Military Engineer Services-MES has published Periodical Services To Certain Buildings In Zone 1 2 And 3 Under Age ( Br ) I Under Ge ( Nw ) Kunjali Colaba Mumbai Periodical Services To Certain Buildings In Zone 1 2 And 3 Under Age ( Br ) I Under Ge ( Nw ) Kunjali Colaba Mumbai. Submission Date for this Tender is 26-08-2021. Building Work Tenders in GE (NW) Kunjali Maharashtra. Bidders can get complete Tender details and download the document.
Sl. No. | Item Description |
1 | Material and Labourfor Preparation of old plastered or unplastered decorated surfaces of wall including cornices, pillasters etc and applying one coat of white wash on walls complete all as specified and as directed by Engg-In-Charge. |
2 | All as per item No 1 above but in ceiling complete all as specified and as directed by Engg-In-Charge. |
3 | Material and Labour for Preparation of old decorated surfaces of walls by washing rubbing down and stopping of distempered and painted surfaces and applying one coat of oil bound distemper (oil emulsion) on walls complete all as specified and as directed by Engg-In-Charge. |
4 | Material and Labourfor Preparation of old decorated surfaces of ceilings / boards by washing, rubbing down and stopping and applying one coat of oil bound distemper (oil emulsion) on ceilings complete all as specified and as directed by Engg-In-Charge. |
5 | Material and Labour for preparation of old decorated surfaces of walls by washing rubbing down and stopping of distempered and painted surfaces and applying two coat of oil bound distemper (oil emulsion) on walls complete all as specified and as directed by Engg-In-Charge. |
6 | Material and Labour for complete removal of existing treatment on wall surfaces and applying andsanding the surfaces till even and smooth finish and applying one coat of wall primer and finally applying two coats of oil bound distemper of approval tint complete. |
7 | Material and Labour for applying 3mm thick one coat wall care putty on walls / ceilings etc complete all as specified and as directed by Engg-In-Charge. |
8 | Material and Labour for Preparation of old decorated surfaces of wall / ceiling over 10cm width or girth and stopping of painted surface and applying one coat of plastic emulsion paint on walls complete all as specified and as directed by Engg-In-Charge. |
9 | Material and Labour for Preparation of old decorated surfaces of wall / ceiling over 10cm width or girth and stopping of painted surface and applying two coats of plastic emulsion paint on walls complete all as specified and as directed by Engg-In-Charge. |
10 | Material and Labourfor Preparation of old painted wooden surfaces of any description over 10cmwidth or girth and applying one coat of synthetic enamel paint complete all as specified and as directed by Engg-In-Charge. |
11 | Material and Labour for Preparation of old painted steel surfaces of any description not otherwise over 10 cm in width or girth and applying one coat of synthetic enamel paint complete all as specified and as directed by Engg-In-Charge. |
12 | Material and Labour for Preparation of old plastered or unplastered decorated surfaces of wall including cornices, pillasters etc. stopping of distempered / painted and applying one coat of synthetic enamel paint complete all as specified and as directed by Engg-In-Charge. |
13 | Material and Labour for preparation of surfaces of walls, chajjas, parapets of an old surfaces etc. and applying one coat of acrylic exterior paint with and including irrection and dismantling of scaffolding to carrying out works1to 4 storys buildings complete all as specified and as directed by Engg-In-Charge. |
14 | Material and Labour for preparation of surfaces of walls, chajjas, parapets of an old surfaces etc. and applying one coat of acrylic exterior paint with and including irrection and dismantling of scaffolding to carrying out works5to 8 storys buildings complete all as specified and as directed by Engg-In-Charge. |
15 | Material and Labour for preparation of surfaces of walls, chajjas, parapets of an old surfaces applying one coat of wall care putty, 3mm thick etc. and applying two coats of acrylic exterior paint with and including irrection and dismantling of scaffolding to carrying out works 1 to 4 storys buildings complete all as specified and as directed by Engg-In-Charge. |
16 | Material and Labour for preparation of surfaces of walls, chajjas, parapets of an old surfaces etc and applying two coats of acrylic exterior paint with and including irrection and dismantling of scaffolding to carrying out works 5-8 storeys buildings complete all as specified and as directed by Engg-In-Charge. |
17 | Material and Labour for french polishing on surfaces of any description , width or girth including cleaning and preparing the surface including a coat of wood filler and applying one or more coats on old works complete all as specified and as directed by Engg-In-Charge. |
18 | Taking down cement plaster on brick/ surfaces built in cement mortar including raking out joints, bading for key scrubbing down with water etc complete all as specified and as directed by Engg-In-Charge. |
19 | Material and Labour for rendering 15 mm thick in CM 1:6 on fair faces of brick work or concrete surfaces finishing the surface even and smoothwith and including 1 mm thick sagol finish complete all complete all as specified and as directed by Engg-In-Charge. |
20 | Material and Labourfor Preparation of new plastered surfaces of walls and applying two coats of oil bound distemper over a coat of chalk whiting on plastered surfaces incl preparatory to distempering complete all as specified and as directed by Engg-In-Charge. |
21 | Material and Labour for plastering 15mm thick in CM 1:4 with water proofing compound at the rate of 3% by weight of cement and finishing the surface even and fair. (WPC will be measured and paid seperately) complete all as specified and as directed by Engg-In-Charge. |
22 | Material and Labourfor preparation of newly plastered wall surfaces over 10cm girth applying two coats of 100% acrylic weather resistant emlusion over a coat of exterior wall primer complete all as specified and as directed by Engg-In-Charge. |
23 | Removal of tree roots and branches spread over stone wall joints and making good the stone wall joints by flush pointing in CM 1:4 including provision of necessary scaffolding and removing the debris outside MOD land complete all as specified and as directed by Engg-In-Charge. |
24 | Supply only integral water proofing compound complete all as specified and as directed by Engg-In-Charge. |
25 | Material and Labourfor mettalic texture painting on wall/ceiling surfaces, design and pattern as approved complete all as per manufacturers instructions complete all as specified and as directed by Engg-In-Charge.. Make: Royal play of Asian Paint or as approved by GE |
26 | Material and Labourclean plastered surface and remove all lose particles, dirt, vegetation etc. vegetation etc. Define the crack with sharp dge tool then clean and moisten.Providing and applying ready to use acrylic polymeric non - shrink "PAINTEX-4" upto 5mm 12mm wide cracks and finish at all heights, level etc.complete after 24 hours inspect and if requuired as a result of auto-suction, provide another filling over the same complete all as specified and as directed by Engg-In-Charge. |
27 | Material and Labour melamine polishing on old wooden surfaces of any description, width or girth including cleaning and preparing the surface including a coat of wood filler and applying one or more coats with air compressor machine |
28 | Material and labour for gently cleaning the surface of the stone masonry and piers with specialized water misting techniques employing air water jet using a fine nozzle sprinkling system calibrated to spray a fine mist along the stone surface, without over wetting, followed up by gentle brushing with soft nylon brushes as specified. Gentle surface cleaning may include using water misting and mild pH balanced surfactants as specified for indicated areas to remove surface dirt, grit, surface accretions, lime wash etc by means of water misting and pH balanced surfactants and cleaning as directed by Engineer - in- Charge. Note:- Quoted rate shall be inclusive of removing vegetation on wall surfaces, chajjas etc and erection and dismantling of MS tubular double scaffolding up to Five storey building and provision of necessary safety equipments to the skilled workers to carry out work. |
29 | Material and Labour for raking out cement loose/crack pointing or any other hard materials used and careful re-pointing and repair to be carried of the damaged pointing to walls externally and internally above the base of vaults and apse domes for poor joints, in lime mortar 1:3 (1 lime, 3 sand mix to be approved by Consultants before application) and filling in of any holes/damage areas of stone that may have to be filled in lime mortar. Pointing to be carefully colour matched using additives such as kattha, sand, stone dust and such additives to exactly preparation of batches of samples upto 20 samples of colour matched lime mortar for approval by Engr-in-charge. The contractor to ensure use of masking tape and sharp specialized spatula and tools to ensure clear lines and high level of workmanship on site all as specified and directed by Engr-in-Charge. |
30 | Material & labour for application of transperent polyurethene paint over stone masonary as per the manufactures instruction over a coat of primer all as specified & directed . Make :-Asian paint, Berger, Shalimar as approved by GE. Note :- (i)The work is to be carried out in heritage bldg/hall, hence before starting of work all instructions given by Engineer-in-Charge/consultant (if any) are to be strictly followed.Any damage to structure due to negligence of contractor shall be repaired as directed without any extra cost to the entire satisfaction of Engineer-in-Charge/ consultant failing which the same shall be got done through other agency at contractor risk & cost. (ii) Guarantted of PU paint if any to be submitted by the contractor in writing and necessary amount toward retention money to be also retained in this regards. |
31 | Material & labour for plastering in CM 1:4, 20 mm thick in two coats (15 mm under coat plus 5mm finishing coat) with water proofing compound at the rate of 3% by weight of cement and finishing the surface even and fair. (WPC will be measured and paid seperately). |
32 | Material & labour for cleaning the existing cracked surface of wall & Column surface by scrubbing so as to remove all the dust, dirt, grime, oil etc and washing the surface with Jet of water and applying one coat of FUTURA SEALER COAT in CHOWKSEY CHEMICALS (or euivalent in FOSROC, ASIAN, BERGER etc) @ 8-10 SQM , then after 4-5 hours apply two layer of finish coats of FUTURA-5 PLUS in CHOWKSEY CHEMICALS (or euivalent in FOSROC, ASIAN, BERGER etc) @ 4-4.5 SQM/2 coat duly included erection and dismantling of scaffolding upto 9 storey building, complete all as specified and as directed by Engg-In-Charge. Note: Rate should be included with filling the cracks with acrylic polymeric non shrink compound like Paintex-4 in CHOWKSEY CHEMICALS or equivalent in other approved makes. |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail