Urban Development Department-UDD has published Construction Of Boundary Wall And Pcc Road At Muslimkabristhanghato Bagichain Ward 07Under Gumlanagar Parishad. Submission Date for this Tender is 03-11-2021. Road Work Tenders in Gumla Jharkhand. Bidders can get complete Tender details and download the document.
Sl. No. | Item Description |
1 | Constructionof boundry wall and pcc road at muslimkabristhanghato bagichain ward 07under GumlaNagar Parishad |
2 | dismantling pucca brick or lime work including stacking serviceable materials in countable stacks within 15M. Leads and disposal of unserviceable materials-do -doall complete job. |
3 | Earthworkinexvactionin foundationin ordinary soilANDEARTHWORK IN HARDSOIL( videclassificationof soil item A)and disposalof excavated earth asobtainedto a distanceupto50 M --as per directionof E/I. |
4 | Providing coarse clean sand filling in foundation --do d0- all complete job. |
5 | Providingdesignation75Aone brickflat solingjointsfilled with sand -- do do all complete job |
6 | providingand laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work upto plinth level 1:3:6 ( 1 cement : 3 coarse sand (zone-III) : 6 graded stone aggregate 40 mm nominal size) |
7 | providingand laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work upto plinth level 1:2:4 ( 1 cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20mm nominal size) |
8 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - all work upto plinth level 1:1.5:3 ( 1 cement : 1.5 coarse sand (zone - iii) : 3 graded stone aggregate 20 mm nominal size) |
9 | Providing and laying in position specific grade of Reinforced cement concreteexcluding cost of centering, shuttering finishing and reinforcement :1:1.5:3 ( 1 cement : 1.5 coarse sand (zone-III) : 3 graded stone aggregate 20mm nominal size) TRAPEZOIDAL SECTION |
10 | 66X(3"X3"+0"10""X 0"10"")/2X1"0""=13X4.84"X1"=319.44 Cft |
11 | colm . Upto G.L66x0"10""x0"10""x1"6""=68.20 cft |
12 | colm. G.Lto above66( 0"10""x0"10"x8"3"")=375.11 cft |
13 | total |
14 | Reinforced cement concrete works in beams, suspended floors, roofs having slope upto 15 degree landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding cost of centering, shuttering finishing and reinforcement :1:1.5:3 ( 1 cement : 1.5 coarse sand (zone-III) : 3 graded stone aggregate 20mm nominal size) |
15 | bands |
16 | total |
17 | centering and shuttering including strutting, proping etc. and removal of form for |
18 | column |
19 | plinth beams |
20 | band at lintel level |
21 | total |
22 | Providingdesignation75 A b rick work inC.M (1:4) IN Superstructure with approved quality of clean coarse sand of F.M. 2 to 2.5 including -----do---do--- all complete as per building specification and direction of E/I |
23 | deduction colum |
24 | total |
25 | ProvidingTor steelreinforcementof 8 mm ,10 mmdia rodsas per approved design drawing in all R.C.C works including cutting bandingand placingthe rod --do --do all complete job foundation=14.95 m3 @80 kg/m3 =1196 kgrcc colum=21.60 m3 @130 kg/m3=2808 kg plinth beam=16.51 m3@130 kg/m3=2146.3 kgband =4.13 m3@ 130 kg/m3=536.9 kg TOTAL=6687.2 Kg. or6.69 MT |
26 | Providing 12 mm thick cement plaster (1:4) in exposedsurfaceor in approved quality of sand--do--do--all complete job |
27 | Providing two coat of snowcem of approved shadeand make over a coat of cementprimer new surface including preparing the plaster---do--do--all complete job. |
28 | supplying fitting and fixing 20 gauge G.C.I. sheet gate fitted on M.S. angle frame of size 60x60x6 mm . Including cost of fabrication providing necessary locking arrangement -do-do- all complete job. |
29 | Providing2 coat of paintingwith ready mixed paintof approved shadeand make over the steel surface --do--do- all complete job.(same Qty item no 16) |
30 | Labour for cleaning the worksite before and after work etc. |
31 | suplying and laying boulder soling ( properly as per design and drowing) riprap with good quality of boulders duly acked including the cost of materials royalty all taxes and labour charge etc. but excluding the cost of carrying all comlete as per specification & direction of E/I. |
32 | centering and shuttering including strutting , propping etc. and removal of form for foundation ,footings, base of columns etc. for mass concrete |
33 | CARRIAGE OF MATERIALS |
34 | cement(upto 1km) |
35 | sand(upto 20 km) |
36 | © bricks ( lead upto 8 km) |
37 | (e) steel ( lead upto 1 km) |
38 | stone chips (lead upto 7 km) |
39 | earth (lead upto 1 km) |
40 | Stone boulder (upto 7km) |
41 | Add 12 % GST |
42 | Adding Labour Cess @ 1% of Estimated Cost |