Rashtriya Chemicals And Fertilizers Limited-RCF has published Briquette Fired Boiler Briquette Fired Boiler , Items As Per Following Specifications , Main Steam Boiler Package Along With Auxiliary Equipment Including All Electromechanical And Instrumentation Items , Pollution Control Equipment , Fuel And Ash Han. Submission Date for this Tender is 01-04-2022. Miscellaneous Fasteners Tenders in Maharashtra. Bidders can get complete Tender details and download the document.
Sr No | CorrigendumDate | Corrignedum | CorrigendumType | NewSubmissionDate |
1 | 25-Jan-2022 | Due date extended upto 15.02.2022 | Date | 15-02-2022 |
2 | 14-Feb-2022 | Due date extended upto 03.03.2022 | Date | 03-03-2022 |
3 | 28-Feb-2022 | Corrigendum for Pre bid queries | Technical Bid | 03-03-2022 |
4 | 02-Mar-2022 | Due date extended upto 15.03.2022 | Date | 15-03-2022 |
5 | 14-Mar-2022 | Due date extended upto 28.03.2022 | Date | 28-03-2022 |
6 | 28-Mar-2022 | Due date extended upto 01.04.2022 | Date | 01-04-2022 |
Sl. No. | Item Description |
1 | ITEMS AS PER FOLLOWING SPECIFICATIONS |
2 | Main Steam Boiler Package along with auxiliary equipment including all electromechanical and Instrumentation items |
3 | Pollution control equipment |
4 | Fuel and Ash handling system |
5 | Other balance of plant items like all ducting, steam and feed water piping, Insulation, structural support, Chimney etc. |
6 | Essential spares as perPart II Technical Spares Philosophy |
7 | Total services other than civil required for handing over complete plant for completion, commissioining & GTR including IBR approval |
8 | Erection and All Risk (EAR) Insurance |
9 | Public Liability Insurance |
10 | Steam Cost for First year : Steam cost for supply of minimum quantity take off i.e. 10 TPH or 7200 MT per month: Variable Cost (Briquette Based) |
11 | Steam Cost for First year : Steam Cost for additional steam supply above minimum steam take off quantityi.e. 10 TPH or 7200 MT per month: Variable Cost (Briquette Based) |
12 | Steam Cost for First year : Steam cost for supply of minimum quantity take off i.e. 10 TPH or 7200 MT per month: O & M Cost |
13 | Steam Cost for First year : Steam Cost for additional steam supply above minimum steam take off quantity i.e. 10 TPH or 7200 MT per month: O & M Cost |
14 | Steam Cost for Second year : Steam cost for supply of minimum quantity take off i.e. 10 TPH or 7200 MT per month: Variable Cost (Briquette Based) |
15 | Steam Cost for Second year : Steam Cost for additional steam supply above minimum steam take off quantity i.e. 10 TPH or 7200 MT per month: Variable Cost (Briquette Based) |
16 | Steam Cost for Second year : Steam cost for supply of minimum quantity take off i.e. 10 TPH or 7200 MT per month: O & M Cost |
17 | Steam Cost for Second year : Steam Cost for additional steam supply above minimum steam take off quantity i.e. 10 TPH or 7200 MT per month: O & M Cost |