Consultancy Services For Detailed Project Report Preparation For Widening Of Existing Rob In Udgir City Portion Stretch Length 0.710 Km Of Nh 50 And Widening Of Existing Rob In Udgir City Portion Stretch Length 0.600 Km Of Nh 63 In State Of Maharasht Cons, nanded-Maharashtra

Ministry Of Road Transport And Highways has published Consultancy Services For Detailed Project Report Preparation For Widening Of Existing Rob In Udgir City Portion Stretch Length 0.710 Km Of Nh 50 And Widening Of Existing Rob In Udgir City Portion Stretch Length 0.600 Km Of Nh 63 In State Of Maharasht Cons. Submission Date for this Tender is 29-09-2021. Consultancy Service Tenders in nanded Maharashtra. Bidders can get complete Tender details and download the document.




Tender Notice

29300710
Consultancy Services For Detailed Project Report Preparation For Widening Of Existing Rob In Udgir City Portion Stretch Length 0.710 Km Of Nh 50 And Widening Of Existing Rob In Udgir City Portion Stretch Length 0.600 Km Of Nh 63 In State Of Maharasht Cons
Open Tender
Indian
Maharashtra
nanded
29-09-2021

Tender Details

Consultancy Services For Detailed Project Report Preparation For Widening Of Existing Rob In Udgir City Portion Stretch Length 0.710 Km Of Nh 50 And Widening Of Existing Rob In Udgir City Portion Stretch Length 0.600 Km Of Nh 63 In State Of Maharasht Consultancy Services For Detailed Project Report Preparation For Widening Of Existing Rob In Udgir City Portion Stretch Length 0.710 Km Of Nh 50 And Widening Of Existing Rob In Udgir City Portion Stretch Length 0.600 Km Of Nh 63 In State Of Maharasht

Key Value

Document Fees
INR 900 /-
EMD
Refer document
Tender Value
Refer document

BOQ Items

NAME OF WORK : Consultancy services for the preparation of Feasibility studies and Detailed project report for the work of Widening of Existing ROB in Udgir City Portion stretch Length 0.710 km of NH 50 and Widening of Existing ROB in Udgir City Portion stretch Length 0.600 km of NH 63 in state of Maharashtra.
Sl. No. Item Description
1Key Personnel
2Team Leader cum Senior Bridge Engineer
3Bridge/Structural Engineer
4Highway cum Pavement Engineer
5Material-cum-Geotechnical Engineer- Geologist
6Senior Survey Engineer
7Senior Geologist
8Environmental Specialist
9Quantity Surveyor/ Documentation Expert
10B: Sub Professional Staff (To be assessed by Consultant as per requirement of assignment and one sub-professional be a fresh graduate)
11To be filled by Consultant
12To be filled by Consultant
13To be filled by Consultant
14To be filled by Consultant
15To be filled by Consultant
16To be filled by Consultant
17To be filled by Consultant
18Support Staff
19Office Manager
20Typist
21Office Boy
22Night Watchman
23The vehicles provided by the Consultants shall include the cost for rental, drivers, operation, maintenance, repairs, insurance, etc. A. For use of consultants
24Duty Travel to Site (Fixed Costs)
25Office Rent (Fixed Costs) The rent cost includes maintenance, Cleaning, repairs, etc.
26VI. Office Supplies, Utilities and Communication ( Fixed Costs )
27Office Supplies Drafting
28Supplies computer
29Running Costs
30Domestic and International Communication
31Office Furniture and Equipment ( Rental )
32Office Furniture and Equipment
33VIII.Reports and Document Printing
34Monthly Report (per month)
35Inception Report & QAP
36Environment and Social Impact Screening Report
37Draft Feasibility Report
38Final Feasibility Report
39Strip Plan with L.A. Reports
40Draft LA and Clearances I Report
41Final LA and Clearances I Report
42Draft Environmental Assessment report & RAP
43Final Environmental Assessment report & RAP
44Draft Detailed Design Report & Drawings etc.
45Draft EMP
46Draft Bidding Documents
47Final Detailed Project Report with Bill of Quantities, Cost Estimates, Updated Drawings ,etc
48Final EMP
49Final Bidding Documents
50Draft 3(a) ,3(A) and 3(D) notification for land acquisition ( 3 copies each)
51LA & Clearances II Report
52IX Survey and Investigation
53Topographic Survey including hire charges for equipment and supply of survey Teams comprising of project survey field staff etc. inclusive of cost of materials , labourer.
54Detailed topographic surveys using Air Borne Tomography and Air Borne LiDAR Technology
55B. Investigation (Fixed cost)
56Road and Bridge Inventory
57FWD Test and Pavement Evaluation
58Roughness Survey
59Axle Load Survey
60Material Survey and Investigation
61Sub-grade Investigation
62Traffic Survey
63Socio-economic & Census Survey/ Studies
64Land Acquisition Studies
65Any other investigations/surveys
66C. NET WORK SURVEY AND GPR
67Net work Survey of the existing Highways as a responsitory for civil work as per direction from Authority
68GPR Survey for detection of under ground utilities
69Cost of supply and fixing boundary pillars
70Procuring and fixing boundary pillars and its installation, complete in all respect as per IRC:25,1967:Wherever the proposed alignment follows the existing alignment, the boundary pillars shall be fixed at an interval of 200m on either side of proposed Right of Way. Wherever there is a proposal of realignment of the existing Highway and/or construction of New Bypasses, Consultant shall fix boundary pillars along the proposed alignment on the extreme boundary on either side of the project Highway at 50 m interval. (lumpsum )
71Land acquisition Team including support staff and logistics/transportation
72Ex-Land revenue inspector/officer or equivalent
73EX-kanoogo/Girdwar or equivalent
74Ex-Patwari or equivalent
75typist
76peon
77Logistic for Land Acquisition Team
78computer including necessary peripherals
79printers
80Vehicles(Bolero or equivalent )with monthly running limit of 4000 km
81Estimate of Costfor Expatriate Consultants (INR) Remuneration of Exptriate staff including per diem allowances
82Staff 1
83Staff 2
84Staff 3
85Staff 4
86Staff 5
87Staff 6
88International Airfares (Fixed Cost) Mobilization andDemobilization
89Position 1
90Position 2
91Position 3
92Position 4
93Inland Travel in Home Country (Fixed Costs)
94Airlines
95Other Miscellaneous expenses (like DA, internal travel expenses other incidentals)
96Income Tax (Expariate)
97Other Taxes / Duties (if any) Specify clearly
98Goods & Service Tax
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail