Madhyanchal Vidut Vitran Nigam Limited has published Quantum Of Work For Shifting Of 11 Kv Line And Distribution Transformer And Lt Line From Residential Plot At Transgangacity ( Nera Ganga Bairaj ) Under Edd-Ii, Unnao. Submission Date for this Tender is 15-11-2021. Distribution Transformer Tenders in UNNAO Uttar Pradesh. Bidders can get complete Tender details and download the document.
Sr No | CorrigendumDate | Corrignedum | CorrigendumType | NewSubmissionDate |
1 | 30-Oct-2021 | DATE 0116 | Date | 08-11-2021 |
2 | 08-Nov-2021 | DATE EXT116 | Date | 15-11-2021 |
Sl. No. | Item Description |
1 | Supply of following material |
2 | S.T. Pole 11 mtr Long (Duly painted) |
3 | PCC Pole 8.5 mtr Long |
4 | A.C.S.R Weasel Conductor |
5 | Stay set complete (stay rod 16x1800mm2 rod, stay wire 5 kg, stay clamp Nut&bolt) |
6 | Earthing Complete (2540x20mm) and 6 swg earth wire |
7 | G.I wire 6 swg |
8 | X- arms v type (65x65x6mm2)(Galvanized) |
9 | "F"Bracket (Galvanized) |
10 | "E"Bracket (Galvanized) |
11 | 11 KV Dise Insulator (t&c type) 45 KN |
12 | 11 KV Dise fitting (t&c type) 45 KN |
13 | 11 KV Pin Insulator |
14 | 11 KV G.I pin with Nut |
15 | M.s "T" off channel(125x65x300mm2)(galvanized) |
16 | M.S Top channel (100x50x2040)(galvanized) |
17 | PG clamp (Galvanized) |
18 | M.S Dropper Channel (100x50x2028mm2) (Galvanized) |
19 | M.SAngle (75x75x6x2028mm)(Galvanized) |
20 | Transformer 100 KVA |
21 | fuse set (11 KV) with clamp |
22 | Danger Board with nut & bolt |
23 | Barbed GI wire |
24 | Alluminium binding wire |
25 | M.S. Guarding angle65x65x6mm/1.6 mtr long (Galvanized) |
26 | LT clamp with nut & bolt |
27 | LT shackle insulator (100x115mm2) |
28 | A.B. conductor (3x95+1x70+1x16mm2) |
29 | Distribution Box |
30 | Distribution box clamp (40x6mm2) |
31 | Holding clamp with nut & bolt |
32 | Work for construction of line and S/s |
33 | Erection of single Pole (STP/PCC) Structure including digging of Pits fitting of all accessories along with cartage and dragging From dump site to pit site. |
34 | Erection of double Pole (STP/PCC) Structure including digging of pitsfitting of all accessories along with cartage and dragging from dump site to pit site. |
35 | Laying stringing and sagging of 11 KV line (3P,3W) by ACSR Weasel Conductor including all associated works and making clearance ofroad with jointing jumper and binding on insulator as required |
36 | Making "T" off arrangement including fabrication fitting of all accessories. |
37 | Earthing of pole as per RESPO Norms |
38 | Grounting of pole as per RESPO Norms |
39 | Digging of pits fixing nuzzling and grouting of stay Rod as per RESPO Norms with grouting materials. |
40 | Mounting of 100 KVATransformer on double pole and fitting of all accessories including its cortege from dump site tee pit site. |
41 | Earthing of trasformer bore/electrical type as per RESPO norms |
42 | Stringing and sagging of two wire of 6 S. W.G wire for gaurding and making lacing at one meter a part in the span between support including carriage of G-I wire from dump site to pit site. |
43 | Dismentaling of 11 KV line including pole conductor and accessories |
44 | Dismentaling of 25 KVA S/s including pole and other accessores |
45 | Laying of ABC size (3x95x1x70+1x16mm2) including all associated work as required |
46 | Fixing and instailation of disbtribution box on pole and all associated work as required. |
47 | Carriage of follwing materilasfrom site to sotre |
48 | Scrap conductor |
49 | Scrap iron |
50 | Trasnsformer 25 KVA |