}

1.Providing Pole Concreting With Cc 1:2:4. For 9 Mtr Support-650X500x1700mm For Iron Poles. The Further Work Has To Be Taken Up After Proper Curing Of These Concreting. 2.Supply And Shifting Of Rcc / Pcc / Spun Poles, Acsr Conductors, 3 / 4 Pin Gi Cros-Karnataka

Karnataka Power Corporation Limited has published 1.Providing Pole Concreting With Cc 1:2:4. For 9 Mtr Support-650X500x1700mm For Iron Poles. The Further Work Has To Be Taken Up After Proper Curing Of These Concreting. 2.Supply And Shifting Of Rcc / Pcc / Spun Poles, Acsr Conductors, 3 / 4 Pin Gi Cros. Submission Date for this Tender is 11-10-2021. Bolts Tenders in Karnataka. Bidders can get complete Tender details and download the document.




Tender Notice

29205804
1.Providing Pole Concreting With Cc 1:2:4. For 9 Mtr Support-650X500x1700mm For Iron Poles. The Further Work Has To Be Taken Up After Proper Curing Of These Concreting. 2.Supply And Shifting Of Rcc / Pcc / Spun Poles, Acsr Conductors, 3 / 4 Pin Gi Cros
Open Tender
Indian
Karnataka
11-10-2021

Tender Details

1.Providing Pole Concreting With Cc 1:2:4. For 9 Mtr Support-650X500x1700mm For Iron Poles. The Further Work Has To Be Taken Up After Proper Curing Of These Concreting. 2.Supply And Shifting Of Rcc / Pcc / Spun Poles, Acsr Conductors, 3 / 4 Pin Gi Cross Arms With Bolt & Nuts, Strain Insulators, Pin Insulators, Disc Insulators, Line Guards, Gos Double Break 400A, H Frame, Gi L Angles, Eye Hooks / Anchor Clamp / Pole Clamp For Ht Ab Cable, Single Top Supports, Gauy Sets, And All The Materials Required To Complete The Work To Work Spot. 3.Dismantling Of Conductors With Pin Bindings, Jumps At The Poles Wherever Required. Shifting Of All The Released Materials To Kpcl Store. 4.Digging Of Pits For Rcc / Pcc / Spun Poles / Gauys And Erection Of Poles Along With Required Base Concreting ( Only For 11 Mtr Spun Pole ) , Cross Arms, Single Top Supports, Pole Clamps And Gauys. 5.Fixing Of Pin / Strain Insulators. Stringing Of Conductors Including Pin Binding, Winding Jumps And Terminating At Strain Insulators Etc. 6.Releasing Of Existing Old Vertical Gos At 2 Pole Structure Near Jackwell Tc Centre And Shifting It To Kpcl Store. Erection Of 02 No. Of New 400A Double Break Gos To The Existing 2 Pole Structure Along With H-Frame, Gi L Angles With Suitable Gi Clamps / Bolts / Nuts / Washers And Wiring Of Jumps. 7.Releasing Of 11Kv Ab Cable From Tc Centre And Re-Routing It To Existing 2 Pole Structure Near Tc Centre And Connecting It To Newly Erected To Gos With Jumps. 8.Erection Of 01 No. Of New 400A Double Break Gos To The Existing 2 Pole Structure Near Muss Along With H-Frame, Gi L Angles With Suitable Gi Clamps / Bolts / Nuts / Washers And Wiring Of Jumps. 9.Straightening Of Slanted Iron Pole Behind The Hostel And Fixing Of Gauy. 10.Erection Of New Rcc Poles Along With Cross Arms, Gauy, Insulator Near Govt.Hostel, Gerusoppa, And Re-Routing Of Existing Acsr Line From The Both The Corner Poles Close To Hostel. 11.Fixing Guarding Including Fixing Necessary Cross Arm For Existing Ht And Lt Line At Road Crossing At Specified Places. 12.Fixing Of Gauy Set With Break Insulators Making Use Of 7 / 3.15Mm Galvanized Steel Wire With Turn Buckle And Anchoring Arrangement. 13.Straightening Of Slanted Iron Pole Behind Hostel And Adjusting The Sag Of The Conductor. 14.Releasing Of Ab Cable From The Pole Opposite To Hostel To Cable Joint Near Police Check Post. Erection Of New Pcc And Rcc Poles And Re-Routing Of Ab Cable And Laying Through Newly Laid Poles To Cable Joint Near Police Check Post And Connecting. 15.The Contractor Has To Establish The Ht Network In Complete Between Jackwell Tc Centre To 4 Pole Structure And Test Charge The Lines Before Handing Over To Kpcl. 16.It Is The Responsibility Of The Contractor To Store The Supplied The Materials / Equipments Till The Completion Of The Work. It Is The Responsibility Of Contractor To Make Compensation To Public In The Case Of Damages Caused To Public Property While Execution Of The Work. 17.The Contractor Has To Work In Co-Ordination With The Concerned Kpcl Staff For Line Clearance On Line. He Shall Plan And Co-Operate Accordingly While Executing The Works. 18.The Tools And Tackles Required To Execute And Complete The Work Like Chain Pulley / Rope Etc. Has To Be Supplied By Contractor. 19.Technical Specification: The Equipment And Material Offered By The Contractor Shall Comply Relevant Standards. 20.Contractor Has To Take All The Safety Precautions While Executing The Work And To Provide Necessary Safety Equipments And To Ensure Usage By Their Workers Wherever Necessary. He Has To Deploy The Workmen Only After Confirmation Of Line Clearance On Lt Line. The Safety Of The Workmen And Timely Completion Of The Work Is The Responsibility Of The Contractor. 21.The Scope Of Work Covers Any Other Material / Works Whether Included Or Not To Complete The Work Of Strengthening Of 11Kv Ht Acsr Line And Re-Routing Xlpe Aerial Bunched Cable Connected To Jackwell Water Treatment Plant Of Gerusoppa Project. Strengthening Of 11Kv Ht Acsr Line And Re-Routing Xlpe Aerial Bunched ( Ab ) Cable Connected To Jackwell Water Treatment Plant Of Gerusoppa Project

Key Value

Document Fees
INR 500 /-
EMD
Refer document
Tender Value
Refer document
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail