Installation And Commissioning Of Aerial Bunch Cable And Ug Cable For Plant To Township Power Supply Under Capex 21-22 , Laying & Termination Of Micro-Tunnelling Work With Laying Of 110 Mm Dia Hdpe Pipe ( Pe-80 , Pn-6 ) As Per Instruction Of Site Engineer And As Per Site ConditionFor Laying Of U . G Cable Including Supply Of Hdpe Pipe As Per Including Preparation And Submission Of Drawing For Such CableLaying With Hdpe Pipe Including Laying Of 11 Kv Xlpe 3C X 120 Sqmm Cable Through The Hdpe Pipe . , End Termination Cable Alongwith Kits , End Termination Of 3Cx120sq . Mm 11Kv Grade Al Cable AlongWith Supply Of Jointing Kits ( Heat Shrinkable OfMake:3M/Raychem ) Complete With All Accessories Including Lugs . , Fitting , Fixing & Fabrication Of CableRiser Suitable For 3Cx120 Sq . Mm Al Armoured Cable Along WithSupply Of Gi Pipe ( 100Mm Dia G . I . Angle , Flat , Nuts , Bolts As PerRequirements , Fitting & Fixing Of 900Mm Cd PolymerComposite Pin Insulator Along With Supply Of Same And OtherAccessories Required For The Job , Uprouting Of Existing Rail Pole AndConversion Of Single Rail Pole To Double Rail Pole Structure WithRail Pole Including Cement Concrete Along With Supply Of RailPoles ( 01Nos Of 13Mtr , Make: Sail , 51 . 89 Kg/M , 880 GradeAs Per Irs: T-12-2009 ) , G . I Nuts , Bolts , Angles , Flats Etc . As PerRequirements And Painting . The Excavated Earth Pit Shall Be FilledWith Shifted Soil And Rammed Properly . Pole Structure Should BeDouble Earthed With 6Mm Gi Wire And Earth Spike . , Erection Of Quadraple Structure WithRail Pole Including Cement Concrete Along With Supply Of Rail Poles ( 04 Nos Of 13Mtr , Make: Sail , 51 . 89 Kg/M , 880 GradeAs Per Irs: T-12-2009 ) , G . I Nuts , Bolts , Angles , Flats Etc . As PerRequirements And Painting . The Excavated Earth Pit Shall Be FilledWith Shifted Soil And Rammed Properly . Pole Structure Should BeDouble Earthed With 6Mm Gi Wire And Earth Spike . , Uprouting Of Existing Rail Pole AndConversion Of Single Rail Pole To Quadraple Structure With RailPole Including Cement Concrete Along With Supply Of Rail Poles ( 06 Nos Of 13Mtr , Make: Sail , 51 . 89 Kg/M , 880 Grade AsPer Irs: T-12-2009 ) , G . I Nuts , Bolts , Angles , Flats Etc . As PerRequirements With Painting . The Excavated Earth Pit Shall Be FilledWith Shifted Soil And Rammed Properly . Pole Structure Should BeDouble Earthed With 6Mm Gi Wire And Earth Spike . , Erection Of 400A , 11Kv Tpgo IsolatorAlong With Supply Of Isolator , Gi Angle/Channel/Flats/Bolts/Nuts Etc . As Per Requirements . Two No Isolator Will Be Incomer And OneWill Out Going Isolator . Both Incomer Isolator Will Be MechanicallyInterlocked So One Can Put In Service At A Time . , Eathing Of Single Pole , Double Pole AndQuadraple Strutcres By Suitable Earth By Using Gi Earth Spike ( 50Mm Dia , 3Mtr . Long ) Including Connection With Structures Through6Mm Gi Wire Along With Supply Of Gi Spike , 6Mm Gi Wire , &All Others Accessories As Per Requirement , Dismantle Of Existing Bare ConductorLine Returned To Wbpdcl Store , Erecting Of Achor Clamp And SuspensionClamp For Ht Ab Cable With Supply Of Anchor Clamp , Suspension Clamp & Eye Hook , 1C X 180 Sq . Mm Messenger Wire For 11 Kv Aerial Bunched Cable , Erecting Of Ht Stay Grounding ( 1830 X 20Mm ) With Supply Of Stay Set Ht Gi 1830X 20Mm ForDistribution Line Safe Working Load 7900 Kg With Rachet Nut , GiSaty Wire ( 7/10 Swg- 7 Kg ) , Ht 11 Kv 88 Kn Guy Insulator ( 01 Nos ) And All Other Accessories As Per Requirement . , Uprouting Of Existing Rail Pole AndErection Of Same Place Of Single Rail Pole With Rail Pole IncludingCement Concrete Along Gi Nuts , Bolts , Angles , Flats Etc . As PerRequirements And Painting . The Excavated Earth Pit Shall Be FilledWith Shifted Soil And Rammed Properly . Pole Structure Should BeDouble Earthed With 6Mm Gi Wire And Earth Spike . , Erection Of Single Rail Pole IncludingCement Concrete Along With Supply Of Rail Poles ( 18 Nos Of13Mtr , Make: Sail , 51 . 89 Kg/M , 880 Grade As Per Irs:T-12-2009 ) , G . I Nuts , Bolts , Angles , Flats Etc . As Per RequirementsAnd Painting . The Excavated Earth Pit Shall Be Filled With ShiftedSoil And Rammed Properly . Pole Structure Should Be Double EarthedWith 6Mm Gi Wire And Earth Spike . , Erection Of Single Thes Rail PoleIncluding Cement Concrete Along With Supply Of Rail Poles ( 05Nos Of 13Mtr , Make: Sail , 51 . 89 Kg/M , 880 Grade As PerIrs: T-12-2009 ) , G . I Nuts , Bolts , Angles , Flats Etc . As PerRequirements And Painting , End Termination Cable Alongwith Kits . End Termination Of 1Cx95sq . Mm 11Kv Grade Al Cable AlongWith Supply Of Jointing Kits ( Heat Shrinkable OfMake:3M/Raychem ) Complete With All Accessories Including Lugs , Stringing & Sagging 11 Kv Ab Cable 3C95 Sq Mm +1 C 180 Sq Mm , Existing Single Rail Pole IncludingCement Concrete Along With Supply Of Rail Poles ( 05 Nos Of13Mtr , Make: Sail , 51 . 89 Kg/M , 880 Grade As Per Irs:T-12-2009 ) , G . I Nuts , Bolts , Angles , Flats Etc . As Per RequirementsAnd Painting . The Excavated Earth Pit Shall Be Filled With ShiftedSoil And Rammed Properly . Pole Structure Should Be Double EarthedWith 6Mm Gi Wire And Earth Spike , Fixing Of Iron Materials , Existing Double Rail Pole IncludingCement Concrete Along With Supply Of Rail Poles ( 05 Nos Of13Mtr , Make: Sail , 51 . 89 Kg/M , 880 Grade As Per Irs:T-12-2009 ) , G . I Nuts , Bolts , Angles , Flats Etc . As Per RequirementsAnd Painting . The Excavated Earth Pit Shall Be Filled With ShiftedSoil And Rammed Properly . Pole Structure Should Be Double EarthedWith 6Mm Gi Wire And Earth Spike , Fixing Of Iron Materials , Existing Quadraple Structure Rail PoleIncluding Cement Concrete Along With Supply Of Rail Poles ( 05Nos Of 13Mtr , Make: Sail , 51 . 89 Kg/M , 880 Grade As PerIrs: T-12-2009 ) , G . I Nuts , Bolts , Angles , Flats Etc . As PerRequirements And Painting . The Excavated Earth Pit Shall Be FilledWith Shifted Soil And Rammed Properly . Pole Structure Should BeDouble Earthed With 6Mm Gi Wire And Earth Spike , Fixing Of IronMaterials . , Cement Concrete Along With Supply Of MetMaterials For Basement Of New Isolators . Approximate 100 Sq . Ft . , Supply & Fixing Drawing Board Of LayoutAt 1 . 5X1 Mtr . 4 Mm Thickness G . I Sheet With Structure . , Supply & Fixing Danger Board For 11KvPole . , Supply & Fixing Of 11Kv La . , Supply & Fixing Of Barbet Wire 3Ft LongWith Clam ( 65X6 Mm Flat-2Pair ) , Supply & Fixing Of Polymeric InsulatorWith Bus Bar , 11Kv For Two 1C X 95 Sqmm Cable TerminationRaychem