Urban Local Bodies has published Construction Of Drain At Ward No-6 Construction Of Proposed Drain Starting From Near Ho- Raju Das At Ward No-06 Within Habra Municipality.. Submission Date for this Tender is 18-05-2022. Drainage Tenders in habra West Bengal. Bidders can get complete Tender details and download the document.
Sl. No. | Item Description |
1 | Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75m.asdirected. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete.(a) Depth of excavation not exceeding 1,500 mm. |
2 | Single Brick Flat Soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with local sand. |
3 | ordinary Cement concrete (mix 1:2:4) with graded stone Chips (20 mm nominal size) excluding shuttering In ground floor. |
4 | Brick work with 1st class bricks in cement mortar (1:6)(a) In foundation and plinth |
5 | Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and ranking out joints including throating, nosing and drip course scaffolding / stagingwhere necessary (ground floor) (Excluding cost of chipping over concrete surface).(ii).With (1:4) cement mortar.(a). 20 mm thick plaster , In Ground Floor. |
6 | Neat cement punning average 1.5 mm thick in wall dado, window sills floor, drain etc. |
7 | Artificial stone in floor, dado, staircase etc with cement concrete (1:2:4) with stone chips, ……. High polishing grinding on this item is not permitted with ordinary cement). Using grey cement. (ii) 25 mm. thick. |
8 | Hire and labour charges for shuttering with centering and necessary staging upto 4 m. using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams, columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of groung floor) (f) 25 mm to 30 mm shuttering without staging in foundation. |
9 | Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every intersection, complete as per drawing and direction. (a) For works in foundation and upto roof of ground floor/upto 4 m, (i) Tor steel/Mild Steel, I. SAIL/ TATA/RINL |
10 | Ordinary Cement concrete (mix 1:1.5:3) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement if any, in ground floor as per relevant IS codes. |
11 | Add G.ST @ 12% |
12 | Add 1% welfare cess |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail