Purvanchal Vidyut Vitaran Nigam Limited has published Work Of The Increasing Capacity Transformer And Installation Of Additional T / F At Edd I Bhadohi Under B.P-2021-22. Submission Date for this Tender is 27-12-2021. Transformer Supply Tenders in Varanasi Uttar Pradesh. Bidders can get complete Tender details and download the document.
Sr No | CorrigendumDate | Corrignedum | CorrigendumType | NewSubmissionDate |
1 | 13-Dec-2021 | DATE EXT | Date | 20-12-2021 |
2 | 20-Dec-2021 | EXT DATE 1 | Date | 27-12-2021 |
Sl. No. | Item Description |
1 | fctul Iyku o"kZ 2021&22 esa tuin Hknksgh dss fo|qr forj.k [k.M iz0 Hknksgh ds vUrxZr vfrHkkfjr ifjorZdksa ds {kerk o`f) ,oa vfrfjDr ifjorZd dh Lfkkiuk gsrq fo|qr Hk.Mkj dsUnz ls LoLFk ifjorZdksa ,oa lEcfU/kr vU; vko";d lkexzh;ksa dks lkbZV rd lqjf{kr |
2 | increasing of 25 kva to 63 kva |
3 | increasing of 63 kva to 100 kva |
4 | 100 KVA addititinal Transformer stablished |
5 | 250 kva additional transformer stablished |
6 | 11 KV PP Metering Cubical |
7 | 11 KV O/D, D/P CT/PT Double Metering unit |
8 | 25 KVA Transformer |
9 | 100 KVA Transformer |
10 | Erection of Single PCC Pole with all fitting and Pole Grouting |
11 | Erection of Single ST Pole with all fitting and Pole Grouting |
12 | Erection of Double PCC Pole with all fitting andPole Grouting |
13 | Erection of Double ST Pole with all fitting and Pole Grouting |
14 | Earthing of Pole |
15 | Spreading of Conductor, Mounting on Insulator Tightening with sagging and binding on each pole HT Line 3 phase 3 wire |
16 | Mounting of 11/0.4 KVA Transformer with all fitting require in LT Substation complete work 25 KVA Transformer on Double Pole |
17 | Mounting of 11/0.4 KVA Transformer with all fitting require in LT Substation complete work 100 KVA Transformer on Double Pole |
18 | Stay Erection Grouting nozzling and Tightening work |
19 | Fitting of T-OFF Channel Size 125x65x1300 mm with Pole |
20 | 11 KV Cabel Jointing |
21 | Erection of 11 KV PP Metering Cubical |
22 | Mounting of 11 KV O/D, D/P CT/PT Double Metering unit complete work |
23 | Replacementby 3 km Raccon Cond after Dismentling of JarJar ACSR Weasal Cond and Cartage of Scrap from Site to Store Bhadohi |
24 | Dismentling of 0.140 Line km of Dog and Cartage of Scrap from Site to Store Bhadohi |