Hindustan Shipyard Limited has published Overhauling Of Main Engine Monitoring System On Dci Dr Xi . Submission Date for this Tender is 29-09-2021. Commercial Marine Vehicle Tenders in HSL Visakhapatnam Andhra Pradesh. Bidders can get complete Tender details and download the document.
Sr No | CorrigendumDate | Corrignedum | CorrigendumType | NewSubmissionDate |
1 | 22-Sep-2021 | Due date extension | Date | 24-09-2021 |
2 | 24-Sep-2021 | Due date extension second time | Date | 27-09-2021 |
3 | 27-Sep-2021 | Extension of Overhauling of Main Engine Monitoring System on DCI DR XI | Date | 29-09-2021 |
Sl. No. | Item Description |
1 | Both Main Engine Monitoring System |
2 | Both Main Engines Local and Remote Panels all the sensors, transmitters, local indicators, internal wiring and remote indicators to be checked thourghlyand each cables / terminals to be marked at the termination ends. Any defects, if observed to be rectified and alram and shut down sensors are to be set as per the original set values. Calibraton to be done for complete loop and certificates to be issued for all alarms and shut down phenomena. While checking all alarms must shown to ship staffs for satisfactory trails. |
3 | Consumables / Components / Items / Spares / Material: For executing of the above mentioned job, Contractor has to procure, supply all items and fitted in its place. Contractor has to quote lumpsum cost for required Consumables / Components / Items / Spares / Material mentioned at Sl.No.1.1 for above scope of work. The taxes will be paid as per actuals. The cost of spares quoted by the contractor will be considered " on not exceeding basis of total lumpsum cost mentioned in the BOQ for this line item"" for satisfactory completion of the specified SoW. Payment will be made at actuals on not exceeding quoted cost of this Sl. No. 1.2 against third party/OEM invoice. |
4 | PNEUMATIC SYSTEM:-(IHC) |
5 | Both M/E Local and Remote control Panel air starting system valves in starting station and CPP control system in pneumatic panel to be overhauled/ renewed as found necessary. And satisfactory operational trial and sea trials to be showed to SS. |
6 | Consumables / Components / Items / Spares / Material: For executing of the above mentioned job, Contractor has to procure, supply all items and fitted in its place. Contractor has to quote lumpsum cost for required Consumables / Components / Items / Spares / Material mentioned at Sl.No.2.1 for above scope of work. The taxes will be paid as per actuals. The cost of spares quoted by the contractor will be considered " on not exceeding basis of total lumpsum cost mentioned in the BOQ for this line item"" for satisfactory completion of the specified SoW. Payment will be made at actuals on not exceeding quoted cost of this Sl. No. 2.2 against third party/OEM invoice. |