Dakshinanchal Vidyut Vitran Nigam Limited-DVVNL has published the work of Installation 03 phase LT meter on the PTW consumers in the area of Electricity Distribution Division, Shikohabad under the jurisdiction of Electricity Test Division Firozabad. Submission Date for this Tender is 30-12-2021. Power Distribution Work Tenders in FIROZABAD Uttar Pradesh. Bidders can get complete Tender details and download the document.
Sr No | CorrigendumDate | Corrignedum | CorrigendumType | NewSubmissionDate |
1 | 12-Aug-2021 | Extension | Date | 17-08-2021 |
2 | 17-Aug-2021 | Extension1 | Date | 24-08-2021 |
3 | 24-Aug-2021 | Extension2 | Date | 31-08-2021 |
4 | 31-Aug-2021 | Extension3 | Date | 08-09-2021 |
5 | 08-Sep-2021 | Extension4 | Date | 15-09-2021 |
6 | 15-Sep-2021 | Extension5 | Date | 23-09-2021 |
7 | 24-Sep-2021 | Due Date Extended | Admin Corrigendum Date Extend | 26-09-2021 |
8 | 24-Sep-2021 | Extension6 | Date | 29-09-2021 |
9 | 30-Sep-2021 | Extension7 | Date | 10-10-2021 |
10 | 11-Oct-2021 | Extension8 | Date | 18-10-2021 |
11 | 18-Oct-2021 | Extension9 | Date | 26-10-2021 |
12 | 26-Oct-2021 | Extension10 | Date | 08-11-2021 |
13 | 09-Nov-2021 | Extension11 | Date | 16-11-2021 |
14 | 16-Nov-2021 | Extension12 | Date | 23-11-2021 |
15 | 23-Nov-2021 | Extension13 | Date | 30-11-2021 |
16 | 30-Nov-2021 | Extension14 | Date | 09-12-2021 |
17 | 09-Dec-2021 | Extension15 | Date | 20-12-2021 |
18 | 20-Dec-2021 | Extension16 | Date | 30-12-2021 |
Sl. No. | Item Description |
1 | Safe carriage of 03 phase LT meter with box and cable from store centre to work site distance about 0 to 60 kms with loading and unloading at respective ends. |
2 | (A) Installation of 3 phase LT meter of PTW consumers at appropriate outside location and height (at least 5 feet), than connecting the meter with HT/LT distribution network/line and consumer"s cut out/electrical fitting. Work includes proper completion and submission of sealing certificate to the concern supervisory engineer with pre and post work photographs, and entry of meter advise in billing data by providing meter advise report in prescribed M.S. Excel format and conversion of consumers to MU base billing. (B) Review of connections for confirming MU base billing after 10-15 days of meter installation as per billing parameter and providing meter reading in KWH and maximum demand (MD) in M.S. Excel format. Note: Contractor will have to arrange all similar items, such as clamp, nut, bolts, tape, M-seal etc. for the metering work submitting the exel data to AE(M)/EE(test) for making MU bill. |
3 | Laying, fixing and dressing of cable 35/16 mm X 31/2 including fitting of clamps on cable support etc and connect to main supply. (As per required) |