Haryana Power Generation Corporation Limited-HPGCL has published Supply Of Ultra Pure Water Purifier Supply Of Ultra Pure Water Purifier , Ultra Pure Water Purifier Technical Specification Of Ultra Pure Water Purification System With Potable Tap Water Feed:- A ) Ro Grade Water / Type 1 Water Should Have Following Spe. Submission Date for this Tender is 17-05-2022. Thinners Tenders in yamunanagar Haryana. Bidders can get complete Tender details and download the document.
Sr No | CorrigendumDate | Corrignedum | CorrigendumType | NewSubmissionDate |
1 | 09-Feb-2022 | EXTENSION | Date | 01-03-2022 |
2 | 03-Mar-2022 | ExtensioN | Date | 29-03-2022 |
3 | 01-Apr-2022 | eXTENSION | Date | 26-04-2022 |
4 | 02-May-2022 | ExtENSION | Date | 17-05-2022 |
Sl. No. | Item Description |
1 | Ultra Pure Water Purifier Technical specification of Ultra Pure Water Purification system with potable tap water feed:- A) RO grade water/type 1 water should have following specifications: 1.Ion rejection:Through high quality thin firm polyamide RO membrane. 2.Bactria and particulate rejection: through dual wavelength UV and 0.2 micron POU fitter. 3.Flow rate: 7 L/h or better without compromising quality. 4.The system should have recirculation pump to maintain the consistent quality of water and re-circulate the water intermittently from reservoir though I & DI. 5.The system should have water quality sensor at the point of dispense. 6.P.E Reservoir with conical bottom to store RO grade water, with minimum capacity of 25 liter or more. The reservoir should have level sensor & vent filter to protect the stored water from atmospheric contamination. 7.The water should be displayed in % age and graphic manner on the main system display. B) Ultra pure/Type- 1 water should have following specification: 1. Flow rate: 1 Ltr./min. or better without compromising quality 2. Resistivity: 18.2 mega Ohm.cm at 25 deg.C 3. TOC: 1-3 ppb or better 4. Bacteria: < 0.1 cfu/ml 5. pH: Effectively Neutral 6. System should have dual wavelength UV lamp (185 nm/245nm). C) The system must be covered with 1 year warranty from the date of installation. D) The original catalogue with clear process flow diagram should be attached and the same should be available on manufacture’s website. E) The system should be UL, ULC & European CE certified with valid documents. F) The user list and latest 10 performance certificate with contact details like e-mail id and phone number for the quality model should be attached with technical bid. |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail