National Highways and Infrastructure Development Corporation Limited-NHIDCL has published Widening/Improvement To 4 ( Four ) Lane With Paved Of Daboka - Parokhuwa Section ( Package 1 ) Of Nh 29 In The State Of Assam On Epc Mode. Submission Date for this Tender is 28-10-2021. Highway Construction Tenders in Assam Assam. Bidders can get complete Tender details and download the document.
Sr No | CorrigendumDate | Corrignedum | CorrigendumType | NewSubmissionDate |
1 | 29-Jul-2021 | Drawings | Other | 26-08-2021 |
2 | 29-Jul-2021 | DPR | Other | 26-08-2021 |
3 | 29-Jul-2021 | Schedules | Other | 26-08-2021 |
4 | 29-Jul-2021 | Corrigendum No. 1 | Other | 26-08-2021 |
5 | 09-Aug-2021 | Corrigendum No. 2 | Other | 26-08-2021 |
6 | 23-Aug-2021 | Corrigendum No. 3 | Date | 20-09-2021 |
7 | 31-Aug-2021 | Modified DCA | Technical Bid | 20-09-2021 |
8 | 31-Aug-2021 | Modified RFP | Technical Bid | 20-09-2021 |
9 | 31-Aug-2021 | Corrigendum No. 4 | Other | 20-09-2021 |
10 | 16-Sep-2021 | Addendum No. 1 | Other | 20-09-2021 |
11 | 20-Sep-2021 | Corrigendum No. 5 | Date | 05-10-2021 |
12 | 05-Oct-2021 | Corrigendum No. 6 | Date | 28-10-2021 |
Name of Work: Widening/Improvement to 4 (Four) Lane with Paved Shoulder from KM 38+500 to Km 51+246 (Design Chainage 38+500 to 50+710) of Daboka –Parokhuwa Section (Package 1) of NH 29 in the state of Assam on EPC mode | ||||
---|---|---|---|---|
Item Description | Item Code / Make | Quantity | Units | |
1 | Widening/Improvement to 4 (Four) Lane with Paved Shoulder from KM 38+500 to Km 51+246 (Design Chainage 38+500 to 50+710) of Daboka –Parokhuwa Section (Package 1) of NH 29 in the state of Assam on EPC mode | 1 | Nos. |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail