}

Bids Are Invited For Engaging Minimum One Fgm ( Semi Skilled Category Of Worker ) Per Shift - Outsourcing For Operation Of Transmitter Ac Plant Along With Dg Sets In Transmitter In Three Shifts Per Day For 8 Hours Each Shift For Seven Daysin A Week With-Assam

Indian Army-IA has published Bids Are Invited For Engaging Minimum One Fgm ( Semi Skilled Category Of Worker ) Per Shift - Outsourcing For Operation Of Transmitter Ac Plant Along With Dg Sets In Transmitter In Three Shifts Per Day For 8 Hours Each Shift For Seven Daysin A Week With. Submission Date for this Tender is 19-10-2021. Railway Ancillaries Tenders in Assam. Bidders can get complete Tender details and download the document.




Tender Notice

29520536
Bids Are Invited For Engaging Minimum One Fgm ( Semi Skilled Category Of Worker ) Per Shift - Outsourcing For Operation Of Transmitter Ac Plant Along With Dg Sets In Transmitter In Three Shifts Per Day For 8 Hours Each Shift For Seven Daysin A Week With
Open Tender
Indian
Assam
19-10-2021

Tender Details

Bids Are Invited For Engaging Minimum One Fgm ( Semi Skilled Category Of Worker ) Per Shift - Outsourcing For Operation Of Transmitter Ac Plant Along With Dg Sets In Transmitter In Three Shifts Per Day For 8 Hours Each Shift For Seven Daysin A Week With One Operator ( Semi Skilled ) Per Shift Comprising Of The Followingplant / Machineries / Equipmentsat Af Stn Tezpur All As Directed By Engr-In-Charge. ( I ) 20 Kvadg Set, 415 Volt, 50 Hz -01 No ( Ii ) 62.5 Kva Dg Set, 415V Ac, 50Hz. - 01 No ( Iii ) 160Kva Dg Set, 415V Ac, 50Hz. - 01 No At Dwr Bldg. ( Iv ) Package Type Ac Plant 5.5Tr X 3 Nos ( 02 Nos Running And 01 No In Standby ) ( V ) Ducts. ( Vi ) Operation Of Security Lights Switches As Per Time Schedule Given By The Engr-In-Charge. ( Vii ) Operation Of Lt Panel Board As And When Requirednotes Applicable For Items No. 1 To 4 ( I ) Rate Quoted Shall Be Inclusive Of All Taxes, Cess, Levies As Applicable And Gst. ( Ii ) The Quoted Rate Is Inclusive Of Epf, Esic As Per Epf Act 1952 And Esi Act 1948, As Amended From Time To Time . ( Iii ) The Quoted Rate Should Also Include Superintendence, Overheads And Profit And Including All Taxes And Insert Amount To Cover All. ( Iv ) Contribution Towards Bonus, Esic &Epf Shall Be Payable Only After Submission Of Valid And Authentic Document In Support Of Payment By The Contractor. ( V ) The Operator Should Record Temperature, Humidity For Ac Plant & Daily Di Details For Dg Set In The Register As Provided By Contractor ( Vi ) The Ac Plant Operator Must Be Qualified For Operating The Entire Plant System ( Viii ) Collect Dhpp ( N ) From Mes Source ( Power House ) As And When Required To Fill In Dg Set. , Engaging Minimum Onesemi Skilled Category Of Worker Per Shift - Outsourcing For Operation Of Ptt ( Simulator ) Ac Plant Alongwith Dg Setsin Three Shifts Per Day For 8 Hours Each Shift For Seven Daysin A Week With One Operator ( Semi Skilled ) Per Shift Comprising Of The Followingplant / Machineries / Equipmentsat Af Stn Tezpur All As Directed By Engr-In-Charge.Notes:- ( I ) Dg Sets Ofcapacity160 Kva - 03 Nos ( 01 No Running And 02 Nos Standby ) ( Ii ) 3 X 11 Tr Package Type Ac Plant ( 02 Nos Running 01 No Standby ) ( Iii ) Fire Fitting Pumping Set ( Diesel Engine Pump Set 30 Hp - 01 No, Electric Driven Pump 30 Hp - 02 Nos, Jockey Pump 5 Hp - 01 No ) ( Iv ) Ducts ( V ) Operation Of Lt Panel Board As And When Required. ( Vi ) Operation Of Security Lights Switches As Per Time Schedule Given By The Engr-In-Chargenote:-For ( I ) And ( Ii ) Please Refernote ( I ) & ( Ii ) Of Item No. 01 ( Iii ) The Operator Should Record Temperature, Humidity For Ac Plant & Daily Di Details For Dg Set In The Register As Provided By Contractor ( Iv ) The Ac Plant Operator Must Be Qualified For Operating The Entire Plant System ( V ) In Addition To Above The Operator Shall Be Responsible For Switching On / Off Of The Street Lights / High Mast Lightswithin The 500Mtr Distance Of The Installations.The Switching On / Off Timing Will Be Provided By The Engr-In-Charge. ( Vi ) Collect Dhpp ( N ) From Mes Source ( Power House ) As And When Required To Fill In Dg Set. , Item No. 03 Engaging Minimum One Fgm ( Semi Skilled Category Of Worker ) Per Shift - Outsourcing For Operation Of Air Conditioninginstallation Fully Computerized System At Brahmos Drdo In Three Shifts Per Day For 8 Hours Each Shift For Seven Daysin A Week With One Operator ( Semi Skilled ) Per Shiftcomprising Of The Followingplants / Machineries / Equipmentsat Af Stn Tezpur:- ( I ) Chiller Unit Complete With Compressor 180 Tr. Make:Blue Star - 03Nos ( Ii ) Primary Pump 7.5 Kw. Make - Kirloskar - 03 Nos ( Iii ) Secondary Pump 7.5 Kw. Make - Kirloskar - 03 Nos ( Iv ) Condensor Pump -15 Kw -03 Nos ( V ) Frp Cooling Tower -03 Nos ( Vi ) Hot Water Generator Pump 45 Kw - 04 Nos ( Vii ) Hot Water Generator Pump 90 Kw - 03 Nos ( Viii ) Ahu Floor Mounted-11Nos ( Bldg No-B4, B5, B6 ) ( Ix ) -Do- But Scu ( Suspended Ceiling Unit -72 No ( Bldg No-B1, B2, B3 ) ( X ) Control Panel For Ac Plant -01 No ( Xi ) Lcd Monitor 52 Complete For Monitoring All Ahus / Ac Plant Equipments -01 Nosnote:-- ( I ) And ( Ii ) Please Refernote ( I ) & ( Ii ) Of Item No. 01 ( Iii ) The Operator Should Record Temperature And Humidity In The Register As Provided By Contractor ( Iv ) The Ac Plant Operator Must Be Qualified For Operating The Entire Plant System ( V ) In Addition To Above The Operator Shall Be Responsible For Switching On / Off Of The Street Lights / High Mast Lightswithin The 500Mtr Distance Of The Installations.The Switching On / Off Timing Will Be Provided By The Engr-In-Charge. , Item No. 04 Engaging Minimum One Fgm ( Semi Skilled Category Of Worker ) Per Shift - Outsourcing For Operation Of Pump House, Dg Set Andfire Fightingsystemin One Shifts Per Day ( 8.00 Am To 4.00 Pm ) For 8 Hours Each Shift For Seven Daysin A Week With One Operator ( Semi Skilled ) Per Shiftcomprising Of The Followingplants / Machineries / Equipmentsat Af Stn Tezpur All As Directed - ( I ) Borewell With 5 Hp Submersible Pump Set. Make: Kirloskar- 02 Nos ( Ii ) Water Treatment Plant Including Iron Removal Filter, Dual Media Filter, Activated Carbon Filter & Water Softner Of 8 Cum / Hr =01 Each ( Iii ) Raw Water Pump Motor7.5 Hp= 02 Nos ( Iv ) Treated Water Pump Motor 7.5 Hp = 02 Nos ( V ) Electrical Driven Pump 75Kw / 100Hp -01 No ( Vi ) Diesel Engine Driven Pump 75Kw / 100Hp - 01 No ( Vii ) Jockey Pump Capacity 15Kw / 20Hp-01 No ( Viii ) Dg Set 500 Kva Withamf Panel Make:Powwarica- 03 Nos ( Ix ) One Computer With Lcd Monitor Completefor Fire Alarm System Monitoring Auto System With Ups 10 Kva-01 No , Item No. 05 - Supply And Fixing V Belt Of Size A-23.Make: Fenner / Dunlop / Finolex , Item No. 06 - Supply And Fixing Rotary Actuator For Ball Valve, Having Torque 5 Nm, Angular Rotaton 90 Degree, Position Time 150 Second, Ip 54 Degree Of Protection Operation Ac 24 V, Dc 24 V Operating Voltage And ( -32 Degree To 55 Degree ) Centigrade Complete All As Specificed As Directed. Make :- Siemens Or Equivalent Total Quantity : 1

Key Value

Document Fees
Refer document
EMD
INR 62420.0 /-
Tender Value
Refer document
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail