Construction Of Boundary Wall And Pcc Road At Muslimkabristhanghato Bagichain Ward 07Under Gumlanagar Parishad, Gumla-Jharkhand

Urban Development Department-UDD has published Construction Of Boundary Wall And Pcc Road At Muslimkabristhanghato Bagichain Ward 07Under Gumlanagar Parishad. Submission Date for this Tender is 03-11-2021. Road Work Tenders in Gumla Jharkhand. Bidders can get complete Tender details and download the document.




Tender Notice

29667832
Construction Of Boundary Wall And Pcc Road At Muslimkabristhanghato Bagichain Ward 07Under Gumlanagar Parishad
Open Tender
Indian
Jharkhand
Gumla
03-11-2021

Tender Details

Construction Of Boundary Wall And Pcc Road At Muslimkabristhanghato Bagichain Ward 07Under Gumlanagar Parishad

Key Value

Document Fees
INR 10000 /-
EMD
INR 65500.0 /-
Tender Value
INR 32.73 Lakhs /-

BOQ Items

Name of Work :- BOQ for theConstructionof boundry wall and pcc road at muslimkabristhanghato bagichain ward 07under GumlaNagar Parishad
Sl. No. Item Description
1Constructionof boundry wall and pcc road at muslimkabristhanghato bagichain ward 07under GumlaNagar Parishad
2dismantling pucca brick or lime work including stacking serviceable materials in countable stacks within 15M. Leads and disposal of unserviceable materials-do -doall complete job.
3Earthworkinexvactionin foundationin ordinary soilANDEARTHWORK IN HARDSOIL( videclassificationof soil item A)and disposalof excavated earth asobtainedto a distanceupto50 M --as per directionof E/I.
4Providing coarse clean sand filling in foundation --do d0- all complete job.
5Providingdesignation75Aone brickflat solingjointsfilled with sand -- do do all complete job
6providingand laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work upto plinth level 1:3:6 ( 1 cement : 3 coarse sand (zone-III) : 6 graded stone aggregate 40 mm nominal size)
7providingand laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work upto plinth level 1:2:4 ( 1 cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20mm nominal size)
8Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - all work upto plinth level 1:1.5:3 ( 1 cement : 1.5 coarse sand (zone - iii) : 3 graded stone aggregate 20 mm nominal size)
9Providing and laying in position specific grade of Reinforced cement concreteexcluding cost of centering, shuttering finishing and reinforcement :1:1.5:3 ( 1 cement : 1.5 coarse sand (zone-III) : 3 graded stone aggregate 20mm nominal size) TRAPEZOIDAL SECTION
1066X(3"X3"+0"10""X 0"10"")/2X1"0""=13X4.84"X1"=319.44 Cft
11colm . Upto G.L66x0"10""x0"10""x1"6""=68.20 cft
12colm. G.Lto above66( 0"10""x0"10"x8"3"")=375.11 cft
13total
14Reinforced cement concrete works in beams, suspended floors, roofs having slope upto 15 degree landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding cost of centering, shuttering finishing and reinforcement :1:1.5:3 ( 1 cement : 1.5 coarse sand (zone-III) : 3 graded stone aggregate 20mm nominal size)
15bands
16total
17centering and shuttering including strutting, proping etc. and removal of form for
18column
19plinth beams
20band at lintel level
21total
22Providingdesignation75 A b rick work inC.M (1:4) IN Superstructure with approved quality of clean coarse sand of F.M. 2 to 2.5 including -----do---do--- all complete as per building specification and direction of E/I
23deduction colum
24total
25ProvidingTor steelreinforcementof 8 mm ,10 mmdia rodsas per approved design drawing in all R.C.C works including cutting bandingand placingthe rod --do --do all complete job foundation=14.95 m3 @80 kg/m3 =1196 kgrcc colum=21.60 m3 @130 kg/m3=2808 kg plinth beam=16.51 m3@130 kg/m3=2146.3 kgband =4.13 m3@ 130 kg/m3=536.9 kg TOTAL=6687.2 Kg. or6.69 MT
26Providing 12 mm thick cement plaster (1:4) in exposedsurfaceor in approved quality of sand--do--do--all complete job
27Providing two coat of snowcem of approved shadeand make over a coat of cementprimer new surface including preparing the plaster---do--do--all complete job.
28supplying fitting and fixing 20 gauge G.C.I. sheet gate fitted on M.S. angle frame of size 60x60x6 mm . Including cost of fabrication providing necessary locking arrangement -do-do- all complete job.
29Providing2 coat of paintingwith ready mixed paintof approved shadeand make over the steel surface --do--do- all complete job.(same Qty item no 16)
30Labour for cleaning the worksite before and after work etc.
31suplying and laying boulder soling ( properly as per design and drowing) riprap with good quality of boulders duly acked including the cost of materials royalty all taxes and labour charge etc. but excluding the cost of carrying all comlete as per specification & direction of E/I.
32centering and shuttering including strutting , propping etc. and removal of form for foundation ,footings, base of columns etc. for mass concrete
33CARRIAGE OF MATERIALS
34cement(upto 1km)
35sand(upto 20 km)
36© bricks ( lead upto 8 km)
37(e) steel ( lead upto 1 km)
38stone chips (lead upto 7 km)
39earth (lead upto 1 km)
40Stone boulder (upto 7km)
41Add 12 % GST
42Adding Labour Cess @ 1% of Estimated Cost
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail