Uttranchal Power Corp Ltd-UPCL has published Replacement Of Damaged Lt / Ht Pole In Different Village Of Dhauladevi Block Under Edsd Ii Danya-Toli Section Replacement Of Damaged Lt / Ht Pole In Different Village Of Dhauladevi Block Under Edsd Ii Danya-Toli Section. Submission Date for this Tender is 08-11-2021. Electric Pole Tenders in Toli Uttarakhand. Bidders can get complete Tender details and download the document.
Sl. No. | Item Description |
1 | Motarable cartage of Material from Almora to road side dump store Including Loading & Un-loading both End.Dist 72 Km ST Pole SP-21/SP-23 |
2 | Motarable cartage of Material from Almora to road side dump store Including Loading & Un-loading both End.Dist 72 KmST Pole SP-10 |
3 | Motarable cartage of Material from Almora to road side dump store Including Loading & Un-loading both End.Dist 72 Km Small Material |
4 | Head load cartage of pole & material from road site to work site distance aprox 3 Km SP-21/SP-23 |
5 | Head load cartage of pole & material from road site to work site distance aprox 3 Km SP-10 |
6 | Head load cartage of pole & material from road site to work site distance aprox 3 Km Small Material |
7 | Excavation of earth for pole pit for errection of pole in all type of soil in size 0.9X0.6X1/6X8.5 Mtr Sp 21 /SP23 pole |
8 | Excavation of earth for pole pit for errection of pole in all type of soil in size 0.9X0.6X1/6X8 Mtr Sp 10 pole |
9 | Excavation of earth for Stay pit for errection of Stay in all type of soil in size 0.6X0.6X1.2 CuMtr |
10 | Erection of Single Poles support in proper level and alignment alongwith Fixing all Accessories in the pole as per RESPO of SP-23 |
11 | Erection of Single Poles support in proper level and alignment alongwith Fixing all Accessories in the pole as per RESPO of SP-21 |
12 | Erection of Single Poles support in proper level and alignment alongwith Fixing all Accessories in the pole as per RESPO of SP-10. |
13 | Grouting of pole in CC ratio 1:4:8 including cost of Cement, sand, Stone ballast as per RESPO norms in size 0.45X0.45X1/9 of SP 21 /SP-23Pole |
14 | Grouting of pole in CC ratio 1:4:8 including cost of Cement, sand, Stone ballast as per RESPO norms in size 0.45X0.45X1/9 of SP 10 Pole |
15 | Muffing of Pole With CC 1:3:6 Block 45cm Height from Ground level Including cost of Ballast,cement & sand Etc. |
16 | Fixing, tightening and nozzaling of stay with pole as per RESPO |
17 | Grouting of stay in CC ratio 1:4:8 including cost of Cement, sand, Stone ballast as per RESPO norms in size 0.6X0.6X0.3 |
18 | Dismentling of existing line & wire including all material 1 Ph 2W LT Line |
19 | Dismentling of existing line & wire including all material 3Ph 4W LT Line |
20 | Dismentling of existing line & wire including all material 11 KV line with earth wire |
21 | Re-String of LT/HTLine with ACSR Weasel conductor as Main and Neutralincludinglaying,sagging & stringing of continuous earth wire with Jumphering etc complete work up to energizing 1 Ph 2W LT Line |
22 | Re-String of LT/HTLine with ACSR Weasel conductor as Main and Neutralincludinglaying,sagging & stringing of continuous earth wire with Jumphering etc complete work up to energizing 3Ph 4W LT Line |
23 | Re-String of LT/HTLine with ACSR Weasel conductor as Main and Neutralincludinglaying,sagging & stringing of continuous earth wire with Jumphering etc complete work up to energizing 11 KV line with earth wire |
24 | Dismentling of Existing LT pole including insulator, clamp & consumer connection with cartage back to JE store SP-10 |
25 | Dismentling of Existing LT pole including insulator, clamp & consumer connection with cartage back to JE store SP-21 |
26 | Dismentling of Existing HT pole including insulator, clamp & consumer connection with cartage back to JE store |
27 | Motarable cartage of Material from Almora to road side dump store Including Loading & Un-loading both End.Dist 55 Km Small Material |