Indian Oil Corporation Limited-IOCL has published Replacement / Up-Gradation Of Rim Seal Fire Protection System At 15 Tanks ( Pt 01 To Pt-15 ) At Phbpl Paradip Replacement / Up-Gradation Of Rim Seal Fire Protection System At 15 Tanks ( Pt 01 To Pt-15 ) At Phbpl Paradip. Submission Date for this Tender is 22-12-2021. Fire Protection System Tenders in PHBPL Paradip Odisha. Bidders can get complete Tender details and download the document.
Sr No | CorrigendumDate | Corrignedum | CorrigendumType | NewSubmissionDate |
1 | 16-Nov-2021 | Prebid meeting | Technical Bid | 08-12-2021 |
2 | 29-Nov-2021 | Clarification to pre-bid queries | BOQ | 08-12-2021 |
3 | 06-Dec-2021 | Extension of bid submission period | Date | 15-12-2021 |
4 | 06-Dec-2021 | Technical Bid | Technical Bid | 15-12-2021 |
5 | 16-Dec-2021 | Tender submission date extension | Date | 22-12-2021 |
Sl. No. | Item Description |
1 | RIM SEAL FIRE PROTECTION WORKS |
2 | RIM SEAL FIRE PROTECTION WORKS FOR 15 Nos. OF 60000 KL DDFR TANKS AT PARADIP:(Tank no. PT-1 to PT-15) as per technical specifications & SCC consisting of 1. Design, furnishing of drawings with complete bill of material for the scheme by carrying out site visit, supply of all materials including specified spares at site for Automatic Detection cum AFFF (foam ) basedExtinguishing system complete for 15 nos. of crude oil storage tanks (double deck floating roof tanksof diameter 79.0 meters) at Paradip. Dismantling of the existing detection system including ADW units, JBs, cablings, trays, panels, HMIs , water filling arrangementetc in totality and defective modules, piping & nozzles if any as per requirement and submitting to owner in good condition at specified location. 2. Design engineering, supply, Installation & Integrating the new detection system (fire/heat sensing LHS cables/tubes made of SS316) with existing AFFF based extinguishing system consisting of Foam modules (SS-316L) of capacity 250 L having level detection device for AFFF solution fitted with structural stand, inert gas actuator, safety valve, etc. control arrangements/system piping, fittings, support structures, associated cabling,replacement of extinguishing system components as per requirement (detailed at SOR item no. 3) etc. 3. Design, Supply, Installation and Commissioning of main fire alarm control panel (main panel in Control room & repeater in fire station), graphic display panel, client PC, operating system, HMI software & diagnostic software, providing potential free contacts for alarms and status as per specifications for individual tanks to Owners PLC system, providing serial interface to Owner"s PLC system, and supply & installation of instrumentation items such as pressure switches, pressure gauges etc. control panel/junction boxes having multiple output facility to furnish healthy and fire status of individual tanks to suitable location outside tank dyke by providing suitable signal, power cabling etc., and all other associated items required for the scheme. 4. Complete erection, installation, testing (by simulation and actuation of the system for each tank, temporary power supply to be provided by the contractor), commissioning, trial run including replenishment of AFFF (to be provided by owner at SAT) during testing and carrying out all works as per the tender and as per the specifications/approved scheme/drawing etc. 5. Carrying out painting of all modules/structural with zinc phosphate primer to 50 micron followed by two coats of high build epoxy finish paint of 65 microns each to brand and shade as specified by Engineer-in -charge, including providing all inputs including laptop and necessary software for configuration of detection device and downloading of status, labour, tools and tackles etc. and handing over the system in satisfactory operating condition. |
3 | SUPPLY OF MATERIALS OF FOAM SUPPRESSION SYSTEM AS PER TENDER SPECIFICATIONS |
4 | Foam Modules, 250 litres Volumetric capacity, 200 litres Foam solution with suitable Stanchion & Canopy - SS316 |
5 | SS Foam Discharge piping of 1" size . Length of Each pipe shall be 40m. |
6 | Foam Discharge Nozzles |
7 | Manual Isolation ball valve (1" NB) |
8 | AMC FOR 3 YEARS AND M&I WORKS |
9 | AMC for 1st Year |
10 | AMC for 2nd Year |
11 | AMC for 3rd Year |
12 | De-commissioning, dismantling, carrying and storing the dismantled items to owner"s store & re-installation & commissioning of the complete rim seal fire protection system to facilitate the crude oil tank M&I (Rate to be per tank) |