Medium Voltage ( 415 V ) Switchboard ( Pcc / Pmcc / Mcc / Emcc-Drawout ) Medium Voltage ( 415 V ) Switchboard ( Pcc / Pmcc / Mcc / Emcc-Drawout ) , Design, Engineering, Manufacturing, Supply, Painting, Assembly, Inspection And Testing ( Tpi Including Appointment Of Third Party Agency ) , Packing, Transport At Site Including Commissioning Spares, Mandatory Spares, Tools & Tackles As Required, Supervision Of Installation, Testing And Commissioning, Documentation And Providing Guarantee For Medium Voltage ( 415 V ) Switchboard ( Drawout ) Located At Dumad Refinery. Scope Shall Be In Accordance With The Requirements Stated In This Requisition, Specification, Industry Codes & Standard And Local Rules & Regulations As Applicable And All The Attached Documents Enclosed As Annexure / Attachments. , 415 V, 3200 A, 65 Ka ( Rms ) Symmetrical For 1 Sec., 3Ph., 4 Wire, 50 Hz, Metal Enclosed, Floor Mounted, Free Standing With Integral Base Frame, Single Front, Indoor Type Switchgear Compartmentalized ( Form 4B ) , Degree Of Protection – Ip42, Iac-Aflr ( Iec / Tr - Iec 61641 ) , Incoming And Outgoing Feeders As Per Attached Protection And Metering Single Line Diagram ( Dwg No. 44Ac9100-000 / E.01 / 0006 / A0 ) , Specifications And Data Sheet. , 415 V, 2500 A, 65 Ka ( Rms ) Symmetrical For 1 Sec., 3Ph., 4 Wire, 50 Hz, Metal Enclosed, Floor Mounted, Free Standing With Integral Base Frame, Single Front, Indoor Type Switchgear Compartmentalized ( Form 4B ) , Degree Of Protection – Ip42, Iac-Aflr ( Iec / Tr - Iec 61641 ) , Incoming And Outgoing Feeders As Per Attached Protection And Metering Single Line Diagram ( Dwg No. 44Ac9100-000 / E.01 / 0006 / A0 ) , Specifications And Data Sheet. , 415 V, 630 A, 50 Ka ( Rms ) Symmetrical For 1 Sec., 3Ph., 4 Wire, 50 Hz, Metal Enclosed, Floor Mounted, Free Standing With Integral Base Frame, Double Front, Intelligent Design, Indoor Type Switchgear Compartmentalized ( Form 4B ) , Degree Of Protection – Ip42, Iac-Aflr ( Iec / Tr - Iec 61641 ) , Incoming And Outgoing Feeders As Per Attached Protection And Metering Single Line Diagram ( Dwg No. 44Ac9100-000 / E.01 / 0007 / A0 ) , Specifications And Data Sheet. , Design, Engineering, Manufacturing, Supply, Painting, Assembly, Inspection And Testing ( Tpi Including Appointment Of Third Party Agency ) , Packing, Transport At Site Including Commissioning Spares, Mandatory Spares, Tools & Tackles As Required, Supervision Of Installation, Testing And Commissioning, Documentation And Providing Guarantee For Medium Voltage ( 415 V ) Switchboard ( Drawout ) Located At Jr Refinery. Scope Shall Be In Accordance With The Requirements Stated In This Requisition, Specification, Industry Codes & Standard And Local Rules & Regulations As Applicable And All The Attached Documents Enclosed As Annexure / Attachments. , 415 V, 1250 A, 50 Ka ( Rms ) Symmetrical For 1 Sec., 3Ph., 4 Wire, 50 Hz, Metal Enclosed, Floor Mounted, Free Standing With Integral Base Frame, Single Front For Acb Feeders And Double Front For Sfu / Mccb Feeders, Indoor Type Switchgear Compartmentalized ( Form 4B ) , Degree Of Protection – Ip42, Iac-Aflr ( Iec / Tr - Iec 61641 ) , Incoming And Outgoing Feeders As Per Attached Protection And Metering Single Line Diagram ( Dwg No. 44Ac9100- 000 / E.01 / 0006 / A0 ) , Specifications And Data Sheet. , Supervision Of Installation, Testing And Commissioning Of 415 V Switchboard ( Each Switchboard 8 Days ) At Dumad / Jr. Refinery For Tag No. 900-Pmcc-01, 900-Epmcc-01, 902-Pmcc-01, 902-Epmcc-01, 934-Pmcc-01, 934-Epmcc-01, 900-Mcc-01, 900-Emcc-01, 902-Mcc-01, 902-Emcc-01, 934-Emcc-01, 1011-Pmcc-01 Total 96 Mandays Estimated For Site Supervision Of Installation, Testing And Commissioning. , Supervision Of Installation, Testing And Commissioning Of Ldb & Asb ( Each Board 10 Days ) At Iocl Dumad And Jr Refinery , Overtime Rate / Hour Beyond Normal 8 Hours Work On Normal Working Days. , Overtime Rate / Hour For Work On Weekly Off Days / Holidays ( As Applicable To Refinery Site ) .