Reconstruction Of Box Culvert Syphon At Km 3.691 Of Kasrawan Drain., haidergarh-Uttar Pradesh

Department Of Irrigation-DOI has published Reconstruction Of Box Culvert Syphon At Km 3.691 Of Kasrawan Drain.. Submission Date for this Tender is 26-05-2022. Culvert Tenders in haidergarh Uttar Pradesh. Bidders can get complete Tender details and download the document.




Tender Notice

32318988
Reconstruction Of Box Culvert Syphon At Km 3.691 Of Kasrawan Drain.
Open Tender
Indian
Uttar Pradesh
haidergarh
26-05-2022

Tender Details

Reconstruction Of Box Culvert Syphon At Km 3.691 Of Kasrawan Drain.

Key Value

Document Fees
INR 527 /-
EMD
INR 94000.0 /-
Tender Value
Refer document

BOQ Items

Name of Work: RECONSTRUCTION OF BOX CULVERT SYPHON AT KM 3.691 OF KASRAWAN DRAIN.
Sl. No. Item Description
1Dimolishling of old & damaged VRB including Dimolishling of RCC slab brick work of abatment PCC of foundation with its. proper disposal all complete the work as per direction Engineer-in-charge.
2(a). Dimolishling of RCC work Slab
3(b). Dimolishling of brick work
4(c). Breaking brick ballast (25mm to 40mm size) 40mm gauge excluding cost of Bricks
5(d). Dimolishling of C.C. Work 1.4.8 OR LEANER MIX
6(e). Extra for Cutting rienforcement bars in RCC work mannually or mechanical means in RCC or RB work as per direction Engineer-in-charge.
7Earth work in excavation of foundation in all type ofsoil with lead up to 30 M lift up to 1.50 M with back filling i/c cost of all meterial Labour T & P etc. required. For proper completion of work.as per direction Engineer-in-charge.
8Hiring 5 HP Deisel pump for dewatering including suction pipe its cartage POL and operator etc. for all complete work.as per direction Engineer-in-charge.
9P/L Cement Concrete 1:3:6 in Foundation with (1 Cement, 2 Coarse sand & 4 Stone aggregate 20mm to 40mm size) including cost of all meterial Labour, T & P etc. required for proper completion of the work. as per direction Engineer-in-charge.
10Centering and Shuttering for R C C work including rent of shuttering material labour and T & P required for proper completion of work for slab and wall as per direction Engineer-in-charge.
11(a). Providing, streghtening, cutting, bending, bindingand placing of Tor streel reinforcement, includingsupply of all required labour and T&P required forproper completion of work as per direction ofEngineer-in-charge.
12(i) 20 mm dia Steel Bar
13(ii) 16 mm dia Steel Bar
14(iii) 12 mm dia Steel Bar
15(iv) 10 mm dia Steel Bar
16(v) 8 mm dia Steel Bar
17(b). Bending,Binding,cutting and placing in position reinforcement incld cost of binding wire butexcluding cost of steel required for proper completion of work as per direction of Engineer- in-charge.
18P/L R.C.C. with cement coarse sand and 20 mm gauage approved stone aggregate in the proportion of 1:1.5:3 (1 Cement, 1.5 Coarse sand & 3 Stone aggregate 20mm size) in footings of foundations vertical member and slab etc. excluding supply of reinforcement and its fixing and binding the same but including supply of all materials, labour and tools and plants etc. required for proper completion of the works. As per direction of E/I.
19Brick Work in 1:4 cement and c. sand morter with M-150 Bricks including cost of all material, labour and T&P etc. all Complete the work as per direction of Engineer-in-charge.
20Struck pointing with 1:2 Cement and fine sand mortor including supply of material, labour and T&P. etc. all complete the work. As per direction of Engineer-in-charge.
21One primer coat & 2 coat of oil distemper on new work incld all type of material labour and T & P etc as per instrauction of site incharge
22Supply and fixing 100 mm dia P.V.C spoute pipe i/c all required labour, material and T&P to complete the work. Class-B standard make kisan or equvalant
23Providing and Laying 150 mm thick brick ballast 25 to 40 mm gauge as filter i/c cost of material labour, T&P etc. all complete the work.
24(i) Excluding Cost of material
25(ii) With material
26Earth work in correcting section of Canal/Drain i/c all lead and lift manual completion and proper dressing & also including all required labour and T&P all complete the work as per direction of E/I.
27Earth work in excavation or embankment in Road Diversion including all labour, and T&P required for proper completion of the work as per direction of Engineer-in-charge
28Fixing of NP3 Hume Pipe dia 1000mm Excluding cost of all materiaL, including Labour T & P etc.As per direction of Engineer in charge
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail