Mw ( Sr ) Restoration And Conservation Works To North-West Side Of Stone Fort Wall Surface At Warangal Fort, Warangal - Execution Of Work Removal Of Thick Jungle / Loose Soil, Construction Of Stone Masonry Platform Wall, Laying Of Lime Surkhi Brick J, Warangal Fort, Warangal, Telangana-Telangana

Archaeological Survey Of India -ASI has published Mw ( Sr ) Restoration And Conservation Works To North-West Side Of Stone Fort Wall Surface At Warangal Fort, Warangal - Execution Of Work Removal Of Thick Jungle / Loose Soil, Construction Of Stone Masonry Platform Wall, Laying Of Lime Surkhi Brick J. Submission Date for this Tender is 06-10-2021. Masonary Work Tenders in Warangal Fort, Warangal, Telangana Telangana. Bidders can get complete Tender details and download the document.




Tender Notice

29218623
Mw ( Sr ) Restoration And Conservation Works To North-West Side Of Stone Fort Wall Surface At Warangal Fort, Warangal - Execution Of Work Removal Of Thick Jungle / Loose Soil, Construction Of Stone Masonry Platform Wall, Laying Of Lime Surkhi Brick J
Open Tender
Indian
Telangana
Warangal Fort, Warangal, Telangana
06-10-2021

Tender Details

Mw ( Sr ) Restoration And Conservation Works To North-West Side Of Stone Fort Wall Surface At Warangal Fort, Warangal - Execution Of Work Removal Of Thick Jungle / Loose Soil, Construction Of Stone Masonry Platform Wall, Laying Of Lime Surkhi Brick Jelly Concrete, Strengthening Of Merlons, Resetting The Steps, Pointing Etc. All Complete As Per Rfp, Instructions And Directions Of Asi Dept

Key Value

Document Fees
Refer document
EMD
INR 217301.0 /-
Tender Value
INR 86.92 Lakhs /-

BOQ Items

Name of Work: < MW (SR) Restoration and Conservation works to North-West side of Stone Fort Wall Surface at Warangal Fort, Warangal – Execution of work >
Sl. No. Item Description
1Name of the Monument / Site: Warangal Fort, Warangal, Telangana
2Removal of very thick jungle / thorny bushes from the surfaces of Bastions, Fort wall, Rampart area, Rampart platform, backside of fort wall and open area in front of steps including disposing waste away from town, cost of scaffolding, material charges, labour charges, loading & unloading charges, necessary applicable taxes, etc. all complete as per the instructions and directions of the ASI Department Officials / Site-Incharge. (Quantity may vary as per the site condition)
3Removing excess loose soil / accumulated debris of average thickness 20 cm including disposing waste away from town, cost of scaffolding, material charges, labour charges,loading & unloading charges, necessary applicable taxes, etc. all complete as per the instructions and directions of the ASI Department Officials / Site-Incharge. (Quantity may vary as per the site condition)
4Construction of cut stone masonry platform wall with new matching stones of 0.60 x 0.30 x 0.30m size in Lime Surkhi Mortar (1:1:1) to prevent further soil erosion including material charges, labour charges,loading & unloading charges, conveyance charges, water & seignorage charges, necessary applicable taxes, etc. all complete as per the instructions and directions of the ASI Department Officials / Site-Incharge. (Quantity may vary as per the site condition)
5Filling of River sand and watering for consolidation for providing incompressible cushion below flooring to avoid shrinkage and swelling effects of Black Cotton soil including material charges, labour charges, water & spreading charges, seignorage charges, necessary applicable taxes, etc. all complete as per the instructions and directions of the ASI Department Officials / Site-Incharge. (Quantity may vary as per the site condition)
6Laying of Lime Surkhi Brick Jelly of nominal size 20mm Concrete 1:1:1 over sand cession to provide hard and level surface as base course and also to prevent the growth of jungle / thorny bushes including material charges, labour charges, necessary applicable taxes, etc. all complete as per the instructions and directions of the ASI Department Officials / Site-Incharge. (Quantity may vary as per the site condition)
7Conserving and Strengthening the existing merlons / platform wall with CR Stones of 0.40 to 0.50 x 0.25 to 0.35 x 0.25 to 0.35m sizes and Lime Surkhi Mortar (1:1:1)including material charges, scaffolding charges, labour charges, loading & unloading charges, water & seignorage charges, necessary applicable taxes, etc. all complete as per the instructions and directions of the ASI Department Officials / Site-Incharge. (Quantity may vary as per the site condition)
8Documentation of bulged out / misaligned steps including material charges, labour charges, necessary applicable taxes, etc. all complete as per the instructions and directions of the ASI Department Officials / Site-Incharge. (Quantity may vary as per the site condition)
9Careful removal of documented disturbed stone step members after taking all precautionary measures etc. to avoid any sort of damage to the members including labour charges, machinery charge, conveyance charges, loading & unloading charges, necessary applicable taxes,etc. all complete as per the instructions and directions of the ASI Department Officials / Site-Incharge. (Quantity may vary as per the site condition)
10Removing loose soil of average thickness 10 cm and disposing away from town below the steps including labour charges, material charges, necessary applicabletaxes,etc. all complete as per the instructions and directions of the ASI Department Officials / Site-Incharge. (Quantity may vary as per the site condition)
11Providing Plain Brick Jelly 20mm size Lime Concrete (1:1:1) as bed concrete on prepared surface for strengthening the base for steps including labour charges, material charges, conveyance & curing charges, necessary applicabletaxes,etc. all complete as per the instructions and directions of the ASI Department Officials / Site-Incharge. (Quantity may vary as per the site condition)
12Cost and Supply of new undressed for stone steps of size (Average length: 1.20m, Avrg. Breadth: 0.50m and Avrg. Thickness: 0.30m) in place of missing stepsincluding labour charges, material charges, loading & unloading charges, conveyance & seignorage charges, necessary applicabletaxes,etc. all complete as per the instructions and directions of the ASI Department Officials / Site-Incharge. (Quantity may vary as per the site condition)
13Three Line Dressing and Chiselling of new stone members for resetting of steps of fort wallsteps including labour charges, material & tools charges, loading & unloading charges, conveyance charges, necessary applicabletaxes,etc. all complete as per the instructions and directions of the ASI Department Officials / Site-Incharge.(Quantity may vary as per the site condition)
14Resetting / Fixing the steps of average thickness 30 cm in position after carving the rough stones / removed stone steps using proper arrangements for lifting including labour charges, material & tools charges, loading & unloading charges, conveyance charges, necessary applicabletaxes,etc. all complete as per the instructions and directions of the ASI Department Officials / Site-Incharge. (Quantity may vary as per the site condition)
15Pointing to the steps and fort wall, bastion surfaces etc. in Lime Surkhi Mortar (1:1:1)including labour charges, material & tools charges, loading & unloading charges, watering & curing charges, conveyance charges, necessary applicabletaxes,etc. all complete as per the instructions and directions of the ASI Department Officials / Site-Incharge. (Quantity may vary as per the site condition)
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail