}

Repairs And Periodical Maintenance Of Certain Package Type Ac Plants And Cold Storage Plants At Afa Hyderabad Repairs And Periodical Maintenance Of Certain Package Type Ac Plants And Cold Storage Plants At Afa Hyderabad, GE AFA HYDERABAD-Telangana

Military Engineer Services-MES has published Repairs And Periodical Maintenance Of Certain Package Type Ac Plants And Cold Storage Plants At Afa Hyderabad Repairs And Periodical Maintenance Of Certain Package Type Ac Plants And Cold Storage Plants At Afa Hyderabad. Submission Date for this Tender is 13-10-2021. HVAC Tenders in GE AFA HYDERABAD Telangana. Bidders can get complete Tender details and download the document.




Tender Notice

29222363
Corrigendum : Repairs And Periodical Maintenance Of Certain Package Type Ac Plants And Cold Storage Plants At Afa Hyderabad Repairs And Periodical Maintenance Of Certain Package Type Ac Plants And Cold Storage Plants At Afa Hyderabad
Open Tender
Indian
Telangana
GE AFA HYDERABAD
13-10-2021

Tender Details

Repairs And Periodical Maintenance Of Certain Package Type Ac Plants And Cold Storage Plants At Afa Hyderabad Repairs And Periodical Maintenance Of Certain Package Type Ac Plants And Cold Storage Plants At Afa Hyderabad

Corrigendum Details

Sr No CorrigendumDate Corrignedum CorrigendumType NewSubmissionDate
1 06-Oct-2021 Bid Auto Extn Corrigendum Bid Auto Extn Corrigendum 13-10-2021

Key Value

Document Fees
INR 500 /-
EMD
INR 50000.0 /-
Tender Value
INR 24.80 Lakhs /-

BOQ Items

Name of Work:- REPAIRS AND PERIODICAL MAINTENANCE OF CERTAIN PACKAGE TYPE AC PLANTS AND COLD STORAGE PLANTS AT AFA HYDERABAD
Sl. No. Item Description
1M&L for servicing of compressor unit with blower unit (Package Type AC plant and servicing whole chamber, blowing out the dust, rectifying the minor problems, checking of interlock of safety/ control device, checking of all electrical connections in unit, refrigerant pipe lines, renewal of all corroded sheet metal screws, servicing of blowers, cleaning of evaporator coils washing with chemicalswith forced feed method to remove the dust from the coil and filters, greasing the blower fan bearings, alignment of the blower and shaft, adjustment of the "V" belts tension, tightening the nuts bolts, including replacement of damage trucking canvas with zip as per old of the following capacities of Package type AC plants complete all as specified and as directed . Note:- Small repair work related to servicing part (if any) shall be included in the scope. No extra payment shall be admissible for that account.
2(a) Set of 1 x 5.5 TR Capacity
3(b) Set of 2 x 5.5 TR Capacity
4(c) Set of 3 x 5.5 TR Capacity
5(d) Set of 2 x 8.75 TR Capacity
6(e) Set of 3 x 8.75 TR Capacity
7(f) Set of 3 x 11.0 TR Capacity
8((g) Set of 1 x 10.0 HP & 2 x 20 HP Capacity(24 TR)
9M&L for complete servicing the condensing unit (Package Air conditioning unit), with and including dismantling the condensing units sheet metal body, blowing out the dust, spraying the organic based scale removing agent at the appropriate ratio to the condenser fan area, till removal of complete scales & dust, flushing through for proper air flow across the coil, checking of all electrical connections, greasing of motor bearing, renewal of all corroded sheet metal screws, applying synthetic enamel paint over a coat of primer on the rusted portion in inner body, reassembling the sheet metal parts, and testing the unit all as specified and as directed. Note:- Small repair work related to servicing part (if any) shall be included in the scope. No extra payment shall be admissible for that account.
10(a) Set of 1 x 5.5 TR Capacity
11(b) Set of 2 x 5.5 TR Capacity
12(c) Set of 3 x 5.5 TR Capacity
13(d) Set of 2 x 8.75 TR Capacity
14(e) Set of 3 x 8.75 TR Capacity
15(f) Set of 3 x 11.0 TR Capacity
16(g) Set of 1 x 10.0 HP & 2 x 20 HP Capacity(24 TR)
17M&L for leak testing of the total refrigerant system ofPackage type AC plants by pumping down the refrigerant to cylinder, flushing out the entire system arrest all leakages by replacing the damaged flare nuts, taflon washers, brazing, gaskets, o rings etc and leak test by supply and charging with Nitrogen gas ( N-2)under constant pressure of 250 - 300 PSI , watching the pressure for 24 Hrs for confirmation, flushing out the system vacuumising and charge the required qty of refrigerant and lubricant testing and commissioning the system all as directed for the following capacity of plants (Note: Refrigerant & compressor oil shall be measured and paid separately under respective items)
18(a) Set of 1 x 5.5 TR Capacity
19(b) Set of 2 x 5.5 TR Capacity
20(c) Set of 3 x 5.5 TR Capacity
21(d) Set of 2 x 8.75 TR Capacity
22(e) Set of 3 x 8.75 TR Capacity
23(f) Set of 3 x 11.0 TR Capacity
24(g) Set of 1 x 10.0 HP & 2 x 20 HP Capacity(24 TR)
25M&L for taking down unserviceable hermetically sealed compressor after disconnecting the suction/delivery lines and Supply & fixing hermetically sealed compressorof following capacities as per existing make, model & specification, including pressure testing, vacuumising and charging of refrigerant,testing and commissioning all as directed Make :- Copeland/Danfoss/kirloskar/Blue star/Voltas (As per site requirement)Note:Refrigerant will be measured and paid separately
26(a) 5.5 TR Capacity
27(b) 8.75 TR Capacity
28(c) 11.0 TR Capacity
29Taking down unserviceable liquid line filter drier and S&F liquid line filter drier as per existing make & specification and suitable size to fixing with existing refrigerant line for5.5 TRto 8.75 TR capacity compressor of AC Plant, all as specified and directed by the Engr-in-charge
30Taking down unserviceable liquid line filter drier and S&F liquid line filter drier as per existing make & specification and suitable size to fixing with existing refrigerant line for11 TR capacity compressor of AC Plant, all as specified and directed by the Engr-in-charge
31Removing the worn-out unserviceable blower motor following capcity of AC Plant from the position after disconnecting the electrical connections and transporting to the work shop and opening the end covers, removing the unserviceablewinding, clean the slots with CTC, rewind the motor by super enameled copper winding wire of suitablegauge and size with insulating paper, insulating varnish and drying for obtaining requisite insulation values complete with necessary PVC sleeves, lead wire, new terminal block complete and bring back and install in position including testing and commissioning complete all as specified and as directed
32(a) Upto 3 HP capacity
33(b) 5 HP to 7.5 HP capacity
34Taking down unserviceable blower motorV-belt and S&F blower motorV-belt as per existing same Model & specification and suitable size to fixing with existing system for5.5 TR/ 8.75/ 11 TR capacityPackage unit, all as specified and directed by the Engr-in-charge. Make:- FENNER/DUNLOP/NIRLON
35M&L for Repair / Servicing microprocessor based control panel with display including replacing wornout u/s single/three phase controllers, contractors, fuse, internal wiring as per existing same model & specification and suitable size to Package unit of AC Plant, complete all as specified and as directed .
36S&F in replacement microprocessor based control panel alongwith single phase controllers, contractors and LED display as per existing same model & specification, controlling for condensing unit, compressor unit & blower of following units to Package type AC plant, all as specified and as directed. Make:- Voltas / Bluestar / LG
37(a) 5.5 TR Package Unit
38(b) 8.75 TR Package Unit
39(c) 11.0 TR Package Unit
40(d) Cold Storage 15000 BTU, (+ / -10°C) capacity
41M&L thermal insulation with aluminium faced nitrile rubber 12 mm thick for duct/blower unit as per existing density and thermal conductivity including packing material for the 5.5 TR to 3 x 11TR capacities of Package type AC plants complete all as specified and directed by EIC. Make:- Armaflex / Aeroflex / Thermobreak
42M&L fornitrile rubber tubular insulation for copper tubing as per existing density and thermal conductivity including packing material, aluminium sheet cover and PVC tie for the 5.5 TR to 3 x 11TR capacities of Package type AC plants complete all as specified and as directed . Make:- Armaflex / Aeroflex / Thermobreak
43Removingthe chocked unserviceable copper refrigerant tubingand S&F copper refrigerant tubing for the following sizes (outer dia) including suitable joints / branch connectors and distributers with flare nuts/brazing for indoor & outdoor units as required at site complete all as specified and as directed.
44(a)6.4 mm to12.7 mm
45(b) 15.9 mm to 22.2 mm
46(c) 25.4 mm to 28.6 mm
47M&L for rigid PVC conduit (medium grade) size 32 mm diafor water drain out line for Package type AC plant, laid on walls, ceiling, in floors with clamping / fixing materialscomplete all as specified and as directed.
48Description All as per Seritem 14 above but size 40 mmdia complete all as specified and as directed.
49M&L for preparation of surfaces by scrapping and removing rusted portion with wire brusesh and applying one coat of Red oxide primer and two coats of synthetic enamel paint by spray method of the following capacities Package type AC Plant complete all as specified and directed :-
50(a) Set of 1 x 5.5 TR Capacity
51(b) Set of 2 x 5.5 TR Capacity
52(c) Set of 3 x 5.5 TR Capacity
53(d) Set of 2 x 8.75 TR Capacity
54(e) Set of 3 x 8.75 TR Capacity
55(f) Set of 3 x 11.0 TR Capacity
56(g) Cold storage plant only outdoor unit(04 Nos, 15000 BTU to 20000 BTU cap)
57(h) Cold storage plant only outdoor unit(02 Nos, 2HP cap)
58Removing the unserviceable thermostat switch and S&F thermostat switch of range -5 to +25 degree centigrade of following capacity 5.5 to 11 TR all as directed by the Engr-in-charge
59Removing the unserviceable thermostat expansion valve from the evaporating unit and S&F thermostatexpansion valve of following capacities including cutting and brazing complete all as specified and directed by Engr-in-charge.
60(a) 5.5 TR Capacity
61(b) 8.75 TR Capacity
62(c) 11.0 TR Capacity
63M&L for repairing the Cold Storage Room PVC wall and ceiling by replacing unserviceablePVC insulated panels made up of expanded polyesterene (EPS) stuck to 2.0 mm thick PVC sheet with PVC strip / aluminium frame and repairing insulated door, by replacing door beading, repair to door lock etc. complete all as required at site and as directed by Engr-in-Charge.
64M&L for servicing / overhauling to complete indoor/outdoor (Cold Storage plant) labour only for overhauling and servicing whole chamber, blowing out the dust, rectifying the problems, checking of interlock of safety/ control device, checking of all electrical connections in unit, refrigerant pipe lines, renewal of all corroded sheet metal screws, servicing of blowers, cleaning of evaporator coils washing with chemicalswith forced feed method to remove the dust from the coil and filters, greasing the fan including leak testing of the total refrigerant system ofplants by pumping down the refrigerant to cylinder, flushing out the entire system arresting all leakages by replacing the damaged flare nuts, taflon washers, brazing, gaskets, o rings etc and leak test by supply and charging with Nitrogen gas ( N-2)under constant pressure of 250 - 300 PSI , watch the pressure for 24 Hrs for confirmation tightening the nuts bolts,of the following capacities of Cold Storage Plant plants at FCM & Airmen Mess complete all as specified and directed by EIC.
65(a) Cold Storage 15000 BTU, (+10°C) capacity (Room No 1 & 3)
66(b) Cold Storage 15000 BTU, (-10°C) capacity (Room No 2)
67(c) Cold Storage 20000 BTU, (+10°C) capacity (Room No 4)
68(d) Cold storage 2 x 2 HP ( Eva -23.3°C to -28.0°C)capacity
69Note for item No. 20 above:- Servicing shall have to be carried out in an interval of every six months( Atleast2 times during the currency of the work)
70Supply and top up Compressor oil of suitable grade in the refrigeration compressor to the requisite level complete all as directed Make:-Freezol / Servo Freeze
71Supply and filling / topping up / charging of Refrigerent gas R-22 for Central / Package type AC Plants complete all as specified and asdirected.
72Supply and filling / topping up/ charging of Refrigerent gas R-407for Central / Package type AC Plants complete all as specified and asdirected.
73Supply and filling / topping up/ charging of Refrigerent gas R-404 A for Central/Package type ACs complete all as specified and asdirected.
74Supply and filling / topping up/ charging of Refrigerent gas R-410 for Central/Package type ACs complete all as specified and asdirected.
75Dismantling and taking down existing unserviceable submain wiring from batten / conduit of any size and making good to disturbed surfaces to match the existing surfaces complete all as specified and asdirected.
76M&L for submain wiring with 4 X 10.0 Sqmm+ 2 x 6Sqmm earth Wire single core PVC insulated FRLS sheathed cooper cableconnecting to common earth dolly in and including heavy duty PVC casing caping/conduit pipe as per direction , all accessories complete all as specified and asdirected. Note:- 6 runs ofcopper wire and 1 run of casing caping / conduit pipe shall be measured as one unit length.
77M&L for submain wiring with 4 X16.0 Sqmm + 2 x 10.0 Sqmm earth Wire single core PVC insulated FRLS sheathed cooper cableconnecting to common earth dolly in and including heavy duty PVC conduit pipe as per direction , all accessories complete all as specified and asdirected. Note:- 6 runs ofcopper wire and 1 run of conduit pipe shall be measured as one unit length.
78S&F Distribution board 4 way TPN verticaltype Double Door duly fitted with Bus Bars, Neutral Links suitable for415V, 50Hz, Blanking Plates, Suitable for FP MCCBs as incomer (MCCB to be measured and paid separatly), including taking down old complete all as specified and asdirected.
79S&F CRCA Sheet metal enclouser with provision to mount MCB/Isolator/RCCB etc, suitable for use on 415 V, 50 Hz supply, metal door IP 20, 4 way for 4 Nos modulesincluding taking down old complete all as specified and asdirected.
80MCCB 100 Amps ,415 volt ,35 kA Breaking capacity, fixed magnetic & adjustable thermal setting 4 pole incl all termnials, fitting etc complete all as specified and asdirected.
81S&F MCB TPN 32 to 40 Amps 415Vincl all termnials, fittings etc. complete all as specified and asdirected.
82S&F MCB Changeover two way centre off switchFP, 40 Amps 415Vincl all termnials, fittings etc complete all as specified and asdirected.
83S&F in replacement for the following unserviceable spare parts for Package type AC plants of any make & model complete all as specified and asdirected for the following :-
84(a) Contactor rated currentAC 3, 9 Amps, coil voltage 230 V AC, 50Hz, capacity as per existing specification.
85(b) Contactor rated currentAC 3, 18 Amps, coil voltage 415 volts AC, 50Hz, capacity as per existing specification
86(c) Contactor rated currentAC 3, 25 Amps, coil voltage 415 volts AC, 50Hz, capacity as per existing specification
87(d) Relay switch of range 4 to 6.5 Amps
88(e) Relay switch of range 6 to 10 Amps
89(f) Relay switch of range 9 to 14 Amps
90(g) Relayswitch of range 13 to 21 Amps
91(h) LED Indicator lamps of colors R / Y/B
92(j) HRC fuse2.5 to 10 Amps
93(k) HRC fuse 16 to 32 Amps
94Demolition & dismantling Cement concrete platform on floor of any description and in any position not otherwise specifically provided complete all as specified and asdirected.
95M&L for Preparation ofsteel surface of any description over 10 cm width or girth andpainting of two coatsof synthetic enamel paint over one coat of red oxide primer for metal surface of panels, cable duct cover, shutters of sub stn & any surface area etc complete all as specified and asdirected.
96M&L for PCC 1:2:4 type B-1mix using 20 mm graded stone aggregate as in platform, filling and mass concrete, for plant foundation all as specified, including necessary form work and applying two coats of white wash to exposed surface of coping / platform complete all as specified and asdirected.
97M&L for rendering 10 mm thick on brick / concrete / block masonery surfaces in Cm (1:6) and rendering is to befinished faircomplete all as specified and asdirected.
98S&F Display sheet of size 100 mm heightt x 150 mm width for mentioning details of plants on 3 mm thick hylium / PVC sheet duly fixed on wall inside the installation plantincluding writing the details of AC plant and DG Set complete all as specified and directed by Engineer-in-Charge. Note : AC plant details may be collected from concerned In charge complete all as specified and asdirected.
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail