Tn 2224 / 3A Date 04-09-2021 1. Repair Work Of Bridges Under Assistant Engineer-I. 1. Repair Work Of Bridges Under Assistant Engineer-I., Saharanpur-Uttar Pradesh

Public Works Department-PWD has published Tn 2224 / 3A Date 04-09-2021 1. Repair Work Of Bridges Under Assistant Engineer-I. 1. Repair Work Of Bridges Under Assistant Engineer-I.. Submission Date for this Tender is 29-09-2021. Bridge Work Tenders in Saharanpur Uttar Pradesh. Bidders can get complete Tender details and download the document.




Tender Notice

29328119
Tn 2224 / 3A Date 04-09-2021 1. Repair Work Of Bridges Under Assistant Engineer-I. 1. Repair Work Of Bridges Under Assistant Engineer-I.
Open Tender
Indian
Uttar Pradesh
Saharanpur
29-09-2021

Tender Details

Tn 2224 / 3A Date 04-09-2021 1. Repair Work Of Bridges Under Assistant Engineer-I. 1. Repair Work Of Bridges Under Assistant Engineer-I.

Key Value

Document Fees
INR 677 /-
EMD
Refer document
Tender Value
Refer document

BOQ Items

Name of Work: lgk;d vfHk;Urk izFke ds v/khu iqyksa dh ejEer dk dk;ZA
Sl. No. Item Description
1Earth work in cutting or in embankment in ordinary soil excavation to be in theform of regular pits not exceeding 0.50 M. in depth and earth work in embankment to be in 20 cm. layers including remmingand dressing the surface to required levels and slopes and also including 1.50 M. liftand 30 M. lead. The earth from cutting to be used in making embankment or to be deposited as spoil banks with-in 30 M. distance as directed by the Engineerincharge.(Royality removed by Govt. ) for small works/ Abadi area. (where machine can not move ) (including cartage earth )
2Providing and laying Filter material underneath pitching in slopes complete as per drawing and Technical specification
3Providing and laying boulder pitching for bed protection with stone boulders of minimum size and weight (25kg) laid dry complete as per drawing and technical specification (MORD 1300)
4Providing and laying of boulder apron laid in wire crates made with 4mm dia GI wire conforming to IS: 280 & IS:4826 in 100mm x 100mm mesh (weaved diagonally) including 10 per centextra for laps and joints laid with stone boulders weighing not less than 40 kg each.
5Dismantling reinforced cement concrete or reinforced brick work including stacking of materials as directed by the Engineer-in-charge within a distance of 60 metre (200 feet). (S.I. No. 694)
6Furnishing and Placing Reinforced/Prestressed Cement Concrete in Super Structure as per drawing and technical Specification. (RCC Grade M30 Using Batching Planttransit mixer & concrete pump)
7Supplying, fitting and placing HYSD bar reinforcement in Super-structure complete as per drawing and technical specifications
8Painting on divider 1 priming and two coats of enamel paintincluding supply of all materials, labour, Tools & plants etc. required for proper completion of the work. (S.I. No. 761 C)
9Epoxy Bonding of new concrete to old concrete
10Excavation in foundation in soil mixed with moorum single, kankar requiring the use of special T&P such as pick axes, sabbals etc.including lift upto 1.50m and lead upto 30m and including filling watering and ramming of excavated earth or into the trenches or into the space between the building and the side of foundation trenches or in to the plinth and removal and disposal of surplus earth as directed by the Engineer-in-charge upto a distance of 30M as per S.I. No. 252(a)
11Concrete with 4 cm gauge approved coarse sand cement in proportion 8 :4 :1 including supply of all materials labour and tools and plants etc. required for proper completion of the work. (as per Sl. No. 281)
12M-150 Brick Work in One Cement & Three Coarse Sand in foundation and plinth including supply of all materials labour, Tools & plants etc. required for proper completion of the work (S.I. No. 307)
1312 mm thick plaster (1:3) with one part cement and 3 parts approved coarse sand including supply of all materials, labour, T&P etc for proper completion of work. (SI No. 583)
14Cement Concrete with 4 cm gauge approved stone grit, coarse sand & cement in the proportion of 4:2:1 including supply of all materials, labour, Tools & plants etc. required for proper completion of the work. (S.I. No. 279(a)
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail