Aligarh Development Authrority-ADA has published Financial Year 2021-22 Main Plantation Work At Anoopshahar Road Site At Pac Ground With Barbed Wire Work. Submission Date for this Tender is 21-06-2021. Electrification Work Tenders in Aligarh Uttar Pradesh. Bidders can get complete Tender details and download the document.
Name of Work: Afforestation and Installing of Barbed Wire in PAC Ground at Anoopshahar Road for Financial Year 2021-22 | |||||
---|---|---|---|---|---|
Sl. No. | Item Description | Item Code / Make | Quantity | Units | |
1 | 1 | Afforestation Description | BI01010001010000000000000515BI0100001112 | ||
2 | 1.01 | Plantation of tree as per requirement including supply of tree amnure diging of pit irrigation of plant as per direction of Engineer-In-Charge. Tree should be provided free of cost | BI01010001010000000000000515BI0100001113 | 10000 | Nos |
3 | 1.02 | Second Year Maintenance | BI01010001010000000000000515BI0100001114 | 10000 | Nos |
4 | 1.03 | Third Year Maintenance | BI01010001010000000000000515BI0100001115 | 10000 | Nos |
5 | 2 | Excavation in foundation in ordinary soil (Loam,Clayor Sand) including lift upto 1.50 m and lead upto 30m and including of excavated earth into thr trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer In-charge upto a distance of 30m from the foundation trenches. | BI01010001010000000000000515BI0100001116 | 41 | cum |
6 | 3 | Providing and laying cement concrete in 1:5:10 (1cement:5 fine sand : 10 grade stone aggregrate 40mm norma size ) and curing complete, including cost of work in foundation and floors.(Fine sand not less than in 1.25 FM) | BI01010001010000000000000515BI0100001117 | 7 | cum |
7 | 4 | M.S. (tor steel or plain) in plain work such as R.C.C. Or R.B. Work including bending for proper shape & including supply of steel & its wastage, bend, hooks and authorised overlaping shall be measured and including cost of binding wire 16 mm dia bar used (8mm to 12 mm) | BI01010001010000000000000515BI0100001118 | 3196 | kg |
8 | 5 | Providing and laying in position specified grade of R.C.C. 1:1.50:3 ( 1 cement: 1.5 coarse sand : 3 stone aggregate ) including the cost of shuttering centering finishing and exculding reinenforcment all work . | BI01010001010000000000000515BI0100001119 | 45 | cum |
9 | 6 | Providing and fixing of barbed wire | BI01010001010000000000000515BI0100001120 | 2244 | kg |
10 | 7 | Mild steel or iron work in heavy sizez such as Built up gates record rack, roof work, gates etc. brought to required from including drilling holes revitting or welding where necessaryand also including supply of steel bolts, nuts, wastages etc. and their fixing required for proper completion of the work. | BI01010001010000000000000515BI0100001121 | 520 | kg |
11 | 8 | Painting Two coat over priming caot (but excluding cost ofpriming coat) on steel and other metal surface upto 10 cm width or girth or small articles not exceeding 0.10 sqm in area with superior synthetic enamel such asLuxol 3, Hi gloss Apcolite, Superlac, dulux, specifiedbbrushing to give and even shade and including the cleaning the surface of all dirt, dust and other foregin matter snd papering and scrapping including all cost of all material, labour, tools and plants etc required for proper completion of work. | BI01010001010000000000000515BI0100001122 | 7 | sqm |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail