Establishment Of Setting Up Clean Room Facility In Vlsi Lab Establishment Of Setting Up Clean Room Facility In Vlsi Lab , Tender For Establishment Of Setting Up Clean Room Facility In Vlsi Lab ( As Perbill Of Quantity Annexure-Iii ) , Clean Room: Cleanliness Class-1, 000 As Per Federal Standard 209E / Ip2010 Required Air Changes 150-160 Per Hour, Cooling 20-22 Degree, Heat Load-Normal. Complete With -1. Wall Mounted ( Above False Ceiling Inside Or Outside Wall ) Type Insulated Mini Ahu Of Suitable Capacity Fabricated From 1.2 Mm Thick Powder Coated Ms Crca, Consisting Centrifugal Blower Motor Assembly Of Suitable Capacity, Filter Boxes With Minipleat Hepa Filters Of 99.97% Down To 0.3 Micron, Hdp 10 Micron Pre Filters, In Built Air Conditioner Of Suitable Capacity To Get 22-23 Degree Cooling, Supply / Return Gi Ducting, Return Air Risers With Ss Grills, Control Panel, Led Light Fixtures, Etc. , Puff Panel Partition & False Ceiling Features: Beard Sell Make 60 Mm Thick Puff Panels With Insulation Material Sandwiched Between Two Skin Layers Of 0.8 Mm Thick Powder Coated Gi Having 40 Kgs Density. All Flashings Like Top And Bottom Channels, Angles For Partition-To-Partition Joints Should Be Provided To Get Uniform Seams. All Seams Should Be Sealed With Rtv Sealant. To Provide Double Glass View Windows Of 1, 000 Mm X 450 Mm In The Partition. Puff Panels Should Have Conduit Pipe For Concealed Electric Wiring.Wall Panelling: , Puff Panel Partition & False Ceiling Features: Beard Sell Make 60 Mm Thick Puff Panels With Insulation Material Sandwiched Between Two Skin Layers Of 0.8 Mm Thick Powder Coated Gi Having 40 Kgs Density. All Flashings Like Top And Bottom Channels, Angles For Partition-To-Partition Joints Should Be Provided To Get Uniform Seams. All Seams Should Be Sealed With Rtv Sealant. To Provide Double Glass View Windows Of 1, 000 Mm X 450 Mm In The Partition. Puff Panels Should Have Conduit Pipe For Concealed Electric Wiring. False Ceiling , Epoxy Work: Tender Specifications 1. Epoxy Flooring: 2 Mm Thick Self-Leveling Antistatic Epoxy Flooring. A ) Surface Preparation By Grinding The Surface And Then Removing Loose Particles B ) Application Of One Coat Of Primer And Then Laying Of 2 Mm Thick Self Leveling Epoxy Flooring , Epoxy Coving: 50 / 60 Radius Epoxy Coving To Avoid Dust Accumulation Between The Floor And Wall Panels Using Epoxy Hard Material , Pvc Coving :Features Coving Between False Ceiling And Partition Wall And All The Vertical Corners. Pvc Coving With Fixing Extrusions And Corner Blocks. 60 / 65 Radius, Size: 3” , Clean Room Equipments :Features 1. Air Shower: Suitable To Enter 2 Persons At A Time. Moc :1.2 Mm Thick Powder Coated Ms Crca , 2. Double Skin Pass Box: Working Area 600 Mm X 600 Mm X 600 Mm Moc : 1.2 Mm Thicken Powder Coated Ms Crca , 3. Clean Room Garment Cabinet: 2000 Mm X 500 Mm X 2100 Mm. Complete With B / M Assembly, Hepa Filter, Pre Filter, Uv Tube Light Sliding Aluminium Partition, Castors, Etcmoc : 1.2 Mm Thick Powder Coated Ms Crca , Clean Room: Cleanliness Class-10, 000 As Per Federal Standard 209E / Ip2010 Required Air Changes 70-80 Per Hour, Cooling 23-24 Degree, Heat Load-Normal.Complete With – 3. Wall Mounted ( Above False Ceiling Inside Or Outside Wall ) Type Insulated Mini Ahu Of Suitable Capacity Fabricated From 1.2 Mm Thick Powder Coated Ms Crca, Consisting-3-Cemtrifugal Blower Motor Assembly Of Suitable Capacity, Filter Boxes With Minipleat Hepa Filters Of 99.97% Down To 0.3 Micron, Hdp 10 Micron Pre Filters, In Built Air Conditioner Of Suitable Capacity To Get 22-23 Degree Cooling, Supply / Return Gi Ducting, Return Air Risers With Ss Grills, Control Panel, Led Light Fixtures, Etc. , Puff Panel Partition & False Ceiling: Beard Sell Make 60 Mm Thick Puff Panels With Insulation Material Sandwiched Between Two Skin Layers Of 0.8 Mm Thick Powder Coated Gi Having 40 Kgs Density.All Flashings Like Top And Bottom Channels, Angles For Partition-To-Partition Joints Should Be Provided To Get Uniform Seams. All Seams Should Be Sealed With Rtv Sealant.To Provide Double Glass View Windows Of 1, 000 Mm X 450 Mm In The Partition. Puff Panels Should Have Conduit Pipe For Concealed Electric Wiring. Wallpanelling , Puff Panel Partition & False Ceiling: Beard Sell Make 60 Mm Thick Puff Panels With Insulation Material Sandwiched Between Two Skin Layers Of 0.8 Mm Thick Powder Coated Gi Having 40 Kgs Density.All Flashings Like Top And Bottom Channels, Angles For Partition-To-Partition Joints Should Be Provided To Get Uniform Seams. All Seams Should Be Sealed With Rtv Sealant.To Provide Double Glass View Windows Of 1, 000 Mm X 450 Mm In The Partition. Puff Panels Should Have Conduit Pipe For Concealed Electric Wiring. False Ceiling , Epoxy Work: 1. Epoxy Flooring: 2 Mm Thick Self-Leveling Antistatic Epoxy Flooring. A ) Surface Preparation By Grinding The Surface And Then Removing Loose Particles B ) Application Of One Coat Of Primer And Then Laying Of 2 Mm Thick Self Leveling Epoxy Flooring , 2. Epoxy Coving: 50 / 60 Radius Epoxy Coving To Avoid Dust Accumulation Between The Floor And Wall Panels Using Epoxy Hard Material , Pvc Coving: - Coving Between False Ceiling And Partition Wall And All The Vertical Corners. Pvc Coving With Fixing Extrusions And Corner Blocks. 60 / 65 Radius, Size: 3” , Clean Room Equipments: 1. Air Shower: Suitable To Enter 2 Persons At A Time. Moc :1.2 Mm Thick Powder Coated Ms Crca , 2. Double Skin Pass Box: Working Area 600 Mm X 600 Mm X 600 Mm Moc : 1.2 Mm Thicken Powder Coated Ms Crca , 3. Clean Room Garment Cabinet: 2000 Mm X 500 Mm X 2100 Mm Complete With B / M Assembly, Hepa Filter, Pre Filter, Uv Tube Light Sliding Aluminum Partition, Castors, Etc Moc : 1.2 Mm Thick Powder Coated Ms Crca , Amc For 1 Years From The Date Of Completion Warranty Period. , Amc For 2 Years From The Date Of Completion Warranty Period. , Amc For 3 Years From The Date Of Completion Warranty Period.