Steel Industrials Kerala Limited has published Design, Supply, Assembly, Installation And Commissioning Of Single Track 750Kw/500Hz One Ton Induction Furnace And Accessories As Per The Technical Specifications And Detailed Scope- As Turnkey Project At Silk Foundry Unit, Ottapalam,Palakkad,Kerala Desig. Submission Date for this Tender is 24-10-2021. Furnace supply Tenders in SILK Foundry Unit, Ottapalam Kerala. Bidders can get complete Tender details and download the document.
Sr No | CorrigendumDate | Corrignedum | CorrigendumType | NewSubmissionDate |
1 | 12-Oct-2021 | Date | Date | 24-10-2021 |
Sl. No. | Item Description |
1 | Design, Supply, Assembly, Installation and Commissioning of Singletrack 750KW/500Hz One Ton Induction Furnace including furnace transformer, Cooling tower with necessary hydraulic power unit internal and external water pumps, overhead and underground tanks, online UPS, Pollution Control equipment’s with blower, chimney & RCC treatment tank and all necessary civil works and other related works etc as per the technical specifications and detailed scope – asturnkey Project”at SILK Foundry Unit, Ottapalam, Palakkad, Kerala |
2 | Supply, installation and commissioning of Melting Furnace of 1000 Kg capacity with hydraulic tilting arrangement, water cooled leads and interconnecting arrangement, including optimizer and handle operated furnace selector switches and necessary required accessoriers |
3 | Supply, installation and commissioning of 750 KW/500 Hz Control system with internal water circulating system and hydraulic power supply unit and necessary required accessoriers |
4 | Supply, installation and commissioning of 415 V/ 875 KVA Furnace Transformer with LBS Panel. Work also includessupply, termination installataion of electrical power connections from transformer to furnace and necessary required accessoriers |
5 | Civil platform for the furnce including stairs and hand rails and other necessary facilities as required. |
6 | Civil foundation for Transformer and other necessary facilities as required. |
7 | Construction of cooling tower with RCC tank |
8 | Supply and installation of heat exchanger and necessary piping and ducting. |
9 | Construction of RCC DM Water tank . Provide DM water Pump, Water Cooled cable, Hydraulic power pack units and other necessary accessoriers |
10 | Construction of Overhead tank for emergency water supply, Work includes excavation, PCC, RCC pedastals, Structural Steel works , MS Tubular sections in hand rail guard railings of minimum 1mtr height riveted,welded,bolted sections including cutting, drilling holes all complete. |
11 | Supply and installation of 10,000 ltr water tank with necessary ladder with hand railinngs |
12 | Supply and installation of Pollution Control Equipments including blower, chimney and RCC Treatment tank, 2 HP centrifugal pump and necessary electrical and water pipe line connections |
13 | Supply and installation of Online UPS with a minimum 30 min backup time including battery and stacking arrangements |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail