Purvanchal Vidyut Vitaran Nigam Limited has published Work Against Sanctioned Package No.09/2021-22 (Under Deposit Scheme) Under Electricity Urban Distribution Division-Ii, Gorakhpur. Submission Date for this Tender is 30-06-2021. Coats and Jackets Tenders in AREA OF EUDD-II GKP Uttar Pradesh. Bidders can get complete Tender details and download the document.




Tender Notice

28216922
Work Against Sanctioned Package No.09/2021-22 (Under Deposit Scheme) Under Electricity Urban Distribution Division-Ii, Gorakhpur
Open Tender
Indian
Uttar Pradesh
AREA OF EUDD-II GKP
30-06-2021

Tender Details

Work Against Sanctioned Package No.09 / 2021-22 ( Under Deposit Scheme ) Under Electricity Urban Distribution Division-Ii, Gorakhpur-2 Loading, Unloading And Safe Carriage Of Following Materials From Store Centre, Gorakhpur To Je Dump Store And Je Dump Store To Work Site With Proper Stacking :- 3 3X185 Mm2 Xlpe Cable 11 Kv ( 500X2 ) Mtr 4 3X120 Mm2 Xlpe Cable 11 Kv ( 120X2 ) Mtr 5 St Pole 11 Mtr.Long. 6 11 Kv Dropper Angle 7 11 Kv Top Channel 8 Stay Complete With 5Kg Wire 9 Earthing Complete 10 Cable Jointing Kit I / D ( 3X120mm2 Xlpe 11 Kv ) 11 Cable Jointing Kit O / D ( 3X120mm2 Xlpe 11 Kv ) 12 Cable Jointing Kit I / D ( 3X185mm2 Xlpe 11 Kv ) 13 Acsr Dog Conductor 14 11 Kv Vcb For I / C Ctr 600 / 300 / 5A, 350 Mva 15 11 Kv Vcb For O / G Ctr 200 / 100 / 5A, 350 Mva 16 11 / 0.4 Kv 630 Kva T / F 17 11 Kv Tpmo 18 11 Kv Fuse Set 19 Supply Of Following Material / Fitting Complete In All Respect :- 20 Holding Clamp For Top, Tpmo Fuse Set Etc. 21 Nuts & Bolts 22 Z Clamp For 630 Kva T / F 23 Al Lugs For 630 Kva T / F 24 6 Inch Dia G.I. Pipe 3M Long 25 Hdpe Pipe 160 Mm Dia Pn-6 Pe-80 With Elbow And Socket For 11 Kv Cable 26 The Excavation Of 2 Nos. Foundation Pit Of Size 750Mmx450mm And Having Depth Of 1 / 6Th Of The Full Length Of The Pole. Fabrication & Erection Of Double Pole With Fixing Of Necessary Clamps & Accessories ( Top Channel, Dropper Angle Etc. ) As Per Required. All Required Materials Such As Holding Clamp / Stp Clamp, Nuts & Bolts Off Size Etc Will Be Provided By The Contractor. Ngrouting Of Pole In Cc 1:4:8 ( Cement, Sand & 40 Mm Brick Ballast ) , Grouting Will Be Done In The Block Of Size 450X450 Mm X Depth Upto Ground Level And Backfilling Of Pits With Mud Completely And Leveling Etc ( Material Provided By Contractor ) . Nmaking Plinth Around Pole Height 300 Mm Above Ground Level With Top 100 Mm Is Kept Tapered So That No Rainwater Gets Accumulated On The Top. Nall Work Will Be Done As Per Respo Norms & Relevent Is Specification. 27 Painting Of Pole By Double Coating Aluminium & Red Oxide Paint. Paint Will Be Provided By Contractor 28 Earthing Of St Pole By Ms Earthing Rod & 6 Swg Earthing Wire As Per Respo Norms. 29 Erection And Grouting Of Stay In Cc Ratio 1:4:8 Of Cement, Sand And Stone Ballast Including Cost Of Grouting Material With Nozelling And Binding Of Stay Wire ( Complete Work ) 30 Construction Of T / F Plinth Of Size 2X2x1.2 Mtr With The Help Of First Class Brick & 9 Masonary In The Ratio 1:4 Cement & Sand Coarse. Filling The Structure Completely And Plastering Outer Surface As Per Respo Norms. Top Of The Plinth Covered With 4 Rcc Slab Of Ratio 1:1.5:3 ( Cement, Sand & Concrete ) Grouting With 2 Nos. Ismc Size 125X65x6 Mm ( Confirming To Is 808:1989 ) Of 2000 Mm Long For Resting. All Required Materials Will Be Provided By The Contractor. 31 Grill Fencing Of 11 / 0.4 Kv S / S Shall Be Made Of Rectangular Of Size & Height Approx 2 Meter As Per Site Requirement With Fabrication 50X50x5 Mm Angel The Frame Is Also Have 1 No. Horizontal Runner Of Ms Flat 40X5 Welded In Middle To Support Of Grill, Having A Gate On Road Side Must Have Provision Of Locking Arrangement. The Work Is Including Painting Of Fencing As Per Norms. Work Will Be Done As Per Respo Specification. 32 Fabrication, Errection, Commissioning & Testing Of 630 Kva T / F On Plinth With All Accessories Including Make Its Lt And Ht Connection. All Neessary Materials Will Be Supplied By The Contractor. 33 Chemical Earthing Of Transformer ( Body+Neutral ) As Per Is Code 3043 - 1987 Specification 34 Laying Of Hdpe Pipe 160 Mm Diameter For Laying Of 11 Kv 3X185 Sq Mm Xlpe Cable By Horizontal Drilling Method After Digging Of Kachcha / Pakka Road For Pit Including Cost Of Bricks, Sand Etc Required As Per Norms. The Hdpe Pipe Shall Be Of Pe 80 Grade With Pressure Rating Pn6 Conforming To Is 4984 / 1995 And Shall Have Wall Thickness Of 6.20 To 7.10 Mm ( All Necessary Material Will Be Supplied By Contractor ) 35 Dressing, Marking, Tagging And Safe Laying Of Under Ground 11 Kv 3X185 Sq Mm Xlpe Cable Into Hdpe Pipe By Horizontal Drilling Method As Per Respo Norms. The Depth Of Horizontal Drilling Shall Be Between 2 To 3 Meters Or As Per Site Required. 36 Dressing, Marking, Tagging And Hoisting Of 11 Kv 3X120 Sq Mm Xlpe Cable For 630 Kva T / F With Complete Work. 37 Errection Of 11 Kv 3X120 Mm² Xlpe Cable Jointing Kit Indoor / Outdoor With Complete Work 38 Errection Of 11 Kv 3X185 Mm² Xlpe Cable Jointing Kit Indoor With Complete Work 39 Hoisting Of Cable On Existing Double Pole Using Top Channel, G.I. Pipe 6Dia 3 Mtr. Long With Complete Work 40 Installation, Commissioning & Testing Of 11 Kv Vcb For O / G Ctr 200 / 100 / 5A, 350 Mva Including Making Plinth And Foundation Of Vcb. Complete All Connection In All Respect. 41 Installation, Commissioning & Testing Of 11 Kv Vcb For I / C Ctr 600 / 300 / 5A, 350 Mva Including Making Plinth And Foundation Of Vcb. Complete All Connection In All Respect. 42 Erection Of 11 Kv Fuse Set & Tpmo 43 Earthing Of 11 Kv Vcb 44

Key Value

Document Fees
INR 3540 /-
EMD
INR 28000.0 /-
Tender Value
Refer document

BOQ Items

Name of Work: FOR THE WORK AGAINST SANCTIONED PACKAGE NO.09/2021-22 (UNDER DEPOSIT SCHEME) UNDER ELECTRICITY URBAN DISTRIBUTION DIVISION-II, GORAKHPUR
Sl. No. Item Description Item Code / Make Quantity Units
1 0 fo|qr uxjh; forj.k [k.M&f}rh; xksj[kiqj ds vUrxZr tek ;kstuk ys[kk'kh"kZ esa Lohd`r iSdst la[;k 09@2021&22 ¼egkuxj xksj[kiqj esa 25 ux bysfDVªd clksa ds pkftZax LVs'ku gsrq egsljk esa LFkkfir gksus okys cl pkftZax LVs'ku ij Lohp fx;j lfgr 4 ux 630 ds0oh0,0 ifjorZd LFkkiuk dk dk;Z½ ds dk;ksZ dks lseh VuZdh vk/kkj ij djk;s tkus gsrq dk;Z dk fooj.k%&
2 1 Loading, unloading and safe carriage of following materials from Store Centre, Gorakhpur to JE dump Store and JE dump Store to work site with proper stacking :-
3 1.01 3x185 mm2 XLPE cable 11 KV (500x2) MTR 1000 Mtr
4 1.02 3x120 mm2 XLPE cable 11 KV (120x2) mtr 240 Mtr
5 1.03 ST Pole 11 mtr.Long. 8 No.
6 1.04 11 KV Dropper Angle 8 No.
7 1.05 11 KV Top channel 4 No.
8 1.06 Stay complete with 5kg wire 8 No.
9 1.07 Earthing Complete 8 No.
10 1.08 Cable jointing kit I/D (3x120mm2 XLPE 11 KV) 8 No.
11 1.09 Cable jointing kit O/D (3x120mm2 XLPE 11 KV) 8 No.
12 1.1 Cable jointing kit I/D (3x185mm2 XLPE 11 KV) 6 No.
13 1.11 ACSR Dog Conductor 0.2 Km
14 1.12 11 KV VCB for I/C CTR 600/300/5A,350 MVA 1 No.
15 1.13 11 KV VCB for O/G CTR 200/100/5A,350 MVA 4 No.
16 1.14 11/0.4 KV 630 KVA T/F 4 No.
17 1.15 11 KV TPMO 4 No.
18 1.16 11 KV Fuse Set 4 No.
19 2 Supply of following material/fitting complete in all respect :-
20 2.01 Holding clamp for Top,TPMO Fuse set etc. 28 No.
21 2.02 Nuts & Bolts 6 Kg
22 2.03 Z clamp for 630 KVA T/F 16 No.
23 2.04 Al Lugs for 630 KVA T/F 16 No.
24 2.05 6 inch dia G.I. pipe 3m long 24 mtr.
25 2.06 HDPE Pipe 160 mm dia PN-6 PE-80 with elbow and socket for 11 KV cable 1000 Mtr
26 3 The excavation of 2 nos. foundation pit of size 750mmX450mm and having depth of 1/6th of the full length of the pole. Fabrication & erection of double Pole with fixing of necessary clamps & accessories (Top Channel, Dropper Angle etc.) as per required. All required materials such as Holding clamp/STP clamp, Nuts & Bolts off size etc will be provided by the contractor.\nGrouting of Pole in cc 1:4:8 (Cement, sand & 40 mm brick ballast), Grouting will be done in the block of size 450x450 mm x depth upto ground level and backfilling of pits with mud completely and leveling etc (Material provided by Contractor).\nMaking plinth around Pole height 300 mm above ground level with top 100 mm is kept tapered so that no rainwater gets accumulated on the top. \nAll work will be done as per RESPO norms & relevent IS Specification. 4 Nos.
27 4 Painting of Pole by double coating Aluminium & Red oxide paint. Paint will be provided by contractor 8 Nos
28 5 Earthing of ST Pole by MS earthing Rod & 6 SWG earthing Wire as per RESPO norms. 8 Nos
29 6 Erection and grouting of stay in CC ratio 1:4:8 of Cement, Sand and Stone Ballast including cost of grouting material with nozelling and binding of stay wire (Complete work) 8 Nos
30 7 Construction of T/F plinth of size 2x2x1.2 mtr with the help of first class brick & 9" masonary in the ratio 1:4 cement & sand coarse. Filling the structure completely and plastering outer surface as per RESPO norms. Top of the plinth covered with 4" RCC Slab of ratio 1:1.5:3 (Cement, sand & concrete) grouting with 2 Nos. ISMC size 125X65X6 MM (confirming to IS 808:1989) of 2000 mm long for resting. All required materials will be provided by the contractor. 4 Nos
31 8 Grill fencing of 11/0.4 KV S/S shall be made of rectangular of size & height approx 2 meter as per site requirement with fabrication 50X50X5 mm angel the frame is also have 1 no. Horizontal runner of MS flat 40x5 welded in middle to support of grill, having a gate on road side must have provision of locking arrangement. The work is including painting of fencing as per norms. Work will be done as per RESPO specification. 4 Nos
32 9 Fabrication, errection, commissioning & Testing of 630 KVA T/F on Plinth with all accessories including make its LT and HT connection. All neessary materials will be supplied by the Contractor. 4 Nos
33 10 Chemical earthing of Transformer (Body+Neutral) as per IS Code 3043 - 1987 specification 8 Nos
34 11 Laying of HDPE Pipe 160 mm Diameter for laying of 11 KV 3x185 sq mm XLPE Cable by horizontal drilling method after digging of Kachcha/Pakka road for pit including cost of Bricks, sand etc required as per norms. The HDPE pipe shall be of PE 80 grade with pressure rating PN6 conforming to IS 4984/1995 and shall have wall thickness of 6.20 to 7.10 mm (All necessary material will be supplied by contractor) 1000 mtr
35 12 Dressing, Marking, Tagging and Safe Laying of under ground 11 KV 3X185 sq mm XLPE Cable into HDPE Pipe by Horizontal drilling method as per RESPO norms. The Depth of horizontal drilling shall be between 2 to 3 meters or as per site required. 1000 mtr
36 13 Dressing, Marking, Tagging and Hoisting of 11 KV 3X120 sq mm XLPE cable for 630 KVA T/F with complete work. 240 mtr
37 14 Errection of 11 KV 3x120 mm² XLPE Cable Jointing Kit Indoor/Outdoor with complete work 16 Nos.
38 15 Errection of 11 KV 3x185 mm² XLPE Cable Jointing Kit Indoor with complete work 6 Nos.
39 16 Hoisting of cable on existing double pole using Top Channel, G.I. Pipe 6"dia 3 mtr. Long with complete work 2 Nos.
40 17 Installation, commissioning & Testing of 11 KV VCB for O/G CTR 200/100/5A, 350 MVA including making plinth and foundation of VCB. Complete all connection in all respect. 4 No.
41 18 Installation, commissioning & Testing of 11 KV VCB for I/C CTR 600/300/5A, 350 MVA including making plinth and foundation of VCB. Complete all connection in all respect. 1 No.
42 19 Erection of 11 KV Fuse Set & TPMO 4 Nos.
43 20 Earthing of 11 KV VCB 5 No.
44 Total in Figures
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail