Agra Municipal Corporation has published Construction Of Culvert And Drain Puliya And Naali In Bhagwati Bagh , Shobha Nagar , Bhagwati College Near, Different Vidha Puram Stations Chatta Sr No 42 Zone-1. Submission Date for this Tender is 13-01-2022. Drainage Tenders in AGRa Uttar Pradesh. Bidders can get complete Tender details and download the document.
Sl. No. | Item Description |
1 | Dismantling Reinforced Cement Concrete or Reinforced brick work including stacking of materials as directed by E/IC with in a distance of 60 meters (200 feet). (17-Chapter PWD. No.694) |
2 | Dismantiling brick work or stone work in lime or cement mortar and including stacking ofmaterials as directed by E/IC with in a distance of 60meters (200 feets). (17-Chapter PWD. No.692) |
3 | Earth work in Excavation in foundation in ordinary soil (loam, clay or sand) including, lift up to 1.50 m and lead up to 30m and including filling watering and ramming of oxcavated the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the engineer-in-charge up to a distance of 30 M form the foundation trenches. (Rate including Royalty of earth also) (4-Chapter S.I.NO.- 251) |
4 | Providing and laying Cement Concrete in 1:5:10 (1 cement :5 fine sand 10 brick ballast 40 mm gauges) and curing complete, including cost of form work in foundation and floors. (5-Chapter PWD.SCH.-274) |
5 | Class-150 Brick Work in 1:4 Cement and Coarse Sand, mortar in foundation and plinth including supply of all materials, laborand tools and plants, etc. Required for proper completion of the work. ( Chapter No. 06 S.I. No. 305) |
6 | 12mm thick cement plaster in single coat of fair side of single of half brick wall forinterior plastering up to floor two level including internal rounded angles chamfers and rounded angles not excluding 80mm in girth and finished even and smooth. No extra for mixing any additive. (c) 1 Cement : 4 Coarse sand. (Chapter No.13 Si.No.582(ii)) |
7 | Providing and laying Cement Concrete in 1:2:4 of not less than strength of M-150 stone grit (20 mm nominal size) approved coarse sand and cement. Curing complete including of cost of form work in foundation and floors.(5-Chapter SI.No.279(a)) |
8 | R.c.c work with cement approved coarse sand and 2cm (3/4) gauge approved stone ballast in the proportion 1:2:4 in R.cc Slab excluding supply of reinforcement and its bending butinculding its fixing and binding the same with 24 bwgi binding wire and including necessary oentering and shuttering etc. And also including supply of all materials labor and tools and plants etc. Required for proper completion of the work. Strength of the concrete shall not be less than M-150.(5-Chapter S.I. No.-284) |
9 | Mild steel or iron in plain work such as reinforced concrete or reinforced brick work (when not included in and an overall rates) brought for proper completion of the work and including supply of steel, its wastage bend hooks and authorized over lapping shall be measured up to floor two level. (b) 10mm to 12mm tor. (Chapter No. 10 S.I. No. 504(B)) |
10 | Providing & laying of G.S.B. with graded material including spreading, dressing watering and ramming etc. All complete. (Non Scheduled) |
11 | Providing and Laying 80mm thick M-30 Rubber Molded Interlocking Tiles with dryjoint field local sand etc. All complete.(Chapter No.20 Si.No.19 New Item (80mm Rubber Molded). |
12 | Providing of NALA BANDHA includingetc. all complete.(None Scheduled) |
13 | Cartage of Malva, Silt, sludge kankar and other disposable organic material etc. all complete with labour T&P including cartage of 8 km. (NS) |
14 | Supply & Fixing Granite Stone Work Display Board (Size 2.50ft x 4.00ft) including Painting, Lettering etc. all complete. (None Schedule) |
15 | Sub Total (A) |
16 | Deduction Cost of Material Old workable bricks etc. all complete. |
17 | Diduction of cost brick/bats. (Chapter No.1 Sr.No.2(c)) |
18 | Sub Total (A) |
19 | Sub Total (A-B) |
20 | Add 12% G.S.T. |
21 | Sub Total |
22 | Add/Deduction Rs. For Estimate Figure Amount Match |
23 | Grand Total |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail