Uttranchal Power Corp Ltd-UPCL has published Replacement Of Damaged Lt Pole And Giving Mid Span In Different Village Of Lamgara Feeder Replacement Of Damaged Lt Pole And Giving Mid Span In Different Village Of Lamgara Feeder Animating From 33 / 11 Kv S / S Lamgara Section. Submission Date for this Tender is 08-11-2021. Feeder Pillar Tenders in Lamgara Uttarakhand. Bidders can get complete Tender details and download the document.
Sl. No. | Item Description |
1 | Motarable cartage of Material from Almora to road side dump store Including Loading & Un-loading both End.Dist 60 Km ST Pole SP-21 |
2 | Motarable cartage of Material from Almora to road side dump store Including Loading & Un-loading both End.Dist 60 KmST Pole SP-10 |
3 | Motarable cartage of Material from Almora to road side dump store Including Loading & Un-loading both End.Dist 60 Km Small Material |
4 | Head load cartage of pole & material from road site to work site distance aprox 3 Km SP-21 |
5 | Head load cartage of pole & material from road site to work site distance aprox 3 Km SP-10 |
6 | Head load cartage of pole & material from road site to work site distance aprox 3 Km Small Material |
7 | Excavation of earth for pole pit for errection of pole in all type of soil in size 0.9X0.6X1/6X8.5 Mtr Sp 21 pole |
8 | Excavation of earth for pole pit for errection of pole in all type of soil in size 0.9X0.6X1/6X8 Mtr Sp 10 pole |
9 | Excavation of earth for Stay pit for errection of Stay in all type of soil in size 0.6X0.6X1.2 CuMtr |
10 | Erection of Single Poles support in proper level and alignment alongwith Fixing all Accessories in the pole as per RESPO of SP-21. |
11 | Erection of Single Poles support in proper level and alignment alongwith Fixing all Accessories in the pole as per RESPO of SP-10. |
12 | Grouting of pole in CC ratio 1:4:8 including cost of Cement, sand, Stone ballast as per RESPO norms in size 0.45X0.45X1/9 of SP 21 Pole |
13 | Grouting of pole in CC ratio 1:4:8 including cost of Cement, sand, Stone ballast as per RESPO norms in size 0.45X0.45X1/9 of SP 10 Pole |
14 | Muffing of Pole With CC 1:3:6 Block 45cm Height from Ground level Including cost of Ballast,cement & sand Etc. |
15 | Fixing, tightening and nozzaling of stay with pole as per RESPO |
16 | Grouting of stay in CC ratio 1:4:8 including cost of Cement, sand, Stone ballast as per RESPO norms in size 0.6X0.6X0.3 |
17 | Laying, Sagging & Stringing of LTLine with ACSR Weasel conductor as Main and Neutralincludinglaying,sagging & stringing of continuous earth wire with Jumphering etc complete work up to energizing 1 Phase for jumpering |
18 | Dismentling of Existing LT pole including insulator, clamp & consumer connection with cartage back to JE store SP-10/21 |
19 | Head load cartage of pole & material from road site to work site distance aprox 3 Km Small Material |
20 | Motarable cartage of Material from Almora to road side dump store Including Loading & Un-loading both End.Dist 60 Km Small Material |