Uttar Pradesh Rajya Vidyut Utpadan Nigam Limited-UPRVUNL has published Electrical Maintenance Works In 220Kv 132Kv Switchyards And Cleaning Of Various Outdoor And Indoor Electrical Equipments Of B And C Tps Electrical Maintenance Works In 220Kv 132Kv Switchyards And Cleaning Of Various Outdoor And Indoor Electrical Equipme. Submission Date for this Tender is 06-12-2021. Electrical Maintenance Tenders in Office of the SE OandMC-IV DTPS Kasimpur Uttar Pradesh. Bidders can get complete Tender details and download the document.
Sr No | CorrigendumDate | Corrignedum | CorrigendumType | NewSubmissionDate |
1 | 25-Oct-2021 | Ist Time Extension | Date | 10-11-2021 |
2 | 11-Nov-2021 | IInd Time Extension | Date | 06-12-2021 |
Sl. No. | Item Description |
1 | Dismantling of damaged CT, PT & LA including Insulators and Erection & Commissioning of other new tested equipment as per following scope of work. |
2 | Replacement of damaged post insulators/post insulator with isolator arm as per following scope of work. |
3 | Maintenance of Isolators (All three phases) R.Y.B.as per following scope of work |
4 | Maintenance of Bus Bar as per following scope of work |
5 | Maintenance of Bus Bar as per following scope of work |
6 | Preventive Maintenance of SF-6 Circuit Breakers as per following scope of work. |
7 | Replacement of Gaskets & Valves of Transformers: |
8 | Replacement of Valves Gasket |
9 | Replacement of Gasket of each pole of HT Bushings |
10 | Replacement of damaged radiator of LT transformer. |
11 | Replacement/Tightening of damaged clamps (T-Clamps PG-Clamps End Clamps etc.) of CT CBIsolators etc |
12 | Providing manpower for service support for performing different tests such as Tan Delta Test, Primary Injection Test, Circuit Breaker Timing, Contact Resistance etc. of CTs, PTs, CBs, CVTs,isolators etc. as per following scope of work |
13 | Tightening of flexible jumpers & nut-bolts, earth strips etc of one bushing of Unit # 07 Generator bushing/GT LV side maintenance |
14 | Replacement of damaged flexible jumpers of one bushing of Unit # 07 Generator bushing/GT LV side maintenance |
15 | DG set maintenance of ‘B’ & ‘C’ TPH (Providing manpower for service support for replacement of damaged rim gear, self, balancing of DG set etc. |
16 | C Thermal Power Station |
17 | Cleaning of 19 Nos LT Transformers |
18 | Cleaning of Transformer Yard of R1 R 2 etc |
19 | Cleaning of Generator panels of UCR of Unit No 7 including other panels |
20 | Cleaning of Generating Transformer of Unit No 7 |
21 | Cleaning of 11KV duct of all three phases from Generator to GT of Unit No 7 |
22 | Cleaning of Station Transformer R 1 and R2 |
23 | Cleaning of PTs CTs of 132 /220KV Outdoor |
24 | Cleaning of battery room of stage V and VI etc |
25 | Cleaning of SEE panels |
26 | Cleaning of Circuit Breakers of 220KV/132KV Feeders |
27 | B Thermal Power Station |
28 | Cleaning of 15 Nos. of LT Transformers |
29 | Cleaning of various panels in MCR |
30 | Cleaning of Circuit Breakers of 220KV/132KV Feeders |
31 | Cleaning of PTs and CTs of 220KV/132KV Feeders |
32 | Cleaning of Battery Room of Stage III and IV including other areas |
33 | Cleaning of ICT 1T and 2T |
34 | Cleaning of 9T and10T station transformer |
35 | Cleaning of PLCC carrier panels |