55. White Wash Work , Boundary Wall Work , Foothpath Work Old Avadh Puri Park Sr No 87 Zone-1 55., agra-Uttar Pradesh

Agra Municipal Corporation has published 55. White Wash Work , Boundary Wall Work , Foothpath Work Old Avadh Puri Park Sr No 87 Zone-1 55.. Submission Date for this Tender is 13-01-2022. Footpath Work Tenders in agra Uttar Pradesh. Bidders can get complete Tender details and download the document.




Tender Notice

30631459
55. White Wash Work , Boundary Wall Work , Foothpath Work Old Avadh Puri Park Sr No 87 Zone-1 55.
Open Tender
Indian
Uttar Pradesh
agra
13-01-2022

Tender Details

55. White Wash Work , Boundary Wall Work , Foothpath Work Old Avadh Puri Park Sr No 87 Zone-1 55.

Key Value

Document Fees
INR 500 /-
EMD
INR 95110.0 /-
Tender Value
Refer document

BOQ Items

Name of Work:
Sl. No. Item Description
1Dismantling brick work or stone work in lime or Cement mortar and including stacking of material as directed by E/IC with in a distance of 60 meters (200 feet) but Mud Mortar.
2Dismantling of old interlocking tiles pavement including stacking of serviceable material and disposal of unserviceable material within lead of 50m as per direction of engineer in charge.
3Cartage of silt, sludge kankar and other disposable organic material etc. all complete with labor T&P including cartage of 8 km.
4M-150 Brick work in 1:4 with Cement and coarse sand including supply of all material, labor T & P etc. required for proper completion of work.
512MM Thick cement plaster in single coat of fair side of single of half brick wall for interior plastering up to floor two level including internal rounded angles chamfers and rounded angles not including 80mm in girth and finished even and smooth. No extra for missing any additive. 1 cement : 4 Coarse Sand.
6Finishing walls with exterior emulsion paint (Apex) of approved brand and manufactured and of required shade and undecorated wall surface to give even shade over @ 1.25 Ltr/10sqm including one coat of primer applied @ 0.75Ltr./10sqm coat curing and cost of all material, labour, T&P etc. required for proper completion of work for two coat.
7Supply & fixing 1.5 HP submersible pump of I.S.I marked all complete.
8P/L GSB with graded stone ballast with moram with stone grit size, stone ballast with hand ramming watering including all material labor T&P etc. all complete.
9Providing & laying 60 mm thick M-30 C.C. rubber molded interlocking tiles gray colour laid over 4 cm. thick local sand including supply of all material, labor, T&P etc. required for proper completion of work.
10Mild Steel and Iron work of small size and section such as holding down woods, hold fasts tierods, grating etc. (When not included in and over all rates) brought to required form including supply of steel and its wastage including cost of bolts, nuts if required for proper completion of work including fabrication of grill/stairs case railing.
11Providing and laying cement concrete in 1:2:4 (1 cement : 2 coarse sand : 4 graded stone) aggregate (20 mm nominal size) and cutting complete including cost of form work. In foundation and floors.
12Painting two coat other primer on steel with sianth paint including etc all complete.
13E/W filling in or in embankment in ordinary soil excavation to be in the form of a regular pits not exceeding 0.50m in depth and earth work in embankment to be in 20cm layers including ramming and dressing the surface to required levels and slopes and also including 1.5m lift and 30 m lead. The earth in form of cutting (b) to be used as spoil banks within 50m distance as directed by the engineer-in-charge including royalty 9.00 cum. Including Cartage of earth up to 8 km lead.
14Supply and fixing of Precast Reinforced R.C.C. benches (PFRC) ornamental benches with 02 year warranty etc. all complete.
15Supply and fixing of black granite stone board and approved standard matter with brick work, plaster & paint etc. all complete.
16Sub Total (A)
17Deduction Cost of old brick
18Deduction Cost of old brick bats
19Sub Total (B)
20Sub Total (A-B) = (C)
21Add 12% G.S.T. of Sub Total (C) = (D)
22Sub Total (C+D)
23Add / Deduction For Estimate Figure Amount Match
24Grand Total
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail