}

Widening And Strengthening Work On Road Ranjeetpura To Osian Via Godu-Bajju-Kolayat-Jhajhu-Jangloo-Panchoo-Kakku-Hansasar-Pachodi ( Sh-87A ) In Km. 16 / 0 To 25 / 0 And Km 81 / 0 To 122 / 0 ( Crif ) 2020-21, Bikaner-Rajasthan

Public Works Department-PWD has published Widening And Strengthening Work On Road Ranjeetpura To Osian Via Godu-Bajju-Kolayat-Jhajhu-Jangloo-Panchoo-Kakku-Hansasar-Pachodi ( Sh-87A ) In Km. 16 / 0 To 25 / 0 And Km 81 / 0 To 122 / 0 ( Crif ) 2020-21. Submission Date for this Tender is 20-09-2021. Road Work Tenders in Bikaner Rajasthan. Bidders can get complete Tender details and download the document.




Tender Notice

28899834
Corrigendum : Widening And Strengthening Work On Road Ranjeetpura To Osian Via Godu-Bajju-Kolayat-Jhajhu-Jangloo-Panchoo-Kakku-Hansasar-Pachodi ( Sh-87A ) In Km. 16 / 0 To 25 / 0 And Km 81 / 0 To 122 / 0 ( Crif ) 2020-21
Open Tender
Indian
Rajasthan
Bikaner
20-09-2021

Tender Details

Widening And Strengthening Work On Road Ranjeetpura To Osian Via Godu-Bajju-Kolayat-Jhajhu-Jangloo-Panchoo-Kakku-Hansasar-Pachodi ( Sh-87A ) In Km. 16 / 0 To 25 / 0 And Km 81 / 0 To 122 / 0 ( Crif ) 2020-21

Corrigendum Details

Sr No CorrigendumDate Corrignedum CorrigendumType NewSubmissionDate
1 26-Aug-2021 Date Extended Date 20-09-2021
2 01-Sep-2021 Performance Security and RPWA-100 Technical Bid 20-09-2021

Key Value

Document Fees
INR 5000 /-
EMD
Refer document
Tender Value
INR 40.11 Crore /-

BOQ Items

Name of Work : Widening & Strengthening work on Road Ranjeetpura to Osian via Godu-Bajju-Kolayat-Jhajhu-Jangloo-Panchoo-Kakku-Hansasar-Pachodi (SH-87A) in Km. 16/0 to 25/0 & Km 81/0 to 122/0 [CRIF] 2020-21
Sl. No. Item Description
1Part A- EARTH WORK
2Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlierand disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per MoRTH Specification Clause 201.By Mechanical Means.In area of thorny jungle
3Excavation for roadwork in soil with hydraulic excavator of0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the embankment location with a lift upto 1.5 m and lead upto 1000 m as per MoRTH Specification Clause 301.3
4Milling of distressed bituminous layer upto 70mm depth in a single pass with suitable milling machine (capable of milling @ 200&300 sqm of area per hr) fitted with loading conveyer of loading the filled material directly on the trucks i/c hauling and stock billing the reclaiming to bring to required specification to reuse with the approval of engineer-in-charge for safe disposal with all leads and lifts complete in all respect as directly by Engineer-in-charge. Note: The unutilized quality of reclaimed bituminous mix material shall be recovered.
5Construction of embankment with approved materials deposited at site obtained from roadway cutting and excavation from drain and foundation or other structures graded and compacted to meet requirement of Tables 300-1 and 300-2 as per MoRTH Specification Clause 305.3
6Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 50 m as per MoRD Specification Clause 301.5 with add. avg. lead upto 500 m
7PART- B WMM WORK
8Construction of granular sub-base by providing well graded material, spreading in uniform layerson prepared surface, mixing by manual mean method at OMC, and compacting with smoothwheelroller to achieve thedesired density, complete as per MoRTH Specification Clause 401. Material. For Grading IIIMaterial
9Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing thematerial with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, layingin uniform layers in sub-base/base course on a well prepared sub-base and compacting with smoothwheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400-12 & 400-13 and MoRTH Specification Clause 406.
10Existing Section in Km 16/0 to 25/0
11In Improvement Section( Km 81/0 to 122/0)
12PART C - BT WORK
13Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base(WBM/WMM) including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per MoRTH Specification Clause 502
14Providing and applying tack coat with Bitumen VG-10using bitumen pressure distributor at the rate of 0.35 to 0.45 kg per sqm on the prepared granular surfaces treated with primer & cleaned with Hydraulic broom as per MoRTH Specification Clause 503 and IRC-16-2008.
15Recovery of material obtained from dismantling of existing bituminous layer has been calculated taking assumption that 80% of the theoretical material will be retrieved. The dismantling material can be used in any other item for the work after modification (bringing it to required specification) after approval from the employer. In case it is not possible to use this material on the work, the agency can take away this material.Bitumen required for reclaimed mix@ 40 per cent
16Bituminous MacadamProviding and laying bituminous macadam with hot mix plant using crushed aggregates ofgrading as per Table 500-7 premixed with bituminous binder, transported to site with all leads laid over a previously prepared surface with paver finisher to the required grade, level and alignment and rolledto achieve the desired compaction as per MoRTH Specification Clause 504.Bitumen (VG-30)
17Providing and laying Bituminous Concrete with 100-120 TPH batch type hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder as per Job Mixper centof mix and filler,transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH Specifications Clause 507 complete in all respects.WithBitumen (VG-30).
18PART D- CC WORK
19Construction of dry lean cement concrete Sub- base over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per table 600-1, cement content not to be less than 150 kg/ cum, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in a batching plant, transported to site, laid with a paver with electronic sensor, compacting with 8-10 tonnes vibratory roller, finishing and curing.
20Construction ofun-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavementof M-35 Grade, thickness as per design, over a prepared sub base, withcement or any other type as per Clause 1501.2.2 of MoRD Specification, coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate 31.5 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design,laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days,using curing compoundand water finishing to lines and grade as per drawingand MoRD Specification Clause 1501 including vaccum dewatering process with all required equipments
21PART E - DRAINAGE WORK
22Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of stone masonry, including disposal of unserviceable material and stacking the serviceable material with all lift and lead of 1000 m as per MoRTH Specification Clause 202.Rubble Stone Masonry in Cement Mortar.
23Earthwork in excavation for foundation of structures upto 3 m depth as per drawing and MoRTH specification Clause 2903 includding setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.
24Providing concrete for plain/ reinforced concrete in open foundations complete as per drawings and MoRTH specifications Clause 1702, 1703, 2102 & 2104 P.C.C grade M 10 Nominal mix 1:3:6
25Stone masonry in cement mortar for substructure complete as per drawing & MoRTH specification Clauses 1402, 1405 & 2200. Random Rubble masonry .In 1:4 cement mortar.
26Providing and laying reinforced cement concrete pipe NP4 for culverts on first class bedding of granularmaterial in single row includingfixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets Clause 2905.1000 mm dia
27Plain/reinforced cement concrete in substructure complete as per drawings and MoRTH specification Clauses 1700 and 2200,For height upto 5 m.P.C.C. grade M 20 .Nominal mix (1:2:4)
28Pointing with cement mortar (1:3) on Stone work as per drawing and MoRTH specification Clauses 1406 and 2200
29Painting two coats including primer coat after filling the surface with synthetic enamel paint in all shades on new, plastered / concrete surfaces as per drawing and MoRTH Specification Clause 801
30PART F - PROTECTION WORK
31Earthwork in excavation for foundation of structures upto 3 m depth as per drawing and MoRTH specification Clause 2903 includding setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.
32Providing, fabricating and lying form work of plastic cells made from reclaimed High Density Polythelene (HDPE) sheets of thickness 0.20mm to about 0.25mm or LDPE sheets of thickness 0.30mm to 0.35mm thickness, 100mm wide heat welded or stitched to form cell at 300mm interval and fixed with iron spikes of about 200mm long to keep the cell walls taut and with nylon threads to prevent collapse of the cell walls during placement of concrete, form work of cells should be so stiched to form a roll of cells of a pavement width 3.75m and has a length of 10m to 20m and successive rolls of cell to be stapled.
33Providing concrete for plain/ reinforced concrete in open foundations complete as per drawings and MoRTH specifications Clause 1702, 1703, 2102 & 2104 - P.C.C grade M 15, Nominal mix (1:2.5:5)
34Laying brick soling layer on prepared sub-grade withIst Class brick on end edging according to lines, graded and cross-section shown on the drawing filling joints with sand and earth, spreading 25 mm thick layer of earth over brick soling, watering and rolliing the same with threewheel road roller 80-100 kN as per MoRTH Specification Clause 408.4.3.
35Brick masonry work in cement mortar in foundation complete excluding pointing and plastering as per drawing and MoRTH specifications Clauses 1300, 2102 & 2104 Brick masonry in 1:4 cement mortar
36Plastering with cement mortar (1:4), 15 mm thick on brickwork in substructure as per MoRTH specification Clauses 1312.4 & 2200
37Plain/reinforced cement concrete in substructure complete as per drawings and MoRTH specification Clauses 1700 and 2200,For height upto 5 m.P.C.C. grade M 20 .Nominal mix (1:2:4)
38PART G - Road Furniture Work and Road Safty
39Providing and erecting direction and place identification retro-\reflectorised sign asper IRC:67 made of encapsulated lens type reflective sheeting vide Clause 801.3.1, fixed over aluminium sheeting, 2 mm thickwith areaexceeding 0.9 sqm supported on mild steel angle iron posts 75 mm x 75 mm x 6 mm, 2 Nos.firmly fixed to the ground by means of properly designed foundation with M-15 grade cement concrete 450 mm x 450 mm x 600 mm, 600 mm below ground level as per approved drawing and MoRTH Specification Clause 801.
40Reinforced cement concrete M15grade kilometre stone/local stone of standard design as per IRC:8 fixing in position including painting and printing, etc as per drawing and MoRTH Specification Clause 801
415th Kilometre Stone (precast)
42Ordinary Kilometer Stone (Precast)
43200 m stone (precast)
44Providing and Erecting typical Citizen"s information Board as per approved drawing & specification made of two MS sheet of 1.6 mm thick each of size 900mm x 750mm stiffend by angle iron 25mmx25mm x 3mm all around the plate & plates fixed on frame of 75mm dia pipe of 12 SWG sheet (vertical post 3050 mm with angle holdfasts and horizontal member 900mm) to be joined by embedded in cement concrete M-15 grade of block of 600mmx 600mm x 750 mm size below ground level as per enclosed drawings & as directed by Engineering incharge. All MS will be stove anmeled on both side lettering. Figuring and border will be with ready mixed synthethic enamel paint of superior quality in required shade and colour etc complete in all respect. All sections of framed post and steel tube will be painted with primer and two coat of epoxy paint as per drawing and as per Specification.
45Providing and Erecting typical Citizen"s information Board as per approved drawing & specification made of two MS sheet of 1.6 mm thick each of size 900mm x 750mm stiffend by angle iron 25mmx25mm x 3mm all around the plate & plates fixed on frame of 75mm dia pipe of 12 SWG sheet (vertical post 3050 mm with angle holdfasts and horizontal member 900mm) to be joined by embedded in cement concrete M-15 grade of block of 600mmx 600mm x 750 mm size below ground level as per enclosed drawings & as directed by Engineering incharge. All MS will be stove anmeled on both side lettering. Figuring and border will be with ready mixed synthethic enamel paint of superior quality in required shade and colour etc complete in all respect. All sections of framed post and steel tube will be painted with primer and two coat of epoxy paint as per drawing and as per Specification.
46P & F Delinator with 30 cm. outer dia RCC hume pipe NP-2 (As per IS-458/ 1971 ) pipe 1. OM. Long 40 cm embedded in cement concrete M-10 block of size 50x50x40 cm. including excavation upto 40 cm depth. The inside of pipe shall be filled with C.C. (1:3:6) stone grit max size 20 mm or less upto the top with semi circular humping. The pipes shall be painted white/black with enamel paint with red dots two Nos. on each side
47Marking Centre Line and stop lines etc. on road as per IRC pattern with thermoplastic paint of approved quality and make with 8% glass beads laid on the road surface at temperature 160" C with a special applicator machine complete with a special applicator machine complete with labour material and traffic diversion arrangements..
48Providing and fixing Central Road Fund display board size 180-160 cm made out of 1.6 mm thick MS sheet duly framed with angle iron 65x65x5 mm size having 2 Nos posts 3 m long from ground level and 0.45 m embended in M-15 cement concrete block300x300x600 mm in ground on shoulder of road including painting & lettering as per MoRTH specifications clause 801 with enameled paint complete in all respects.
49Supplying of Cat’s Eye made of aluminium alloy size 75x100x22 mm having 21 biconvex lenses embedded in circular disk of ABS plastic on each side.
50Supply of Chevron sign of size 75x60 cm made out of aluminum sheet 2 mm thick with fixing provision on M.S. angle iron post 50x50x6 mm 3 M long screwed with stainless steel nut bolts of 8 M dia, plate is covered by high intensity grade yellow retro-reflective sheeting and black screen printed arrow on Retro Reflective Sheet, complete in all respect. Comp. in all respect duly post painted in alternate band of Black/White synthetic enamel paint & hold fast at bottom
51Supplying, filling and stitching of empty cement bags either of plastic or jute with earth available at site, of weight not less than 40 Kg., including excavation etc. complete.
52Supply of Swiss type of Hazard marker, made out of 2 mm thick M.S. sheet size of box is 15x15 cm with hold fast at bottom, the body is painted in orange stoving enamel paint with white/high intensity grade micro-prismatic type sheeting, on all four side.
53Supply of Caution Diversion sign board size 1800 x 600 mm having centre height of 75 cm made out or 1.25 mm thick M.S. sheet duly framed with angle iron size 40 x 40 x 5 mm fixed on two moving wheels and stands, made out of 75 x 40 mm channel having two solid rubber wheels mounted on ball bearings, boards is processed in stoving enamel blue and machine cut sheet reflective letter and arrow on one side and the other side having arrow only complete in all respect.
54Supplying of men at work sign board (folding type) made of 1.25 mm thick M.S. sheet size 900x900x900 mm painted in white stove enamelled paint and reflective machine cut sheet Men’s emblem and letter MEN AT WORK in red colours and additional attachment of size 150x900 mm plate for gang number and name with white stoving enameled back ground both plates are fixed on a folding stand of M.S. (heavy) steel tube of size 13.2 mm outer dia as per IS-1239 (part-I) 1979 duly painted in grey colour and both the plates are painted on back side in grey enamel paint.
55Construction of Foundation / Inaugration Pedastal in 23 cm thick Brick masonry in CM 1:4 of size 1.20m x 1.80m above ground level with adequate foundation including providing and fixing of Granite stone of size 0.75m x0.60m with engraving letters and figures,cement plaster,white washing etc. complete as per direction of Engineer in charge.
56Barricading with sal ballies as per design including tying with vertical posts by coconut strings complete in all respect with two horizontal members and vertical supports upto 2.5m centre to centre and for 3 days period including removal and cleaning the site complete in all respect. Height upto 1.2m height above ground levelComplete.
57Earthwork in excavation for foundation of structures upto 3 m depth as per drawing and MoRTH specification Clause 2903 includding setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.
58Supplying, fitting and placing HYSD bar reinforcement in foundation complete as per drawings and MoRTH specifications Clauses 1009,1600 and 2102
59Plain/reinforced cement concrete in substructure complete as per drawings and MoRTH specification Clauses 1700 and 2200,For height upto 5 m. R.C.C grade M 20
60Providing and erecting overhead signs with a corrosion resistant 2mm thick aluminium alloy sheet reflectorised with high intensity retro-reflective sheeting of encapsulated lense type with vertical and lateral clearance given in clause 802.2 and 802.3 and installed as per clause 802.7 over a designed support system of aluminium alloy or galvanised steel trestles and trusses of sections and type as per structural design requirements and approved plans
61Truss and Vertical Support
62Aluminium Alloy Plate for Over Head Sign
63Providing & fixing letters/ borders from reflective tape of approved quality of standard width (Most Specification CI.800) Providing and fixing letters
64Providing and erecting a "W" metal beam crash barrier comprising of 3 mm thick corrugated sheet metal beam rail, 70 cm above road/ground level, fixed on ISMC series channel vertical post, 150 x 75 x 5 mm spaced 2 m centre to centre, 1.8 m high, 1.1 m below ground/road level, all steel parts and fitments to be galvanised by hot dip process, all fittings to conform to IS:1367 and IS:1364, metal beam rail to be fixed on the vertical post with a spacer of channel section 150 x 75 x 5 mm, 330 mm long complete as per clause 810
65PART H - PLANTATION
66Supply & Planting of shady plants ( Neem, Peepal, Goolar, Jamun, Imli or other specified ) along road side including the following activities:- 1. Preparation of soil including cleaning & removing of unwanted shrubs removal of stones & garbage. 2. Supply of plant at site of two years of age & height more than 1.50 Mtr 3. Supply of dry manure ( Farm yard manure organic ) 4. Supply of Insecticides 5. Digging of pits size 60x60x60 cms. Including removal of stones. Manuring application of insecticides & watering at least 15 liter per plant after planting. 6. Half brick Circular tree guard in second class bricks, internal dia 1.25 meter and height 1.20 meter above ground and 0.20 meter below ground, bottom two courses laid dry and top three courses in cement mortar 1:6 (1Cement : 6 Sand) and the intermediate courses being in dry honey comb masonry, as per design complete. 7. Watering to plants. 8.Maintenance of plants by the contractor including of pits/bids preparation of Thavala Hoeing weeding etc. & application of insecticides etc. & security. If the plant die during maintenance contractor has to replace same height plant at his own cost. Note:- SD Shall be refunded after counting of plants on completion of defect liability period of 5 years special condition in this respect shall be kept in contract document
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail