mass concrete with timber plank
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail