Public Health Engineering Department-PHED has published Sinking And Commission Of Production Wells 200 Mm X 150 Mm In Different Areas Of Sambalpur Municipal Corporation Under Source Development Sinking And Commission Of Production Wells 200 Mm X 150 Mm In Different Areas Of Sambalpur Municipal Corporation Unde. Submission Date for this Tender is 02-08-2021. Water Wells Tenders in Sambalpur Odisha. Bidders can get complete Tender details and download the document.
Sl. No. | Item Description |
1 | Supplying all materials, labour, T&Pfor drilling a perfectly vertical bore hole of specified diameter for a specified depth below ground level through consolidated andunconsolidated rock with down the hole hammer drilling Rigs or Combination drilling Rigs (1200 cfm/300 psi) as required to suit the site condition as per the direction of Engineer-in-charge including supply of rig with its accessories, tools and plant and consumables etc. for lowering 125 mm dia G.I. / PVC pipe for housing fitted with socket and withor with wellscreenaspernecessity for soft, medium and hard formation (PVC/ G.I casing pipe if required to prevent collapse of over burden is to be provided by the contractor and with drawing after completion of the Tube Well).(Drilling 200 / 150 mm dia bore hole)21nos |
2 | Supplying all materials, labour, T&P for lowering the G.I. / PVC casing pipe of following size with or without slotted pipes as per the necessity from ground level and fitted and fixed up in perfectly vertical position including cutting and threading of pipes and slotted pipes and supplying andfixingall jointingmaterials, tools and plant etc., all complete and keeping the top of casing pipe threaded including plugging the tube well to prevent entry of foreign materials from above as per the direction of Engineer-in-charge.(Lowering of 200 mm dia PVC casing pipes)21nos(excluding cost of Casing pipe) |
3 | Supplying all materials, labour, T&Pfor cleaning and developing the tube well with supply of compressor worked till clear and adequate discharge is obtained from the tube wellincluding supply and use of all necessary equipment, consumable and labour as per direction of Engineer in charge. |
4 | Cost of 200mm ASTM-D-04 Sch-80 PVC Casing Pipe. |
5 | Supplying & fittings 3 PhaseTransformer (Sub Station) 11/.4 KVA including installation with all required materialetc all complete.(Installation with all required material25 KVA) (As per specification of TPWODL ) |
6 | Supplying all materials, labour, T&Pfor 3-phase 25Sqmm AB Cablewith 8.00Mtr long PSC pole 300Kg with 80.00mtr spacing as per direction of Engineer in charge.(As per specification of TPWODL ) |
7 | Suppying installing testing and commissioning of Submersible Pump set withoutcontrol Panel at different locations.(21 nos pump set vary from 1 HP to 5 HP as per yied of Production Well) |
8 | Supplying & Fitting fixing ofStar Delta Control pannel with APFC arrangement for above Motors (21 nossuitable for above pump sets) |
9 | Supplying all materials, labour,T&P and fitting,fixing of Following AMP Main switch threephase in the terminal box with electrical connection work including labour cess etc all complete as per the direction of Engineer-in-charge.(As per requirement for the above pump sets) |
10 | Supplying , fitting & fixing of MS box with frame for fixing of main switch,cable and cut out arrangement including labour cess etc all complete as per the direction of Engineer-in-charge. |
11 | Supplying all materials, labour,T&P and fitting,fixingof 1.21m x 0.76m size out door terminal box with 1.37m long -4nos leg of equal section 40mm x 40mm size angle with necessary C.C. work at the leg with locking arrangement and hole for cable including labour cess etc all complete as per the direction of Engineer-in-charge. |
12 | Supplying all materials,labour,T&P and lowering of 63mm dia HDPE pipe with supply of long S/S nipple both site(10kg/cm²) in to the bore well & labour cessetc all complete as per the direction fo Engineer-in-charge. |
13 | Supplying all materials, labour,T&P and jointing with lowering of following three phase submersible cable with binding the cable to the column pipe at 1.52m interval including labour cess etc all complete as per the direction of Engineer-in-charge.(2.5 Sq.mm 3 core copper cable starter to motor) |
14 | Supply all material Labour T& P for interconnection of pipe line as per site condition etc all complete as per direction of Engineer-in-charge. |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail