Indian Oil Corporation Limited-IOCL has published Cleaning Of Fire Water Tanks At Varanasi Bp Periodic Cleaning , Painting For 02 Nos Fire Water Storage Tanks At Lpg Bottling Plant , Varanasi. Submission Date for this Tender is 12-10-2021. Tanks and Cylinders Tenders in IOCL LPG Bottling Plant Uttar Pradesh. Bidders can get complete Tender details and download the document.
Sl. No. | Item Description |
1 | PERIODIC CLEANING , PAINTING FOR 02 NOS FIRE WATER STORAGE TANKS AT LPG BOTTLING PLANT , VARANASI |
2 | Isolation, binding of connected pipelines, Removal of Valves, Opening of manholes, removal of mud as per the instruction of site engineer, Draining of extra water. Refixing valves, manholes ,pipelineswith new gaskets & nut bolts after completion of testing .Job of cleaning & painting of pipelines in tank farm area( one coat primer , two coat paint ) removal & repairing & Refixingof level gauges of fire water tanks, supply of new gaskets & nut bolts for fixing valves & manholes , maintain proper slope of tank pad foundation from annular plateto the surrounding drain , Repairing oftank pad foundations etc with PCC& plaster work. |
3 | Cleaning the internal surface of the tanks by SAND BLASTINGfor the entire area such as internal roof and shell plates. Bottom plates, roof structural, columns, girders, rafter etc as directed by site in charge and removal of tank sludge/dust has to be deposited off to a far-off distance outside the plant premises as per the direction of site engineer. Internal Painting ofWater Tank: Zone A: Bottom plate, internal shell plates, roof supporting columns to be blast cleanedto Sa 2 1/2and repainted as mentioned bwlow. 1) Primer (P2)- Polyamide cured Epoxy Zinc phospate DFT 70-75 micron.2) Finish Paint (F4) Solvent Less HB Expoxy Liner , DFT -500 micron( 2 coats of 250 micron each ) Total DFT =575 Micron. The items Include Supply of Paints, Required metalScaffolding, labours, tools and Tackles. After completion of cleaning &painting the piping and valves are to be fixed back as directed by Site Engineer Side wall & Bottom plate thickness testing as directed by IOCL. (2 TANKS) |
4 | "External Painting: Zone A: Fire Water tank repainting with Structures and pipelines up to first reparation by Hand / Wire brush Cleaning to St-2. Primer -Self PrimingHB Epoxy (P4), dft-100-125 microm. Intermidtae coat :Polyamide Curved HB Epoxy MIO(U1), DFT -100-125 micron .Finish Paint -Two pack Acrylic Polyurethane(PU)(F1), 40-45 micron . Total DFT =240 micron. The items Include Supply of Paints, Required metal Scaffolding, labours, tools and Tackles. Item also includes painting of Two nos.IOC logo with tank writing work as per standard specifications and LOOK on each tank. Servicing, recondititioning and painting of the hand operated isolation valves and fixing back the same with new gaskets as directed at site including supply of gaskets, packing ropes for the tank valves (2 tanks) |