Madhyanchal Vidut Vitran Nigam Limited has published for the work of load extension from 250 KVA to 350 KVA (HV-2) of M/s Shree Ganga VineersPly BoardPvt. Ltd. , S-10, ParsakheraIndustrial Area , Bareilly andwork of load extension from 30 BHP to 70 HP (58 KVA) LMV-6, of M/s G.K. Hospitality C/o Kunal Dawani. Submission Date for this Tender is 09-08-2021. Electrical Maintenance Tenders in EE EUDD-II BAREILLY Uttar Pradesh. Bidders can get complete Tender details and download the document.
Sl. No. | Item Description |
1 | for the work of load extension from 250 KVA to 350 KVA (HV-2) of M/s Shree Ganga VineersPly BoardPvt. Ltd. , S-10, ParsakheraIndustrial Area , Bareilly under Full deposited fund- 2021-22 under EUDD-II, Bareilly. |
2 | Safe Carriage of materials from Central C.B. Ganj to work site including loading & unloading. a-11 KV XLPE Cable ( 3X70 Sqmm)- 60 Mtr. c-11 KV 3X70 SQMM Cable Jointing Kits O/D- 05 No. e-11 KV Pilfer Metering Cubical Unit 5/5A-01 No. e-other Line materials- 100 Kgs |
3 | Laying of11 KV XLPE Cable (3x70 sqmm.) |
4 | Erection and Fixing 11 KV (3X70 sqmm.)in all respect . |
5 | Erection of11 KV pilfer resistance metering cubical unit in all respect |
6 | Erection ad fixing of CT/PT (20/5A) on Double Pole . |
7 | Earthing of CT/PTunit , D/Pole , and 11 KV pilfer resistance metering cubical upto water level with GI Pipe of 1.5” Dia. Including mild steel strip size 35x6 mm. (Material will be supplied by Contractor). |
8 | for the work of load extension from 30 BHP to 70 HP (58 KVA) LMV-6, of M/s G.K. Hospitality C/o Kunal Dawani S/o Shree Girdhar Lal , Dawani , T-2, Industrial Area , Parsakhera , Bareillyunder Full deposited fund- 2021-22 under EUDD-II, Bareilly |
9 | Safe Carriage of materials from Central C.B. Ganj to work site including loading & unloading. a-ST Pole 11 Mtr. Long – 02 Nos. b-11 KV XLPE Cable ( 3X70 Sqmm)- 25 Mtr. c-ACSR Weasel Conductor- 50 Mtr. d-11 KV 3X70 SQMM Cable Jointing Kits O/D- 05 No. e-11 KV Pilfer Metering Cubical Unit 5/5A-01 No. e-other Line materials- 250 Kgs |
10 | Erection of D / Pole including digging of pit & groutingwork complete and fitting of all accessories complete. |
11 | Erathing of ST Poles. |
12 | Laying of25 mtr. 11 KV XLPE (3X70 sqmm) Cable |
13 | Sagging & Stinging of50mtr. ACSR Weasel Conductor. |
14 | Earthing of CT/PTunit , D/Pole , and 11 KV pilfer resistance metering cubical upto water level with GI Pipe of 1.5” Dia. Including mild steel strip size 35x6 mm. (Material will be supplied by Contractor). |
15 | Erection of 11 KV Pilfer metering Cubical unit. |
16 | Erection of 11 KV Cable Jointing Kits O/D (3X70 sqmm) |
17 | Fixing of associated Items i.e Top Channel-02 No., Dropper Channel-01 No,ST pole Clamp- 16 nos.Etc. |