Public Works Department-PWD has published Providing And Laying Of Ogpc 25Mm Thick In Road From Chomogang To Tarchit . L-700M ( Under D . Plan ) . Submission Date for this Tender is 05-07-2021. Road Work Tenders in Tarchit Nyoma Jammu And Kashmir. Bidders can get complete Tender details and download the document.
Name of Work: Providing and laying of OGPC 25mm thick in road from Chomogang to Tarchit .L-700m (Under D.Plan) | |||||
---|---|---|---|---|---|
Sl. No. | Item Description | Item Code / Make | Quantity | Units | |
1 | 1 | Providing and applying tack coat using bitumen emulsion conforming to IS: 8887, using emulsion pressure distributer including preparing the surface and cleaning with mechanical broom.On W.B.M. /W.M.M. @ 0.4 Kg/sqm. | 2205 | Sqm | |
2 | 2 | 2.5 cm premix carpet surfacing with 2.25cum. and 1.12cum of stone chippings of 13.2 mm and 11.2 size respectively per 100 sqm. and 52kg. and 56 kg. of hot bitumen per cum. of stone chippings of 13.2 mm and11.2 mm size respectively including a tack coat with hot straight run bitumen including consolidation with road roller of 6 to 9 tonne capacity etc. complete (tack coat to be paid for separately)\nWith paving Asphalt 80/100 heated and\nthen mixed with solvent at the rate of 70\ngrams per kg of asphalt. | 2205 | Sqm | |
3 | 3 | Providing and laying seal coat of premixed fine aggregate(passing 2.36 mm and retained on 180 micron sieve) with bitumen using 128 kg of bitumen of grade VG-10 bitumen per cum of fine aggregate and 0.60 cum of fine aggregate per 100 sqm of road surface including rolling and finishing with road all complete. | 2205 | Sqm | |
4 | 4 | Earth work in rough excavation, banking excavated earth in layers not exceeding\n20 cm in depth, breaking clods, watering, rolling each layer with 1/2 tonne roller or\nwooden or steel rammers, and rolling every 3rd and top-most layer with power roller\nof minimum 8 tonnes and dressing up in embankments for roads, flood banks,\nmarginal banks and guide banks or filling up ground depressions, lead upto 50 m and\nlift upto 1.5 m in all kinds of soil: | 210 | Cum | |
5 | 5 | Carriage of material by M.T including loading unloading Complete Job. Earth an avg. lead 01 Km. | 210 | Cum |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail