Irrigation Department has published Lot-03 Construction Of V.R.B At Km 4.600 Of Tajpur Minor. Submission Date for this Tender is 22-01-2022. Bridge Work Tenders in amroha Uttar Pradesh. Bidders can get complete Tender details and download the document.
Sl. No. | Item Description |
1 | Earth work in excavation of foundation in all type of soil including initial lift up to 1.50 meter and lead up to 30 meter and including back filling watering and ramming of excavated earth into the space between the structure and the sides of foundation trenches and disposal of surplus earth as directed by the Engineer-in-charge up to 30 meter distance from the foundation. |
2 | Supplying and laying cement concrete 1:3:6 (Cement, Coarse Sand, Shingle 20 to 40 mm) in foundation and wing wall etc. including cost of all material labour and T & P etc. |
3 | M-100 brick in 1:4 (Cement, Coarse Sand) including cost of all material, labour and T&P etc. |
4 | Cement concrete 1:1.5:3 (Cement, Coarse Sand,4 to 20 mm) in wearing coat including cost of all material labour and T&P etc. |
5 | Cement concrete1:1.5:3 (Cement, Coarse Sand, Shingle 4 to 20 mm) for R.C.C work in cap and slab including cost of all material labour and T&P etc. |
6 | Providing Steel Reinforcement with cutting, bending and placing in position with cost of steel and all material, labour and T&P etc. |
7 | Centering and Shuttering for RCC work including cost of all material, labour and T&P etc. |
8 | Struck deep cement pointing in 1:2 (Cement, Coarse Sand) Cement mortar over brick work including cost of all material , labour and T&P etc. |
9 | Supplying and Laying bitumen paper for slab bearing in three layers having bitumen coating including cost of all material, labour and T&P etc. |
10 | Making and filling expansion joint with 25mm thick thermocolincluding cost of all material, labour and T&P etc. |
11 | Supplying and Fixing p.v.c. pipe 75 mm. dia including cost of all material, labour and T&P etc. |
12 | Supplying and Fixing wheel guard of stone size 150X150X600 mmincluding cost of all material, labour and T&P etc. |
13 | Earth work in making ramps with borrowed earth including manual compaction & dressing with average lead of 1.00 Km. |
14 | M-100 brick on edge soling i/c making subgrade & filling joints by earth including cost of all material, labour T&P etc. |