Paschimanchal Vidyut Vitran Nigam Limited has published Shifting Of Damaged 11Kv O / H Line To U / G Of 11Kv Shankar Puri Feeder Under Naveen Jila Vidyut Vikas Nidhi Under Ee Eudd-V Gzb. Submission Date for this Tender is 15-11-2021. Overhead Line Tenders in Ghaziabad Uttar Pradesh. Bidders can get complete Tender details and download the document.
Sr No | CorrigendumDate | Corrignedum | CorrigendumType | NewSubmissionDate |
1 | 01-Nov-2021 | Date extend | Date | 11-11-2021 |
2 | 11-Nov-2021 | DATE EXTENSION | Date | 15-11-2021 |
Sl. No. | Item Description |
1 | Cartage of ST pole 11/13 meter long from store center Meerut road GZBto siteincluding loading and unloading at both side |
2 | Loading safe Cartage & unloading of hevay stock line material ,pin insulator,diecs insultor angle ,channel , Set ,stay,,jointing kit , and other line material from store center Meerut road GZB to site |
3 | Cartage of 11KV XLPE Cable size 3x185mm2 from store center Meerut road GZB/SHBto siteincluding loading and unloading at both side |
4 | Cutting /Drilling/welding of MS Channel Top & Dropper Channel& complete work in all respect. For D/P |
5 | Errection of D/P with 11/13 meter long ST pole after digging of pits in proper size 1500x600x500 MM and fixing of all material on D/P and refilling by earth & complete work in all respect. |
6 | Fixing of all assosrieses ( Channeal/angle,clamps, insulaor etc ) on Double pole & complete work in all respect. |
7 | Digging of 11 KV cable trench normal & hard soil & complete work in all respect as per norms. |
8 | Lying of 11 KV XLPE cable of size 3x185 mm2 in trench with briks & sand& complete work in all respect as per norms. |
9 | Filling of 11 KV XLPE cable Jointing Kit size 3x185 mm2 & complete work in all respect as per norms. |
10 | Paint of Double pole Structure after rubbing/cleaing of surface as per required complete work in all respect as per RESPO norms. |
11 | Concreting of ST pole with cement,sand,& brick ballast in ratio 1:4:8 including cost of all materials & complete work in all respect as per RESPO norms. |
12 | Hosting of 11 KV 3x185 mmsq XLPE cable on D/P structure Through GI Pipe Fixed on D/P Structure incuding jumperning Complete with ClampsBolts and Nuts. |
13 | Restoration of Pits After Laying of Cable loop |
14 | Fixing and providing GI Pipe 6" Diafor support ofXLPE Cable |
15 | Fixing and providing MS pole clamp with nut & boltdefrent size |
16 | Dismantling of all fitting & conductor on ST pole (Single Pole)effectedexiting 11 KV line |
17 | Dismantling ofST pole old and useexiting 11KV line |
18 | Cartage of old pole from Site to Je/Store center including loading and unloading t both end. |
19 | Cartage of old materials scrap (Channel/angle.etc ) from Site to Je/Store center including loading and unloading at both end. |
20 | Making of allcable connectionconnection on Double pole & single pole complete work in all respect |
21 | Fixing and providing Danger board with clamp nut & bolt |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail