drain and Ramp Work On Naali In Swami Hari Das Ki Bagichi Through R.C.C. Sr No-45 Zone-2 z , AGRA-Uttar Pradesh

Agra Municipal Corporation has published drain and Ramp Work On Naali In Swami Hari Das Ki Bagichi Through R.C.C. Sr No-45 Zone-2 z . Submission Date for this Tender is 28-09-2021. Drainage Tenders in AGRA Uttar Pradesh. Bidders can get complete Tender details and download the document.




Tender Notice

29289042
drain and Ramp Work On Naali In Swami Hari Das Ki Bagichi Through R.C.C. Sr No-45 Zone-2 z
Open Tender
Indian
Uttar Pradesh
AGRA
28-09-2021

Tender Details

drain and Ramp Work On Naali In Swami Hari Das Ki Bagichi Through R.C.C. Sr No-45 Zone-2 z

Key Value

Document Fees
INR 500 /-
EMD
INR 64570.0 /-
Tender Value
Refer document

BOQ Items

Name of Work:
Sl. No. Item Description
1Excavation in foundation in ordinary Soil (Loam, Cley or sand) including, lift up to 1.50 M and lead up to 30 M and including filling watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer-in-charge up to a distance of 30 M form the foundation trenches. Including royalty. (SI No. 251)
2Earth work in Filling in ordinary Soil (Loam, Clay or sand) including, lift up to 1.50 M and lead up to 30 M and including filling watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer-in-charge up to a distance of 30 M form the foundation trenches. Including royalty. (SI No. 251)
3Providing and laying cement concrete in 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) and curing complete, including cost of form work in foundation and floors. (DSR SN-4.1.10)
4Renforced cement concrete work in walls (any thickness), including attachedplasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struls etc. including cost of centering, shuttering, and excluding Reinforceement 1:1½:3(1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size)
5R.C.C. work Providing and laying in position specified grade of renforced cement concrete, including the cost of centering, shuttering, finishing and excluding reinforcement. All work up to plinth level : 1:2:4(1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) (S.I. No. 5.1.3)
6Mild Steel or iron in plain work such as reinforced concrete or reinforced brick work (When not included in and an overall rates) brought to required shape as necessary including bending for proper completion of the work and including supply of steel, its wastage bend hooks and authorized over lapping shall be measured up to floor two level. (10 mm to 12mm tor (TMT Bars).
7Class-150 (Non Modular) brick work in 1:4 cement and Coarse sand mortar in foundation and plinth including supply of all material, labor T&P etc. required for proper completion of work. (S.No. 6.1.1)
812mm thick cement plaster in single coat of fair side of single of half brick wall forinterior plastering up to floor two level including internal rounded angles chamfers and rounded angles not excluding 80mm in girth and finished even and smooth. No extra for mixing any additive. (c) 1 cement : 4 Coarse sand. (Chapter No. 13 S.I. No.-582(ii))
9Providing and laying cement concrete in 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) and curing complete, including cost of form work in foundation and floors. (DSR SN-4.1.3)
10Mild Steel or iron in Heavy Size such as reinforced concrete or reinforced brick work (When not included in and an overall rates) brought to required shape as necessary including bending for proper completion of the work and including supply of steel, its wastage bend hooks and authorized over lapping shall be measured up to floor two level. (10 mm to 12mm tor (TMT Bars).
11Supply/Fixing of Black Granite Stone work display board. (NS)
12Sub Total (A)
13Add 12% G.S.T. of Sub Total (A)
14Sub Total (B)
15Add/Deduction Rs. For Estimate Figure Amount Match
16Grand Total
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail