Archaeological Survey Of India -ASI has published For The Work Under Sr To Construction Of Collapsed Dwarf Wall And Repairing Of Damaged Pathway At Raja Karan Ka Tila, Kurukshetra For The Work Under Sr To Construction Of Collapsed Dwarf Wall And Repairing Of Damaged Pathway At Raja Karan Ka Tila, Kur. Submission Date for this Tender is 09-12-2021. Footpath Work Tenders in KURUKSHETRA Haryana. Bidders can get complete Tender details and download the document.
Sl. No. | Item Description |
1 | Description and specification of items of work to be executed (complete work) |
2 | Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material at approved municipal dumping ground. |
3 | Provision forDismantling of existing damaged tile brick floor with tools and chisels for sorting the serviceable material anddisposal of unserviceable material at approved municipal dumping ground |
4 | Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth away from site. |
5 | Reinforced cement concrete work in columns , including cost of centring, shuttering in 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mm nominal size) |
6 | Steel reinforcement having 12mm vertical bars placing 15cm c/c and 8mm bars ring placing 10cm interval including base reinforcement size 500x500MM having MS bars 10MM dia placing 10cm c/c for R.C.C. work including straightening, cutting, bending, placing in position and binding as per actual requirement for RCC columns as detailed in item no. 4 above all complete. |
7 | Provision for laying cement concrete in foundation of wall, Pathway & copingin the ratio of 1:3:6 (1 cement, 3 c.sand, 6 graded stone agg. 20mm nominal size) with proper camber ,compacting complete |
8 | Provision for 1st class brick work for foundation in the mortar ratio 1:6 (1 cement, 6 fine sand) . |
9 | Provision for Providing first class tile brick masonry ofboundary wall in the ratio 1:4 (1 cement , 4 fine sand ) etc. complete |
10 | Provision for laying brick tile on edge for pathway in composite mortar 1:4 (1 cement, 4 fine sand) over bed of 12 mm thick mortar including filling of joints up to 10 cm |
11 | Provision forRemoval and re-fixing of existingM.S grill panel 1.80m length1.35m height having M.S angle iron frame size (50x50x6)mm with 16mm sq bars 10cm c/c. |
12 | Providing and fixing M.S grill panel 1.80m length1.35m height having M.S angle iron frame size (50x50x6)mm with 16mm sq bars 10cm c/c. |
13 | Providing and fixing M.S gate panel 1m lengthand 2.20m height having M.S angle iron frame size (50x50x6)mm with 16mm sq bars 10cm c/c. |
14 | Provision repair of existing damaged M.S grill panel 1.80m lengthand 1.35m height having M.S angle iron frame size (50x50x6)mm with 16mm sq bars 10cm c/c. |
15 | Provision for Applying Paint with primer on MS Grill two or more coat to an even shade of approved brand |
16 | Provision for pointing tile brick masonry of pathway and boundary wall in mortar ratio 1:3 (1 cement, 3 fine sand) mixed with colour to match the existing wall after raking of joints cleaning washing complete. |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail