Maharashtra Natural Gas Ltd-MNGL has published Arc For Supply, Installation And Commissioning Of Lng Dispensers. Arc For Supply, Installation And Commissioning Of Lng Dispensers. , Lng Dispensers For Lng Filling Station:Design, Detail Engineering, Manufacturing, Assembly, Factory Testing, Supply Of L. Submission Date for this Tender is 24-01-2022. Gas Bottling Plant Tenders in Nashik and Pune Maharashtra. Bidders can get complete Tender details and download the document.
Sr No | CorrigendumDate | Corrignedum | CorrigendumType | NewSubmissionDate |
1 | 27-Dec-2021 | Date Extension | Date | 04-01-2022 |
2 | 04-Jan-2022 | Date | Date | 10-01-2022 |
3 | 10-Jan-2022 | Date_Extension | Date | 17-01-2022 |
4 | 12-Jan-2022 | Reply to Bidder Queries | Other | 17-01-2022 |
5 | 17-Jan-2022 | Date__Extension | Date | 24-01-2022 |
Sl. No. | Item Description |
1 | LNG DISPENSERS FOR LNG FILLING STATION: Design, detail engineering, manufacturing, assembly, factory testing, supply of LNG dispenser including packaging, insurance, handling,transportationofDispenser,loadingandunloadingat MNGLsites/Stores,re-transportationoftheDispenser package from the store to the actual site/station including transit insurance, documentationetc.andprovidingallrelatedservicesincluding installation,integration,siteacceptancetesting,trialrunand commissioning,Maintenance(AMC),commissioningspares,all drawings, documents and licensed software & hardware, converters, cables etc. conforming to MR Specification No. MNGL/LNG/DISPENSER/2021/01,TechnicalSpecificationforLNG Dispenser: TS No. MNGL/LNG/DISPENSER/TS/01 and AMC Doc. No. MNGL/LNG/DISPENSER/AMC/01 enclosed with tender |
2 | SUPPLY OF DISPENSERS: LNG DISPENSERS |
3 | SITE ACTIVITY |
4 | On site Training of 6-10 Purchaser"s Personnel for Max. of 3(three) days for LNG Dispensers |
5 | Erection, testing, commissioning & calibration, Performance test of each dispenser as defined in the tender(Including packing fowrading and Freight Charges) |
6 | Lump-sum Annual Maintenance charges of each Dispenser during warranty period inclusive of supply of all Consumable & Manpower and all spares covered under warranty as defined in the tender in the AMC spec. Doc. No. MNGL/LNG/DISPENSER/AMC/01 |
7 | Lump-sumMaintenancechargesofeachDispenserforSecond year i.e. after first year of warranty period inclusive of supply of all Consumable,all Spares & Manpower as definedin the tender in the AMC spec. Doc. No. MNGL/LNG/DISPENSER/AMC/01 |
8 | Lump-sum Maintenance charges of each Dispenser for Third year i.e.afterfirstyearofwarrantyperiodandsecondyearofARC inclusive of supply of all Consumable, all Spares & Manpower as definedinthetenderintheAMCspec.Doc.No. MNGL/LNG/DISPENSER/AMC/01 |
9 | Lump-sum Maintenance charges of each Dispenser for Fourth year i.e.afterfirstyearofwarrantyperiodandthirdyearofARC inclusive of supply of all Consumable, all Spares & Manpower as definedinthetenderintheAMCspec.Doc.No. MNGL/LNG/DISPENSER/AMC/01 |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail