Irrigation Department has published Reconstruction Of Damaged Bridges ( V . R . B . ) At Km . 1 . 650 And Km . 2 . 850 Of Karora Minor ( Lot-1 ). Submission Date for this Tender is 21-06-2021. Bridge Work Tenders in Lucknow Uttar Pradesh. Bidders can get complete Tender details and download the document.
Name of Work : Reconstruction of damaged bridges (V.R.B.) at km. 1.650 and Km. 2.850 of Karora Minor (Lot-1) | |||||
---|---|---|---|---|---|
Sl. No. | Item Description | Item Code / Make | Quantity | Units | |
1 | 1 | Re-Construction of V.R.B. (Box Culvert) at Km 1.650 Of Karora Mr. | |||
2 | 2 | Earth work in Making Road Diversion, bunds in Drain with partial dressing lead upto 30 meters, lift upto 1.5 meters excluding Mechanical compaction but inclusive of manual compaction and dressing to profiles. | 557.9 | Cum | |
3 | 3 | Demolishing RCC Work manually/By mechanical means I/C stacking of steel bars and disposal of unserviceable material withint 50 metres lead as per direction of Eng-in- charge. | 1.71 | Cum | |
4 | 4 | Demolishing brick work in Cement mortar manually/By mechanical means I/C stacking of unserviceable material withint 50 metres lead as per direction of Eng-in- charge. | 26.27 | Cum | |
5 | 5 | Hiring & engaging Diesel Pump of 5 H.P. with POL For Dewatering at site. | 5 | Hr | |
6 | 6 | E/w in cutting in foundation of box Culvert / Guide wall on channels including lead upto 30 M. And lift upto 1.5 M and disposal and back filling as per direction of engineer-in-charge. | 85.05 | Cum | |
7 | 7 | Filling local sand including all cost of material, manual compaction, raming & watering ,Labour T&P etc complete. | 81 | Cum | |
8 | 8 | Laying Plain Cement Concrete (M -15) in foundation 1:2:4 with stone grie including cost of material, labour, T&p etc, complete. | 24.35 | Cum | |
9 | 9 | Laying Reinforced Cement Concrete (M25 A20) in foundation , wall, slab etc. in 1:1:2 with stone grit including cost of material, labour, T&p etc, complete. | 29.28 | Cum | |
10 | 10 | Bending,Binding,Cutting and Placing in position reinforcement including all cost of labour and material T&P etc. required for porper completion of the work/MT. | 2.87 | MT | |
11 | 11 | Centring and shuttering For R.C.C. Work including rent of shuttering & all cost of labour and material T&P etc. required for porper completion of the work/M2. | 131.27 | Sqm | |
12 | 12 | Providing & Fixing 110 mm dia PVC drainage spouts complete in all respect including cost of all material, labour and T&P etc. as per drawing | 1.2 | RM | |
13 | 13 | Providing & Fixing 75 mm dia PVC weep holes complete in all respect including cost of all material, labour and T&P etc. as per drawing | 4 | RM | |
14 | 14 | Providing & Fixing Bitumen Joint filer Board For Expansion Joints. | 15.21 | Sqm | |
15 | 15 | Class 150 Brick work in 1:3 CM including 3 M lift and 60 M lead including all cost of material, labour, T&P etc. complete. | 42.73 | Cum | |
16 | 16 | Cement Pointing in 1:2 cement mortar including all cost of material, labour, T&P etc complete. | 82.7 | Sqm | |
17 | 17 | Cement washing including cost of all material labour T&P etc required for peoper completion of work. | 27.2 | Sqm | |
18 | 18 | Dry brick on edge pitching including preparation of sub grade and filling joints with local sand including cost of Material,Labour T&P etc. | 132.52 | Sqm | |
19 | 19 | Supplying and fixing of Iron Equal Angles 110x110x10x750mm Wheel Gard including cutting ,Earth work and fixing in position with CC (450x450x300mm) in 1:2:4 with stont grit with one coat of red oxide primer.(all work Done as par direction of Engineer-in- charge) including cost of all material, Labour T&P etc . | 4 | No. | |
20 | 20 | Re-Construction of V.R.B. (Box Culvert) at Km 2.850 Of Karora Mr. | |||
21 | 21 | Earth work in Making Road Diversion, bunds in Drain with partial dressing lead upto 30 meters, lift upto 1.5 meters excluding Mechanical compaction but inclusive of manual compaction and dressing to profiles. | 500 | Cum | |
22 | 22 | Demolishing RCC Work manually/By mechanical means I/C stacking of steel bars and disposal of unserviceable material withint 50 metres lead as per direction of Eng-in- charge. | 1.71 | Cum | |
23 | 23 | Demolishing brick work in Cement mortar manually/By mechanical means I/C stacking of unserviceable material withint 50 metres lead as per direction of Eng-in- charge. | 26.27 | Cum | |
24 | 24 | Hiring & engaging Diesel Pump of 5 H.P. with POL For Dewatering at site. | 5 | Hr | |
25 | 25 | E/w in cutting in foundation of box Culvert / Guide wall on channels including lead upto 30 M. And lift upto 1.5 M and disposal and back filling as per direction of engineer-in-charge. | 109.94 | Cum | |
26 | 26 | Filling local sand including all cost of material, manual compaction, raming & watering ,Labour T&P etc complete. | 67.5 | Cum | |
27 | 27 | Laying Plain Cement Concrete (M -15) in foundation 1:2:4 with stone grie including cost of material, labour, T&p etc, complete. | 24.31 | Cum | |
28 | 28 | Laying Reinforced Cement Concrete (M25 A20) in foundation , wall, slab etc. in 1:1:2 with stone grit including cost of material, labour, T&p etc, complete. | 29.42 | Cum | |
29 | 29 | Bending,Binding,Cutting and Placing in position reinforcement including all cost of labour and material T&P etc. required for porper completion of the work/MT. | 2.9 | MT | |
30 | 30 | Centring and shuttering For R.C.C. Work including rent of shuttering & all cost of labour and material T&P etc. required for porper completion of the work/M2. | 133.41 | Sqm | |
31 | 31 | Providing & Fixing 110 mm dia PVC drainage spouts complete in all respect including cost of all material, labour and T&P etc. as per drawing | 1.2 | RM | |
32 | 32 | Providing & Fixing 75 mm dia PVC weep holes complete in all respect including cost of all material, labour and T&P etc. as per drawing | 4 | RM | |
33 | 33 | Providing & Fixing Bitumen Joint filer Board For Expansion Joints. | 15.21 | Sqm | |
34 | 34 | Class 150 Brick work in 1:3 CM including 3 M lift and 60 M lead including all cost of material, labour, T&P etc. complete. | 38.57 | Cum | |
35 | 35 | Cement Pointing in 1:2 cement mortar including all cost of material, labour, T&P etc complete. | 58.7 | Sqm | |
36 | 36 | Cement washing including cost of all material labour T&P etc required for peoper completion of work. | 30.6 | Sqm | |
37 | 37 | Dry brick on edge pitching including preparation of sub grade and filling joints with local sand including cost of Material,Labour T&P etc. | 276.6 | Sqm | |
38 | 38 | Supplying and fixing of Iron Equal Angles 110x110x10x750mm Wheel Gard including cutting ,Earth work and fixing in position with CC (450x450x300mm) in 1:2:4 with stont grit with one coat of red oxide primer.(all work Done as par direction of Engineer-in- charge) including cost of all material, Labour T&P etc . | 4 | No. |